| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAdmitted-Finance | ₹3.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹15,268 (0.05%)Admitted-Finance | ₹3.2 Cr+₹15,268 (0.05%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹33.8 L (10.5%)Admitted-Finance | ₹3.6 Cr+₹33.8 L (10.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 Cr+₹67.6 L (21.1%)Admitted-Finance | ₹3.9 Cr+₹67.6 L (21.1%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical NON FURNISH OF DOCUMENT |
| Sl No | Description | Qty | Unit | Akash Dalai L1 | Surya Narayan Patnaik L3 | SURYA NARAYAN SAHU L2 | KESHAB PRADHAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, S tand post,Compound wall, 50KL RCC ESR with 12Mtr. Staging,. ,providing 100% functional house tape connections etc. With 5 years operation & maintenance for PWS to Baghalati under Kukudakhandi Block. | |||||||
| 1.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 41,43,836 ₹41,43,836 Lowest | 45,80,029 ₹45,80,029 | 41,43,836 ₹41,43,836 Lowest | 50,16,223 ₹50,16,223 |
| 1.02 | Construction of 50,000 LTR OHR WITH 12 M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 17,26,211 ₹17,26,211 Lowest | 19,07,918 ₹19,07,918 | 17,26,212 ₹17,26,212 | 20,89,625 ₹20,89,625 |
| 1.03 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned. | 1 | Nos | 2,93,502 ₹2,93,502 Lowest | 3,24,397 ₹3,24,397 | 2,93,502 ₹2,93,502 Lowest | 3,55,292 ₹3,55,292 |
| 2.00Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers ,stand posts,providing 100% functional house tape connections With 5 years operation & maintenance etc for PWS to Chandipadar under Kukudakhandi Block. | |||||||
| 2.01 | Supplying all materials labour T&P for .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,individual house hold connection etc. .as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A ). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 47,47,005 ₹47,47,005 Lowest | 52,46,690 ₹52,46,690 | 47,47,005 ₹47,47,005 Lowest | 57,46,375 ₹57,46,375 |
| 2.02 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned. | 1 | Nos | 2,37,350 ₹2,37,350 Lowest | 2,62,334 ₹2,62,334 | 2,37,350 ₹2,37,350 Lowest | 2,87,319 ₹2,87,319 |
| 3.00Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers ,stand posts,Compound wall,providing 100% functional house tape connections etc. With 5 years operation & maintenance etc for PWS to Hugulapata under Kukudakhandi Block. | |||||||
| 3.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 26,32,231 ₹26,32,231 Lowest | 29,09,309 ₹29,09,309 | 26,32,232 ₹26,32,232 | 31,86,386 ₹31,86,386 |
| 3.02 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned . | 1 | Nos | 1,31,611 ₹1,31,611 Lowest | 1,45,465 ₹1,45,465 | 1,31,612 ₹1,31,612 | 1,59,319 ₹1,59,319 |
Tender Value
₹3.4 Cr
Closing Date
17 Jan 2022, 5:00 pmClosed
Superintending Engineer, RWSS
Near Jarada Bunglow,Berhampur-760004
PWS to (1) Baghalati(2)Chandipadar(3) Hugualapata(4) Ankuspur (5)Marthapalli (6) Kusumi under Kukudakhandi Block.
2021_RWSS_75006_6
EERWSSBAM- 29 (A) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
360 days
PWS to (1) Baghalati(2)Chandipadar(3) Hugualapata
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
15 Mar 2022
28 Dec 2021
18 Jan 2022
28 Dec 2021
17 Jan 2022
28 Dec 2021
28 Dec 2021 - 12 Jan 2022
Amount
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, S tand post,Compound wall, 50KL RCC ESR with 12Mtr. Staging,. ,providing 100% functional house tape connections etc. With 5 years operation & maintenance for PWS to Baghalati under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR OHR WITH 12 M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers ,stand posts,providing 100% functional house tape connections With 5 years operation & maintenance etc for PWS to Chandipadar under Kukudakhandi Block.
Supplying all materials labour T&P for .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,individual house hold connection etc. .as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A ). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers ,stand posts,Compound wall,providing 100% functional house tape connections etc. With 5 years operation & maintenance etc for PWS to Hugulapata under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned .
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, stand post, Construction Compound wall,providing 100% functional house tape connections etc. With 5 years operation & maintenance for PWS to Ankushpur under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office l etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines,construction valve chabers, 50KL capacity ESR,providing 100% functional house tape connections etc. With 5 years operation & maintenance . in connection with to PWS to Marthapalli under Kukudakhandi Block.
Supplying all materials labour T&P for .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A ). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR OHR WITH 12 M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned.
Supplying Labour, Materials and T&P for Laying of pipelines, construction valve chabers, Compound wall, 50KL RCC OHR, 12Mtr. Staging,pumping unit installation ,providing 100% functional house tape connections etc. With 5 years operation & maintenance for PWS to Kusumi under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR OHR WITH 12 M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned .
Documentation Charges
SURYA NARAYAN SAHU
Surya Narayan Patnaik
KESHAB PRADHAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
BOQ_388892.xls
BOQ • 0.29 MB
6.pdf
Tender Documents • 2.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .