| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Quoted Lowest rate |
| 2 | L2₹1.4 CrRejected-Finance CHIEF ENGINEER DRAINAGE CUM MINING AND GEOLOGY 2 | ₹1.4 Cr | L2 | Rejected-Finance Quoted Highest rate |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
13 May 2026, 10:00 amClosed
Ropa PWRMDC Diviosn Doraha
Ropa PWRMDC Diviosn Doraha
CONSTRUCTION OF BRICK LINING OF WATERCOURSE OF OUTLET RD 10331 R OF TAJPUR MINOR OF PAKHOWAL DISTY VILLAGE PAKHOWAL DISTRICT LUDHIANA
2026_WR_166424_1
NIT 29 of 2026
Open Tender
Construction Works
180 days
Doraha
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
₹2.6 L
Yes
Ropa PWRMDC Diviosn Doraha
4 Jun 2026
18 Apr 2026
13 May 2026
18 Apr 2026
13 May 2026
18 Apr 2026
22 Apr 2026
Rewinding of submersible motor pump set of 15 HP including suplly of finolex/ISI marked rewinding wire, GM moter Bush, Rotor sleeve, CI Bowl, Wooden Sticks, GM neckring and Rotor Grinding Polishing and Balancing including cost of other Misc. Items and Labour after deduction Scrap value of material
Rewinding of submersible motor pump set of 25 HP including suplly of finolex/ISI marked rewinding wire, GM moter Bush, Rotor sleeve, CI Bowl, Wooden Sticks, GM neckring and Rotor Grinding Polishing and Balancing including cost of other Misc. Items and Labour after deduction Scrap value of material
Item Rate BoQ
E-Tender Notice No. :- 29/2026/ PWRMDC/Ropar-Doraha/ Dated 18-04-2026
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Rehandling of earthwork recently executed
Dag belling single kassi stroke minimum 7.5 cm depth.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of Bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Dressing of Bed and Preparation of Sub-grade for Lining complete in all respects as per pwd specifications
First Class Burnt Brick laid in cement sand mortar 1:6 in foundation and plinth
10 mm thick Cement Plaster with cement sand mortar 1:4 on Side Walls
10 mm thick Cement Plaster with cement sand mortar 1:4 on bed & top of sidewalls
RCC work hand mixed 1:2:4 for slab including steel reinforcement
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or battering)
Fixing of frame
Supplying & Laying Dry Brick Bats
Cement Concrete 1:3:6 with stone ballast or shingle work mixing by mechanical means using concrete mixer volumetric type
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Filling Contraction/Construction Joint with special impervious hot pour 12.5mm wide.
Providing, lowering 500 mm dia NP-3 pipes in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineerin-charge including all cartage etc.
Note : Credit amount, if any will be deducted as per sanctioned estimate.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQNIT29RD10331R.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid