Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.2 LAccepted-Finance | ₹40.2 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹43.9 L+₹3.7 L (9.25%)Rejected-Finance | ₹43.9 L+₹3.7 L (9.25%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹44.9 L+₹4.7 L (11.7%)Rejected-Finance 22 2 BAKRAHAT ROAD THAKURPUKUR KOLKATA 700063 | KOLKATA | KOLKATA | WEST BENGAL | 700063 | ₹44.9 L+₹4.7 L (11.7%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹46.4 L+₹6.2 L (15.4%)Rejected-Finance | ₹46.4 L+₹6.2 L (15.4%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹47.1 L+₹6.9 L (17.1%)Rejected-Finance | ₹47.1 L+₹6.9 L (17.1%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | GAYATRI ENTERPRISE L2 | M/S J S ENTERPRISES L9 | KWALITY CONSTRUCTION L6 | ELECTRO FREEZE L3 | KT CONSTRUCTIONS L10 | ROY CONSTRUCTION L8 | NUPUR CONSTRUCTION L7 | M/s OM HINDUSTAN CONSTRUCTION PVT. LTD. L4 | PRASAD ENTERPRISE L1 | KAY BEE ASSOCIATES L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, complete all as specified and as directed by Engr in chg. | 80 | Each | 265 ₹21,200 | 296 ₹23,680 | 284 ₹22,720 | 270 ₹21,600 | 275 ₹22,000 | 293 ₹23,440 | 290 ₹23,200 | 279 ₹22,320 | 170 ₹13,600 Lowest | 280 ₹22,400 |
| 2.00 | M&L for cement concrete 1:3:6 (Type C2) in foundations, filling and mass concrete complete all as specified and as directed by Engr in chg. | 50 | Cum | 7,700 ₹3,85,000 | 8,560 ₹4,28,000 | 8,252 ₹4,12,600 | 7,800 ₹3,90,000 | 8,168 ₹4,08,400 | 8,569 ₹4,28,450 | 8,350 ₹4,17,500 | 8,073 ₹4,03,650 | 4,950 ₹2,47,500 Lowest | 8,100 ₹4,05,000 |
| 3.00 | Dismantling of stone slabs and tiling of any description or thickness in floor, aprons etc., laided bedded and pointed in any mortar complete all as specified and as directed. | 30 | Per 10 Sqm | 725 ₹21,750 Lowest | 790 ₹23,700 | 793 ₹23,790 | 750 ₹22,500 | 790 ₹23,700 | 793 ₹23,790 | 806 ₹24,180 | 776 ₹23,280 | 1,150 ₹34,500 | 750 ₹22,500 |
| 4.00 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed by Engr in chg. | 12 | Cum | 9,185 ₹1,10,220 | 10,000 ₹1,20,000 | 9,728 ₹1,16,736 | 9,195 ₹1,10,340 | 9,740 ₹1,16,880 | 10,051 ₹1,20,612 | 9,884 ₹1,18,608 | 9,516 ₹1,14,192 | 6,900 ₹82,800 Lowest | 9,500 ₹1,14,000 |
| 5.00 | M&L for 100mm thick cement concrete type D-2 1:4:8 (using 40 mm graded stone aggregate) in flooring/ hard standing finished even and fair surface complete all as specified and as directed. | 300 | Sqm | 610 ₹1,83,000 Lowest | 687 ₹2,06,100 | 655 ₹1,96,500 | 620 ₹1,86,000 | 654 ₹1,96,200 | 685 ₹2,05,500 | 666 ₹1,99,800 | 641 ₹1,92,300 | 630 ₹1,89,000 | 650 ₹1,95,000 |
| 6.00 | M&L for Screed bed or bedding layer of mortar 20mm thick in cement mortar (1:6) for laying floor finishes complete all as specified and as directed by Engr in chg. | 300 | Sqm | 295 ₹88,500 | 315 ₹94,500 | 317 ₹95,100 | 300 ₹90,000 | 318 ₹95,400 | 317 ₹95,100 | 322 ₹96,600 | 310 ₹93,000 | 250 ₹75,000 Lowest | 300 ₹90,000 |
| 7.00 | M&L for Chequered cement concrete tiles 30cm x 30cm x 25mm thick, set, jointed with grey cement and no pigment and pointed in neat cement slurry in floors incl taking down old one complete all as specified and as directed. | 300 | Sqm | 1,110 ₹3,33,000 Lowest | 1,428 ₹4,28,400 | 1,184 ₹3,55,200 | 1,120 ₹3,36,000 | 1,187 ₹3,56,100 | 1,425 ₹4,27,500 | 1,204 ₹3,61,200 | 1,159 ₹3,47,700 | 1,290 ₹3,87,000 | 1,350 ₹4,05,000 |
| 8.00 | Demolition of unreinforced concrete in ground floors and paving not exceeding 15 cm thickness (above or below ground level)complete all as specified and as directed. | 20 | Cum | 1,480 ₹29,600 | 1,576 ₹31,520 | 1,576 ₹31,520 | 1,490 ₹29,800 | 1,575 ₹31,500 | 1,575 ₹31,500 | 1,601 ₹32,020 | 1,542 ₹30,840 | 450 ₹9,000 Lowest | 1,490 ₹29,800 |
| 9.00 | Demolition of reinforced concrete in ground floors and paving not exceeding 15 cm thickness above and below ground level) complete all as specified and as directed. | 5 | Cum | 1,725 ₹8,625 | 1,862 ₹9,310 | 1,851 ₹9,255 | 1,750 ₹8,750 | 1,855 ₹9,275 | 1,860 ₹9,300 | 1,881 ₹9,405 | 1,811 ₹9,055 | 550 ₹2,750 Lowest | 1,760 ₹8,800 |
| 10.00 | Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5m deep and getting out soft/loose soil complete all as specified and as directed. | 50 | Cum | 330 ₹16,500 Lowest | 370 ₹18,500 | 354 ₹17,700 | 335 ₹16,750 | 355 ₹17,750 | 356 ₹17,800 | 360 ₹18,000 | 346 ₹17,300 | 450 ₹22,500 | 350 ₹17,500 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
6 Aug 2026, 6:00 pmClosed
GE (I) (CGN) KOLKATA
GE (I) (CGN) KOLKATA 700023
MAINTENANCE OF OBSTACLES AT GTO GROUND AT SSB (KOL) DIAMOND HARBOUR UNDER GE (I) (CGN) KOLKATA
2026_MES_776479_1
8701/16/2026-2027/E8
Open Tender
Civil Works
Item Rate
270 days
Kolkata
AS per tender documents
9 documents required · 9 mandatory
₹500
GE (I) (CGN)
₹80,000
Yes
12 Sept 2026
16 Jul 2026
7 Aug 2026
16 Jul 2026
6 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, complete all as specified and as directed by Engr in chg. | 80 | Each | - | - |
| 2 | M&L for cement concrete 1:3:6 (Type C2) in foundations, filling and mass concrete complete all as specified and as directed by Engr in chg. | 50 | Cum | - | - |
| 3 | Dismantling of stone slabs and tiling of any description or thickness in floor, aprons etc., laided bedded and pointed in any mortar complete all as specified and as directed. | 30 | Per 10 Sqm | - | - |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete all as specified and as directed by Engr in chg. | 12 | Cum | - | - |
| 5 | M&L for 100mm thick cement concrete type D-2 1:4:8 (using 40 mm graded stone aggregate) in flooring/ hard standing finished even and fair surface complete all as specified and as directed. | 300 | Sqm | - | - |
| 6 | M&L for Screed bed or bedding layer of mortar 20mm thick in cement mortar (1:6) for laying floor finishes complete all as specified and as directed by Engr in chg. | 300 | Sqm | - | - |
| 7 | M&L for Chequered cement concrete tiles 30cm x 30cm x 25mm thick, set, jointed with grey cement and no pigment and pointed in neat cement slurry in floors incl taking down old one complete all as specified and as directed. | 300 | Sqm | - | - |
| 8 | Demolition of unreinforced concrete in ground floors and paving not exceeding 15 cm thickness (above or below ground level)complete all as specified and as directed. | 20 | Cum | - | - |
| 9 | Demolition of reinforced concrete in ground floors and paving not exceeding 15 cm thickness above and below ground level) complete all as specified and as directed. | 5 | Cum | - | - |
| 10 | Excavation in trenches n. exc. 1.5 m wide and n. exc. 1.5m deep and getting out soft/loose soil complete all as specified and as directed. | 50 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_869525.xls
BOQ • 7.47 MB
tender01.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .