Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.2 Cr
EMD Value
₹1.4 L
Closing Date
30 Jan 2026, 6:10 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Mech.),Gandhinagar
Intermediate Docking Survey of the Tug GMB - I of Okha port.
260923
Tender Notice No. 23 of 2025-26.
Open
Marine Works
Works
Gandhinagar
17 documents required · 16 mandatory · 1 optional
₹4,248
Gujarat Maritime Board NON PLD, Gandhinagar
₹1.4 L
3 Jan 2026
3 Jan 2026
3 Jan 2026
30 Jan 2026
3 Jan 2026
NAME OF WORK:- "Intermediate Docking Survey of the Tug
GMB - I of Okha port".
Amount Put To Tender:- Rs.1,17,76,592.90
DTP containing pages from 1 to
Recommended to approval as per norms.
Deputy Executive Engineer (M).
GMB, Gandhinagar.
The Executive Engineer (Mech.), PIU,
1st floor, Gujarat Maritime Board
Office Complex, Near ST Stand Road,
PORBANDAR-360575,Gujarat (India)
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Tender Papers Contains Page No-01 to
Sr. No. Particulars. Page No
3. CHAPTER-1: BID NOTICE 3 to
4. CHAPTER-2: GENERAL INFORMATION 6 to
5. CHAPTER-3: INSTRUCTIONS TO THE BIDDERS 8 to
6. CHAPTER-4: PQ FORMS / ANNEXURES I to VIII 13 to
7. CHAPTER-5: TECHNICAL DETAILS OF THE VESSEL 22 to
8. CHAPTER-6: SCOPE OF WORK 23 to
9. CHAPTER-7: STANDARD BIDDING DOCUMENT 24 to
10. CHAPTER-8: SCHEDULE – B (BILL OF QUANTITY) 90 to
11. CHAPTER-9: ITEM TECHNICAL SPECIFICATION 100 to
12. CHAPTER-10: GENERAL SPECIFICATION 115 to
13. CHAPTER-11: GENERAL CONDITIONS
14. CHAPTER-12: DRY DOCK PLAN
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-1: BID NOTICE
Notice Inviting On-Line Tender
Details about Tender:-Tender Notice No. 23 of 2025-26.
Department Name :- Gujarat Maritime Board
Superintending Engineer (M),GMB,
Gandhinagar -382010
Executive Engineer (M), GMB
PIU – Porbandar
IFB No. :- Tender Notice No.23 of 2025-26.
Intermediate Docking Survey of the Tug GMB - I of
Name of Work :-
Estimated Contract Value (INR) :- Rs.1,17,76,592.90 (+GST)
Period of Completion (in Months) :- 02 (TWO) Months
Bidding Type :- Open
Joint venture :- Not applicable
Bid Call (Nos.) :-
Tender Currency Type :- Single
Tender Currency Settings :- Indian Rupee
Rs.4248/- with GST BY Demand Draft (Non
Bid Document Fee :-
Gujarat Maritime Board NON PLD, Gandhinagar
Bid Document Fee Payable in name of :-
Payable at Gandhinagar.
EMD (INR) :- Rs.138964/- with GST having SIX Months Validity
Executive Engineer (Mech.) GMB Gandhinagar,
EMD in favour of :-
payable at Gandhinagar.
Bid Document Downloading Start Date :- 03/01/2026 onwards
Pre Bid Date 06/01/2026 onwards 12:00 hours
Bid Document Downloading End Date :- 23/01/2026 onwards 18:10
Last Date & Time for Uploading
(Submission) of Bids
Bid Validity Period :- 120 days after opening of price bid
The Bidder must have to submit following
documents in the electronic format through
Scanning & Upload the same on n-procure website:
1. Tender Fee DD of Rs.4248/-
E-submission of Tender Documents: 2. EMD of Rs.138964/- in the form of FDR
The Original Copy of all Documents shall be 4. Copy of GST Registration
Scanned & uploaded on n-procure website 5. Bank Solvency Certificate of Rs.23.55/- Lacs or
only (https://tender.nprocure.com). above from any Nationalized/Schedule bank or
govt. approved bank for tendering purpose, issued
Bidder has to submit their offer in electronic on or after 1st January
format only after digitally signing the same 6. Annual turnover duly certified by C.A. of any one
& No offer in physical form will be accepted. of the last five years immediate preceding years,
i.e. from 2020-21 to 2024-25 minimum
Rs.117.77/- Lacs or above.
7. Documents showing the experience of
successfully carried out ***similar work during
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
last five years w.e.f 01.04.2020 till last date of
online bid submission. One similar works costing
not less than of Rs.47.11/- Lacs. Performance
certificates of above Experience, from concern
organization should be submitted along with
tender. *** Similar work means:- Experience of
successfully completion of Constructions of any
marine vessel or dry docking repairs of the any
Flotilla Vessel like tugs , dredgers, barges or any
other floating vessel having under IRS Class or
any other IACS Marine Classification society
during last 05 years up to last date of bid
8. Detailed plan to complete the tenderized work
with his man powers, tools tackles, and
equipment's with bar chart of voyage, anchorage,
and docking, undocking, berthing, unbreathing
back voyage to Okha port after repairs &
classification. Bidders shall have submit detailed
plan in form No.VII
9. P.Q. FORM-I: Letter of Application
10. P.Q. FORM -II: Document Fees & EMD Details
11. P.Q. FORM III: General Details
12. P.Q. FORM-IV: Turnover
13. P.Q. FORM–V : Details of experience
14. P.Q. FORM –VI: Under taking for NON
Banned/Blacklisting on 300 Rupees Non judicial
Stamp paper Duly Notarized
15. P.Q.FROM – VII: Detailed execution planning
with time frame.
16. P.Q.FROM VIII: Proposed Dry Dock Details.
The Bidder will have to submit the following required
documents (Original) in Physical form send the same
documents in a sealed envelope through RPAD/Speed
Post only up to 18:10 hours from date 24/01/2026 to
03/02/2026 during office hours at the Office of
Executive Engineer (Mech.), Gujarat Maritime Board,
Physical submission of Tender Documents: 5th floor, Sagar Bhavan, GMB Office Complex, Sector –
10 A, Opp. Air Force Station, CHH-Road, Gandhinagar-
Submission of physical documents (original) 382010 (Gujarat) India mentioning the name of work on
through /RPAD/Speed post in Office of the envelop and beyond the last date physically
Executive Engineer (Mech.), Gujarat submission of documents will not be accepted and bid
Maritime Board, 5th floor, Sagar Bhavan, will be treated as NON Responsive Bid.
GMB Office Complex, Sector – 10 A, Opp. 1. Tender Fees - Original DD of Rs.4248/-.
Air Force Station, CHH-Road, Gandhinagar- 2. EMD - Original FDR of Rs.138964/- having six
382010 (Gujarat) India. months validity.
3. Original PQ FORM– VI: Under taking for NON
Banned/Blacklisting on 300 Rupees Non judicial
Stamp paper Duly Notarized.
4. P.Q.FROM – VII: Detailed execution planning
with time frame.
5. P.Q.FROM VIII: Proposed Dry Dock Details.
Vendor shall submit their offer only in electronic format
Remarks :- on website, after digitally signing the same. Offers that
are not digitally signed will not be accepted.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Phone / Fax/email
Online Bid Opening Date :- 04/02/2026 at 12: 00 hrs (if possible )
Officer Inviting Bids :- Executive Engineer (M), GMB, Gandhinagar
Superintending Engineer (M), GMB,
Bid Opening Authority :-
Gandhinagar -382010
GUJARAT MARITIME BOARD,
Address :- 5th Floor, Sagar Bhavan, Sector 10,A, Opp. Air Force,"
Chh Road, Gandhinagar-382010, GUJARAT, INDIA
(1) Bidders can download the tender document free of cost from the website nprocure.com or
www.gmbPorts.org
(2) Bidders have to submit the bid in Electronic form on www.nprocure.com website till the Last Date
& time for submission.
(3) For vendors free training camp is being organized every Saturday between 4.00 to 5.00 P.M. at (n)
code solutions-A Division of GNFC Ltd., Ahmadabad. Vendors are requested to take benefit of the
(4) Government of Gujarat, & Governor MAY BE READ AS GUJARAT MARITIME BOARD, &
CHAIRMAN respectively.
Bidders who wish to participate in online tenders will have to procure / should have legally valid Digital
Certificate as per Information Technology Act-2000 using it they can sign their electronic bids. Bidders can
procure the same from any of license certifying Authority of India or can contact (n) code solutions-A
division GNFC Ltd, who are licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding Digital Signature Certificate related training involved
the below mentioned address should be contacted: (n) Code Solutions ,A division of GNFC,301, GNFC Info
Tower, Bodakdev, Ahmedabad – 380 054 (India)Tel: +91 26857316 / 17 / 18, Fax: +91 79
E-mail: [email protected], Web-site: www.gmb.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-2: GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 5th April 1982 under Gujarat Maritime Board Act, 1981, in order
to develop, administer, operate and regulate the state’s port sector. In 1998/99 GMB constructed the building of its
Head Office as a cornerstone for controlling and coordinating various ports activities. Gujarat Maritime Board
(GMB) on behalf of Chairman invites on line e - Tender offer for the work of "Intermediate Docking Survey of the
Tug GMB - I of Okha port." Work details are given in the scope of work category of this tender. The time limit
considered is 02 (TWO) months.
2.2 Site Information
The contractor has to carry out the said work at Kandla Port Steel Floating Dry dock or dry dock as
proposed by bidder. Contractor is strongly advised to visit the site and acquainted/familiar himself with the site
condition its surrounding etc in view of performing the scope of tender.
2.3 Definition:
In the contract documents, the following expression shall have the meanings herein assigned to them except
the contact otherwise requires.
The Expression “Board”: means Gujarat Maritime Board constituted under the Gujarat Maritime Board
The expression “Work” where used in this document shall, unless there be something in the subject or
contest repugnant to such construction, be constructed to mean the work or the work contracted and to be
executed under or in virtue of the contract, whether temporary or permanent and whether originally or
altered, substituted or additional. It shall include all extra or excess works and variations and be subject to
all commissions ordered in accordance with these conditions.
“Site” means the Dock/land, jetty and/or other places on, stacking area, under, in or through which works
are to be executed or carried out and services to be rendered any other lands or places provided by Gujarat
Maritime Board for the purpose of the contract together with such other places that may be specifically
designated in the contract as forming part of the site.
“Contract” means the notice inviting tenders, general conditions of contract, terms and conditions of
contract, specifications, price bid, tender and contract agreement made at the time of awarding the work
and also the mutual agreement made jointly during contract period.
“Bidder”/” Contractor” shall mean the person or persons, firm, company or corporation who’s tender has
been accepted by the GMB and includes Bidder’s/ Contractor’s personal representative, successors and
permitted assignees or joint Bidders who shall be deemed to be bound jointly and separately.
“Contract Period” means total time limit allowed for this work i.e.02 months from the date of issue of
work order by Executive Engineer (Mech.) Porbandar for Intermediate Docking Survey of the Tug GMB
- I of Okha port. “Requirement” means total quantity in the items mention in the Bill of Quantities which
may be increased or decreased as mentioned in the tender document which approved by the Competent
“Engineer-in-charge” (EIC) shall mean the Executive Engineer (M), GMB, Porbandar or his authorized
representative who shall exercise only such authority on behalf of the Executive Engineer as may have
been delegated to him from time to time by the Executive Engineer and powers delegated to him by the
Government/GMB Rules.
“Approved” means approval given in writing including verbal approval for which subsequent written
confirmation is given and “approval” means approval in writing including as aforesaid.
“Competent authority” Officer or officers of the Gujarat Maritime Board competent to exercise the
powers conferred upon him/them by the GMB/Government.
Drawings” means the drawings referred to in the specifications and attached with the agreement and any
modifications of such drawings approved in writing by the classification society / EIC or such other
drawings as may, from time to time be furnished or approved in writing by the EIC.
2.4 Abbreviations:
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
GMB / Board - Gujarat Maritime Board / Employer
EIC - Engineer-In-Charge or Engineer
AR - Authorized Representative.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN (Mech) - Executive Engineer (M).
DEE (Mech) - Dy. Executive Engineer (Mech)
GoI - Government of India
GoG - Government of Gujarat
AL - Acceptance of Letter
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-3: INSTRUCTIONS TO BIDDERS
On behalf of the Gujarat Maritime Board, the Executive Engineer (M), Gandhinagar, Gujarat
Maritime Board invites ON-LINE tenders from Experienced Contractors for "Intermediate
Docking Survey of the Tug GMB - I of Okha port".
3.1 BID SUBMISSION
a. The bid should be uploaded (submitted) through the official web site
www.tender.nprocure.com only up to 23 – 01 - 2026 up to 18:10 hours.
b. The physical documents shall be submitted through RPAD/Speed Post only up to
24/01/2026 to 03/02/2026 up to 18:10 hours. Beyond the last date physical submission
will not be accepted/ considered in any case and it will be returned back to the bidder. The
envelope must be super-scribed with name of work “Intermediate Docking Survey of the
Tug GMB - I of Okha port.” GMB is not responsible for the tender process if on the cover
name of tender work is not mentioned.
The Board does not assume any responsibility for the supporting tender documents being
torn/ damaged during the postal transit. It is the responsibility of the Bidder to see that the
supporting tender documents reach this office before due date as fixed and notified in the
tender notice for the purpose of receipt of the tender.
3.2 EARNEST MONEY DEPOSIT:
a) The Bidder shall remit Rs.138964/- only in form of FDR having validity of 6 months with the
tender, failing which the tender will not be considered.
b) The earnest money shall be remitted by a FDR of scheduled/ nationalized bank, in favour of
the Executive Engineer (M) GMB Gandhinagar. Cheque/DD will not be accepted towards the
Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after the
finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on receipt of
Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered default and in
such case, necessary action against bidder will be taken by GMB such as 1. Forfeiting of EMD
2.Black listing the agency for three years etc.
3.3 SECURITY DEPOSIT AND PERFORMANCE SECURITY:
a) The successful bidder shall furnish a Security Deposit (SD) equivalent to 10% of the total
contract value including GST within 15 days from the date of issue of the Acceptance Letter
(AL), comprising 5% of the contract value in the form of an FDR and 5% of the contract value
in the form of an FDR or Bank Guarantee as Performance Security; both instruments shall be
valid for a period of 15 (fifteen) months and shall be drawn in favour of The Executive
Engineer (M), Gujarat Maritime Board, Porbandar.
b) If the security deposit is not furnished within 15 days on issuing acceptance letter or such
extended period as may be permitted by the Executive Engineer (M) in writing, the earnest
money is liable to be forfeited and the contract cancelled.
c) In the event of the Bidder, after the issue of the communication of acceptance of the offer by
the GMB, failing/refusing to execute the agreement as hereinafter provided, the Bidders shall
be deemed to have abandoned the contract and such an act shall amount to be construed as
the bidder's calculated and willful breach of contract, the cost and consequence of which shall
be to the sole account of the Bidder and upon such an event, the Board shall have full right to
claim damages in addition to the forfeiture of Earnest Money Deposit.
d) The GMB may at their option forfit the Security Deposit if the bidder fails to affect the supply or
perform or observe the conditions of contract. The Board will also be at liberty to deduct any
sum that may be due to the GMB from the Performance Security or from any sums of money
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
due or that may become due under any other contract to the bidder. This is without prejudice
to the rights of the Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the bidder's
responsibility or liability pertaining to his obligations and/or guarantees under the contract
and shall be without prejudice and in addition to any other remedies available to the Board in
terms of the contract and/or the laws of the land.
f) The Security Deposit shall be released after on completion of Performance Guarantee period
from the date of work completion.
3.4 TIME SCHEDULE:
The time allowed for the completion of the work “Intermediate Docking Survey of the Tug
GMB - I of Okha port.” Is considered as under: Total Time limit -02 (TWO) months from the
date of commencement of work issued by GMB.
3.5 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
The Board does not bind itself to accept the lowest tender and reserves the right to reject any
or all tenders received without assigning any reason, whatsoever.
Tenders in which any of the particulars and prescribed information is inadequate or
incomplete in any respect and/or the prescribed conditions are not fulfilled are liable to be
The Gujarat Maritime Board reserves the right to accept or reject any tender or drop the
entire tendering process without assigning any reasons thereof.
3.6 MINIMUM PRE-QUALIFICATION CRITERIA AND EVALUATION PROCEDURE (PRE CUM
TECHNICAL BID):
Minimum criteria for qualification will depend on following criteria which include general,
financial, experience and technical for under rendering similar services. To assess the
qualification of the bidder, bidder shall submit information with all supporting documents as
mentioned in NIT for the following:
(a) General Criteria:-
Submission documents as per NIT.
(b) Financial Criteria:-
Bank Solvency Certificate of Rs.23.55/- Lakhs or above from any
Nationalized/Schedule bank or govt. approved bank for tendering purpose, issued
on or after 1stJanuary 2025.
Annual Turnover: Annual turnover of any one of the last five years immediate
preceding years, i.e. from 2020-21 to 2024-25 will be considered for evaluation. It
should be minimum Rs.117.77/- Lakhs or above and certified by C.A.
(c) Experience Criteria:-
Bidder should have experience of successfully carried out ***similar work during
last five years w.e.f 01.04.2020 till last date of online bid submission.
One similar works costing not less than of Rs.47.11/- Lakhs.
Performance certificates of above Experience, from concern organization should
be submitted along with tender.
***Similar work means having the experience of successfully completion of
Constructions of any marine vessel or dry docking repairs of the any Flotilla
Vessel like tugs , dredgers, barges or any other floating vessel having under IRS
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Class or any other IACS Marine Classification society during last 05 years.
(d) Technical Criteria:-
Bidders shall have to qualified on the basis of satisfactory submission of details given here
above as well as well bidders shall have to submit detailed plan to complete the tenderized
work with his man powers, tools tackles , equipment's with bar chart of voyage, anchorage,
docking, undocking , berthing, unbreathing back voyage to Porbandar port after repairs &
classification . Bidders shall have submit detailed plan in P.Q.FROM-VII and Proposed Dry Dock
details P.Q.FROM –VIII.
3.8 BID OPENING
1. The On-line tender PQ cum Technical Bid will be opened at 12.00 hrs. on 04/02/2026.
2. The Price bid will be opened on- Line of those Bidders who are pre cum technically qualified.
The date and time of opening of the Price Bid will be notified to the qualified Bidders in
advance of opening.
3. During the process of Bid evaluation GMB may call the bidders for discussion /clarification
and also can ask for requisite support documents.
4. Tenders submitted by Bidders shall remain valid for acceptance for a period of 120 days
from the date of opening of the price bid. The Bidder will not be allowed during the declared
period of validity to revoke or cancel his tender or to vary any term thereof.
5. If any Bidder withdraws his tender before the date of validity as declared, the earnest money
deposited by the Bidder, shall be outright forfeited. There shall be considered as breach of
contract and action against bidder shall be taken according to norms.
6. The work will be awarded to the lowest techno-commercial offer after approval obtained
from the competent authority.
7. Only the authorized representatives of the bidders will be allowed to be present during bid
3.9 ADDENDA/CORRIGENDA:
The Executive Engineer (Mech), Gandhinagar shall have the right to revise or to amend the
contract documents prior to the date of receipt and opening of the tender aforesaid such
revision or amendments or extensions, if any, shall be communicated through notice in the
newspaper, as may be considered necessary.
Addenda/Corrigenda to the tender documents may also be published On-Line by the
Executive Engineer (M), GMB, Gandhinagar prior to the date of opening of the tenders, to
clarify or reflect modifications in the contract terms and conditions.
3.10 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
1. The Bidder shall visit the site and acquaint himself fully with the site and local conditions and
no claims whatsoever will be entertained on the plea of ignorance of difficulties for
installation and operation of the system. Before submitting the tender, the Bidder shall be
deemed to have clearly understood and satisfied himself regarding the work and services, all
conditions liable to be encountered during the execution thereof and that prices, rates
and/or compensation quoted in the offer are adequate and all inclusive with respect to all
factors, circumstances and conditions likely to be incidental, both direct and indirect, to the
work and services.
2. The prices and amount quoted by the Bidder shall include all costs, including escalation of
labor, material, equipment, transport and/or storage charges, insurance, inspection fees,
increase in cost due to government and other charges, direct and indirect, till the work is
completed in accordance with the scope of the contract and contract period. GST will be paid
extra as actual on submission of documentary evidence for payment made to GST
3.11 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should immediately
be referred to the Executive Engineer (M), Gujarat Maritime Board, Porbandar or
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Gandhinagar in writing, whose interpretation shall be final and binding.
3.12 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an agreement on stamp paper of the
required value within 15 days from the date of issue of the notice of Letter of Intent with
submission of security deposit as per clause no 3.3. In the event of failure on the part of the
successful Bidder to execute the agreement within the above stipulated period, or the period
agreed by the Board, the Earnest Money deposited by him will be forfeited and apart from
that the Board being in such circumstances entitled to treat the successful Bidder as in
breach of contract and proceed accordingly. The agreement shall be done by Executive
Engineer (M), GMB, PIU - Porbandar
3.13 JURISDICTION:
The contract is subject to the jurisdiction of the local courts of Porbandar (Gujarat).
3.14 All the documents contained in the tender shall form a part of agreement including
instructions, conditions, special conditions, Technical specifications document etc. and any
correspondence related to this Contract.
2.15 Letter of Application shall be submitted in proper format. Incomplete offers shall be rejected.
2.16 The bidder shall satisfy himself with regard to the nature of work to be carried out, its scope,
the conditions of the contract, etc included in the bid document.
2.17 The cost associated with the preparation and submission of bid shall be borne by the bidder and
GMB shall in no case be responsible or liable for such costs.
2.18 The language for submission of bid should be in English.
The enclosed schedules should be filled in completely and all questions should be answered.
If any particular query is not relevant, it should be stated as "NOT APPLICABLE ".
Financial Data, Projects Costs, value of work etc. should be given in Indian rupees only.
3.19 For any clarification the Executive Engineer (Mech.) Gujarat Maritime Board, Office Complex,
Porbandar-361750 or Office of Executive Engineer (Mech.), Gujarat Maritime Board, 5th floor, Sagar
Bhavan, GMB Office Complex, Sector – 10 A, Opp. Air Force Station, CHH-Road, Gandhinagar-
(Gujarat) India , may be contacted by prior appointment on working day. For site visit and
information regarding relevant data will be also available at the above address.
3.20 If a proprietary firm makes the application, it shall be signed by the proprietor above his full name
and the full name of his firm with its current address.
3.21 If the application is made by a firm in partnership, it shall be signed by all the partners of the firm,
above their full names and current addresses or by a partner holding the power of attorney
of the firm by signing of the application in which case a certified copy of the power of
attorney shall accompany the application A certified copy of the partnership dead, current
address of the firm and the full names, and current of all the partners of the firm shall also
accompany the application.
3.22 If limited company or a limited corporation makes the application, a duly authorized person
holding the power of attorney for signing the application in which case a certified copy of the
power of attorney shall accompany the application shall sign it. Such limited company or
Corporation will be required to furnish satisfactory evidence of its existence before the
contract is awarded.
3.23 Information furnished must be sufficient to show that the Bidder is a capable in all respects to
successfully complete the envisaged contract works strictly on the basis of the Bidder, having
already carried out satisfactorily works of similar size, nature and complexity.
3.24 While submitting the schedules, duly filled in, the Bidder shall enclose the latest copies of brochures
and technical documentation giving more information about the firm and all the members.
3.25 The Gujarat Maritime Board reserves the right to reject any or all bids without assigning any
reasons and the Gujarat Maritime Board decision shall be final and binding.
3.26 Detail of company profile shall be furnished in Annexure-(General information) of the document.
3.27 No costs incurred by bidder in making this offer like providing clarification or attending discussions,
conferences or site visits will be reimbursed by the Gujarat Maritime Board.
3.28 Details of the litigation, if any, during last three years shall be furnished as per performa attached.
3.29 The tenders shall remain open for a period of 120 days from the date of opening of the price bid and
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
that the Bidder is not allowed to withdraw or modify the offer of his own during this period.
If any, Bidder withdraws his tender before the said period or makes modifications of his
tender, which are not acceptable to the Board the Board shall, without prejudice to any right
or remedy, be at liberty to forfeit in full the EMD absolutely.
3.30 The PQ cum Technical Bid should contain all other documents (except the price bid) viz;
specifications, general conditions etc. and Bidder’s letter regarding deviations to the general
terms & conditions, if any. It should be very clearly understood that the PQ cum Technical
Bid should be restricted to only "Technical matters and the tender amount of other price
should not be discussed in the PQ cum Technical Bid. Conditions in "PQ cum Technical Bid"
should be specific so as to evaluate them correctly and to arrive at the correct financial effect.
3.31 The rates should be filled only in Price bid of tender documents nowhere else rates are to be
mentioned. The price bid should contain only rate and amount of the work. Any condition in
the price bid shall be liable for rejection of offer of that bidder.
3.32 The bidders will understand clearly that the rates quoted are for complete works and include all
costs due to labor, plants & equipment, transportation, supervision of GMB officials including
lodging & boarding, various other services like water, power, taxes, duties, materials and all
matters and things necessary for satisfactory completion of the work and no claim for
additional payment beyond the offered/accepted rates will be entertained and the bidder
will not be entitle subsequently to make any claim on the ground of misrepresentations or on
the ground that he was supplied with wrong information given by any person ( whether the
person is the employee of GMB or not ). Any failure on the part of Bidder to obtain all
necessary and correct information for the purposes of filling his Bid and prices / rates
therein shall not relieve him from any risks or liabilities arising out of consequence upon the
submission of the Bid.
3.33 Should there be any discrepancy or any doubt or obscurity as to the meaning of any of these Bid
documents or as to anything to be done or not to be done or as to those instructions to be
observed by the bidder, they may point out in writing such queries to the Executive Engineer
(M), GMB, Porbandar or Gandhinagar by letter / fax, as soon as possible but not later than
days before pre-bid conference. In such case the decision given by the competent authority
shall be final and binding to the bidder(s).
3.34 GMB may issue any corrigendum in regards to any deviation in clause or the outcome of pre bid
conference by uploading the documents on tender web-sites.
3.35 No contract will be awarded except to the qualified and responsible bidders capable of performing
the classes of work contemplate.
3.36 No Bid shall be deemed fit for consideration unless, it is completed in all respect.
3.37 Liquidated damages for delay: (i) If the Contractor fails to complete the work under contract by the
stipulated date, he shall pay liquidated damages of Rs. 0.1 percentage of the contract value
per day from the date of delaying the said work upto the date of completion and handling
over to the Government. and shall be subject to the maximum amount of ten percentage of
the estimated amount put to tender.
3.38 PRE-BID MEETING:
Pre-Bid meeting shall be held on 06/01/2026 from12:00hrs onwards in GMB Complex,
Gandhinagar. Bidders who have any queries should raise it through e-mail, fax, post, and
courier latest by 2 days before the date of Pre-Bid meeting. The queries should be addressed
to The Superintending Engineer (Mech.), PPU Unit, GMB, Gandhinagar in writing on email ID:
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-4: PQ FORMS / ANNEXURES
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM-IV : Turnover
P.Q. FORM–V : Details of experience
P.Q. FORM -VI : History of Litigation on Rs.300 non judicial stamp paper duly notarized
P.Q.FROM – VII : Detailed execution planning with time frame.
P.Q.FROM VIII : Proposed Dry Dock Details.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ Form No.I: LETTER OF APPLICATION
Executive Engineer (M)
Gujarat Maritime Board,
Having examined the Bid documents including scope of works and time frame of the aforesaid work, I/we hereby
submit all necessary information and relevant documents as desired.
The application is made by us on behalf of................................ ………………………….duly authorized to submit
The necessary evidence admissible in law in respects of authority assigned to us on behalf of the firms for applying
and for completion of the contract document is attached herewith.
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government organization OR Major Port Trust
OR Minor Port Board in India for any such works in last Five Years.
I/We shall make available to the GMB any additional information it may find necessary or require for this tender
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to time for execution of any
contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any addendum issued by GMB.
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this work without assigning
Place: Signature of the applicant
(Name in bracket)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ Form No.II: Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ Form No. III: General Information
All individual firms applying for pre-qualification must complete the information in these forms.
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / registration: Year of incorporation / registration:
9. Main lines of business:
10. Details of office set up with Key staff name,
designation, & other detail
11. Other information ( if any)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ Form No. IV: Turn over
All individual firms applying for pre-qualification must complete the information in these forms.
Particular Year Value
Note: Copy of Chartered Accountant certificate shall be attached online with the Tender.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ FORM –V: Experience of similar works
Bidders should provide information showing their experience for similar works as mentioned in the table
Actual experience during last 05 years till due date of bid for the proposed work as per relevant clause of PQ bid
shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner/ Address Contact Value of Detail Order Successfully
No of Client with person name contract (copy Attached) Completion
work phone / & Mobile no. Certificate of
Fax No. Client (Attached/
Note: The above information should be filled in the table and supporting documents in soft copies should be
submitted inclusive of work order and performance certificate etc. in e-tender.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ FORM – VI: History of Litigation
History of Litigation
(On 300 Rupees Non judicial Stamp paper with duly notarized)
We here by undertakes and confirms that our agency M/s
________________________________________________________ have been neither black listed nor banned
for tender participation or execution of the works by any Govt./PSU Authority in last three year.
Yours faithfully,
(Name of Authorized signatory)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ Form-VII: Work Planning
Bidders shall have to describe following points in detailed with time frame.
1. Port Permission & docking planning.
2. Repairing scheduled into the docking repairs with time frame with man powers, equipment etc.
3. Classification & survey.
4. Undocking & berthing
5. Return voyage to Okha Port.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PQ FORM - VIII: Proposed Dry dock Details
(For bidders proposing drydock other than KPT steel floating dock)
Sr. Particulars Min. Required Proposed by the
2 Draft at Dry Dock above Sea level 6M
3 Draft at approach channel 6M
4 Dry Dock width of gate 16 M
5 Available length of Dock 45 M
6 Distance from Okha to Proposed
dry dock (in NM)
1. Bidder shall have responsibility of docking, undocking, repairing, surveying of the vessel in relevant Class.
2. Bidder has to submit charter agreement of dry dock with necessary details of dock if the dry dock is not
3. In any case if contractor’s dock is not available as mentioned by bidder in Annexure or due to any other
reason, then contractor has to immediately take the tug at KPT for repairs and the cost towards it shall be on
contractors account.
4. For any dry dock proposed by the bidder, it shall be GMB’s responsibility for voyage of tug from respective
port to anchor point of the proposed dry dock and beyond which it shall be the bidder’s sole responsibility
for further carrying out the voyage of tug to their dry dock and safely docking the tug and after repairing,
voyage of tug from drydock to the anchor point. The bidder has to ensure smooth navigation of tugs up to
their proposed dry dock by all means including carrying out analysis and assuring of sufficient water level
availability in the channel according to the draft of the tug so that in no case, grounding of the tug or any
damage/accident is anticipated. The rate offer by the bidder shall include all the expense occurred for Extra
Tug required for assist GMB Tug, Navigational Channel marking, boat required for making channel, local
pilot arrangement etc. in all respect. All kind of arrangement shall have to be done by contractor and no
extra payments shall be done for safe voyage of tug from anchor point to agency dock up to safe docking &
undocking after repairs all kind of arrangement as stated above shall have to made by the contractors.
Bidders /contractor shall have to make perfect/accurate planning to avoid any incident such as grounded,
salvage, or any kind of damage to GMB Tug. If any such things occurred then bidder shall held responsible
for the same and bidders shall have to make all kind of repairs, salvage, or all kind of arrangement to put the
vessel in working as per Original. No extra payments for the same shall be made and shall be bidding to the
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-5: Technical Detail TUG M T GMB-I of Okha Port
1. Name of Vessel: GMB-I
2. Registration & Official No M-7512 & IR No.18253
4. Type of Vessel: Motor Tug
5. Year of Built: Sept
6. Place of Built: Ratnagiri
7. Name of Builder: M/s. Bharti Shipyard Ltd., Mumbai
8. Trading Warranting: Inland Vessel limits/Harbour operation
9. Construction details:
Length: 32.00 mtrs
Breadth: 10.70 mtrs
Depth: 3.70 mtrs
Draft: 4.50 mtrs + 0.5 mtr clearance
Speed: 10.00 Knots
10. Particulars of Engines &
Make & Model Bergen / KRMM6
Fuel used: HSD
BHP 2 X 1250 KW (2 X 1700 BHP)
2 Port Registry: Mumbai
3 Details of last major Dry dock repairs
4 When last surveyed:
5 No. of screws: 02 Nos. Voith Schneider Propulsion
6 Particulars of fire-fighting Pumps and fire extinguishers on board
7 Does the vessel undertake No
towage? If yes, give details:
8 Class IRS IV class
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-6: Scope of work:-
A tenderized work is being requires to going in execution for intermediate docking survey hull
side repairs to Tug M T GMB-I of Okha port which having technical details as given here above
in chapter No.5.
The items of work here given in the bid shall have to requires to be executed as per standard
marine practice & norms of the relevant classification society norms like IRS, DGS, MMD etc.
Items of work includes renewal of steel hull, pumps service & repairs, pipe line renewals &
repairs, anodes renewals, sand blasting, painting of hull, superstructures, fenders work, electrical
parts repairs etc. work including all of items given in the here items of works in schedule B.
All the items of work must have to execute as per detailed specification given in this bid in works
The tenderized work includes the docking of the tug at steel floating dock kandla or proposed
dock including docking , undocking, voyage, berthing , anchorage, etc. as per detailed items of
specification given in the here tender items of work.
In short the main aim of the scope of work is docking, survey, un-docking, and placed at
anchorage including all permission, including all repairs, including class of the vessel.
Detailed items of work specification are given here tender & work shall have to execute as per
items specification. The relevant clauses of SBD form shall be applicable as per government
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-7: STANDARD BIDDING DOCUMENT
NAME OF WORK: Intermediate Docking Survey of the Tug
GMB - I of Okha port.
Amount Put To Tender:- Rs.1,17,76,592.90/-
Office of Executive Engineer (Mech.),
Gujarat Maritime Board, 5th floor, Sagar Bhavan,
GMB Office Complex, Sector – 10 A, Opp. Air Force
Station, CHH-Road, Gandhinagar- 382010 (Gujarat)
GOVERNMENT OF GUJARAT,
GUJARAT MARITIME BOARD,
PORT & TRANSPORT DEPARTMENT
This is a generic SBD to be used for Civil works. Each user/concern department
needs to examine and put up their particular bidding requirement like;
qualification criteria, contract Data etc., marked at [#] while finalizing their
own bidding process.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
INVITATION FOR BID
(IFB) AS PER NIT.
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer (Mech.), GMB, Gandhinagar invites bids for the construction of works detailed
in the table. The bidders may submit bids for any or all of the following works.
Sr. Name of work Estimated Bid Document EMD In RS Period of
No. Tender Fee. (FDR) completion
value of (in DD )
2. Prospective/Interested bidder may download the Bid Documents from website
www.gmbtender.nprocure.com free of cost till the Time and Date as mentioned on online NIT
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document Fee/ Tender Fee
through Demand Draft only of any Schedule Bank payable at Porbandar and in favor of "Gujarat Maritime
Board NON PLD, Gandhinagar A/c" Once the Bid is received online/Offline, BidDocument / Tender Fee will
not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against Bid Security /
EMD shall be submitted in electronic format through online (by scanning)while uploading the bid, this
submission shall mean that bid document / tender fee and Bid Security/ EMD has been received.
Accordingly, the offer of only those shall be opened whose Bid Document / Tender Fee and Bid Security
/ EMD have been received electronically. However, for the purpose of realization of Demand Draft, and
FDR / Bank Guarantee bidder shall send the same in original through R.P.A.D. so as to reach to
‘Executive Engineer (Mech.), GMB, Gandhinagar' within 7 Days from the last day of bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in original to
Executive Engineer / Tender Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the online NIT at
website https:// www.tender.nprocure.com in the presence of the bidders or their authorized
representatives, who wish to remainpresent.
If the office happens to be closed on the day of opening of the bids as specified, the bids will be
opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on………………………………at………………………..hrs.atthe
Office of Superintending Engineer(Mech.) 5th Floor GMB office complex Opp of Air Force Sector 10 A
Gandhinagar to clarify the issues and to answer questions on any matter that may be raised at that
stage as stated inclause 9.2 of ‘instructions to Bidders’ of the bidding documents.
6. #Bid Security (EMD) is equal to 1%(+18% GSt) of Estimated Amount put to bid / tender and
should be rounded off to the next thousand rupees.
7. Other Information is as under:
a. Agencies can prepare and edit their offers a number of times before the end of the tender
submission date and time. After the tender submission date and time, the bidder cannot modify /
edit / withdraw their submitted offer in any case. No written or online request in this regard shall be
b. Offers in physical form will not be accepted in any case.
c. Demand Draft purchased by the other then bidder and issued after the last date of submission of
Bids, will not be considered or accepted.
d. The cost incurred by the contractor for this offer for clarification or attending discussion,
conferences or site visits will not be reimbursed by the Employer or Engineer-in-Charge.
e. Conditional tender shall not be accepted.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
f. Any changes, addition, alternation made in the prescribed form attached with tender are liable to be
g. Any change in format or conditional Bank Guarantee will not be accepted and the bidder will be
considered non-responsive.
h. All the bidders are instructed to fill in information strictly in accordance with the format given in
the checklist /qualification document / tender document.
i. It is mandatory for the bidders to supply each and every information as asked strictly in electronic
format at appropriate places only.
j. Blank/insufficient information shall be treated as nil information and shall result in disqualification.
k. Even if the bidder has been qualified in a similar or larger size of project in the past,it shall not be
deemed to be aground/reason for not giving required information for this work /bid.
l. Information supplied for earlier projects shall not be considered while evaluation of this bid. The
Government will not ask for any other information, unless it is found absolutely necessary by the
competent authority.
m. If found necessary, the contractor will be intimated for negotiation,
#For the works costing up to 7.5crore (ROAD) ,7.0crore(BUILDING&BRIDGE) kindly
refer to SSR-10-201517-C dated03-02-2017
For the works costing under 7.5 crore for Road Works and 7.0 crore for Building and Bridge Works
following documents shall be submitted in electronic format only through online by scanning and
the (i) Bid Document Fee / Tender Fee (ii) Bid Security / EMD should be sent in original to the
Tender opening authority through RPAD, so as to reach the Executive Engineer within 7 days from
last day of submission of Bid.
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
ELIGIBILITY CRITERIA
EILIGIBILITY CRITERIA AS PER NIT & TQ /PQ relevant tender clause given
here above clause & criteria.
All the eligibility criteria shall be requires to submit as mention in tender documents.
i. Upload Scan copy of Tender Fee of Rs.AS PER NIT /- in the form of Demand Draft
only (Cash not acceptable) in favour of "Gujarat Maritime Board NON PLD,
Gandhinagar" payable at Gandhinagar from any Nationalized / Scheduled Bank. (DD
for Tender Fee must be purchased from the account of Bidder)
ii. Upload scan copy of Earnest Money Deposit Rs.AS PER NIT /- in the form of FDR
(with a validity period of not less than 6 months) from Nationalized/ Scheduled Bank in
favor of Executive Engineer(Mech.), GMB, Gandhinagar, payable at Gandhinagar
(FDR for EMD must be purchased from the account of Bidder).
iii. Upload Scan copy of GST Registration Certificate
iv. Upload Scan copy of Permanent Account Number issued by Income Tax Department
v. Upload Scan copy of Bank Solvency of Rs AS PER MENTION PQ/TQ issued on
or after 01.01.2025 by Scheduled/Nationalized Bank or Government approved bank for
tendering purpose.
vi. Turn over of minimum Rs AS PER MENTION PQ/TQ in any one year, over the last
five financial years i.e. (2020-2021 to 2024-2025) issued by Charter account.
vii. AFFIDAVIT for abandoned any work of Government
viii. Upload the scan copy of 3A certificate issued for completions of Government work or if
agency submit experience of private work then copy of work order, completions certificate
mentioning amount of work done, date of start and actual date of completions of work.
Bidder should have experience successfully carried out *similar work during last
five years w.e.f 01.04.2020 till last date of online bid submission.
At least one similar work costing not less than Rs AS PER MENTION PQ/TQ
*Similar work means:- Experience of successfully completion of Constructions of
any marine vessel or dry docking repairs of the any Flotilla Vessel like Tugs
dredgers, barges or any other floating vessel having under IRS Class or any other
IACS Marine Classification society.
ix. Submission of Dry Dock details as per relevant annexure
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Section1: Instructions to Bidders
Table of Clauses
D. Submission of Bids
1. Scope of Bid 19. Sealing &Marking of Bids
2. Source of Funds 20. Deadline for Submission of
3. Eligible Bidders 21. Late Bids
4. Qualification of the 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding E. Bid Opening and Evaluation
7. Site Visit 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding Documents 26. Examination of Bid sand
Determination of
9. Clarification of Bidding 27. Correction of Errors
10. Amendment of Bidding 28. Deleted
29. Evaluation and Comparison
Of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising F. Award of Contract
13. Bid Prices 31. Award Criteria
14. Currencies of Bid and Payment 32. Employer’s Right to Accept
Any Bid and to Reject any or
15. Bid Validity 33. Notification of Award and
Signing of Agreement
16. Bid Security 34. Performance Security
17. Alternative Proposals By 35. Advance Payment and Security
18. Format and Signing of Bid 36. Deleted
37. Corrector Fraudulent Practices
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as
defined in these documents and referred to as ‘the works”) detailed in the table given in
IFB. The bidders may submit bids for any or all of the works detailed in the table given in
1.2 The successful bidder will be expected to complete the works by the intended completion
date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/tenderer, bid/tender, bidding/tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat Gujarat
Maritime Board/ Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project Manager
for the Contract. A firm that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall not
be eligible to bid.
4. Qualification of the Bidder:-
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description n of the proposed work method and schedule, including drawings
and charts, as necessary. The proposed methodology should include a program of
construction backed with equipment planning and deployment duly supported with broad
calculations and quality assurance procedures proposed to be adopted justifying their
capability of execution and completion of work as per technical specifications, with in
stipulated period of completion.
#4.5 QUALIFICATIONCRITERIA: (Please refer Chapeter-1: NIT and Chapter-3:
INSTRUCTIONS TO BIDDERS) (Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail
criteria regarding the Applicant’s general and particular experience, personnel and
equipment capabilities and financial positions, as demonstrated by the applicant’s
responses in the forms attached to the letter of application ( specified requirement for joint
ventures are given under para 4.6 below ) Subcontractors experience and resources shall
not be taken in to account in determining the applicants compliance with the qualifying
To qualify for more than one contract, the applicant must demonstrate having experience
and resources sufficient to meet the aggregate of the qualification criteria for each contract
given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below Chapter-3, Instructions to bidders, clause
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2024-2025
Applicant should indicate actual figures of costs and amount for the works executed by
them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency
the above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of the
bid) will be applied for the purpose of conversion of the amount in foreign currency into
4.5.3 General Experience. :-As per Bid PRE CUM TECHNICAL QUALIFICATION (CHPATER
CLAUSE 3.6 PAGE NO.09).
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum Annual financial turnover of Rs. in any one year, over the last
five years issued by Charter account
(b) Experience in successfully completing or substantially completing at least one
contract similar nature of work at least 40 percent of the value of proposed contract
within the last five years.
The works may have been executed by the applicant as prime contractor or asa
member of a joint venture or as a nominated sub-contractor. As subcontractor, he
should have acquired the experience of execution of all major items of works under
the proposed contract. In case a project has been executed by a joint venture, weight
towards experience of the project would be given to each joint venture in proportion
to their financial participation in the joint venture.
Substantially completed works means those works which are at least 90 % completed
as on the date of submission (i.e. gross value of work done up to the last date of
submission is 90 % or more of the original contract price) and continuing
satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing
amount, date of commencement of works, satisfactory performance of the contractor
and any other relevant information.
4.5.4 Personnel Capabilities. Availability for his work of personnel with adequate experience as
required; as per Appendix.
4.5.5 Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment
to attain the completion of works in accordance with the prescribed construction schedule
are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their bid, a
detailed construction planning and methodology supported with layout and necessary
drawings and calculations to allow the employer to review their proposals. The numbers,
types and capacities of each plant/equipment shall be shown in the proposals along with the
cycle time for each operation for the given production capacity to match the requirements.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
4.5.6 Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and / or
credit facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7 The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If necessary,
the employer will make inquiries with the applicant’s bankers.
4.5.8 Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five years. A consistent
history of awards against the Applicant or any partner of a joint venture may result in
failure of the applicant.
4.5.8 Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if they
have: Made misleading or false representation in the forms ,statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for which
the reasons are attributable to the non – performance of the contractor; consistent history of
litigation awarded against the applicant or financial failure due to bankruptcy. The rescinding
of contract of a joint venture on account of reasons other than non – performance, such as
Most Experienced partner of joint venture pulling out, court directions leading to breaking up
of a joint venture before the start of work, which are not attributable to the poor performance
of the contractor will, however, not affect the qualification of the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others) (Applicable only for
estimated project cost of 50 Crore and above)
4..6.1 Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given Inpara & 4.5.6
above. The joint venture must collectively satisfy the criteria of para4.5.3 &
4.5.6above.The experience of the other joint venture partners shall be considered if it is
not less than 30 percent of the qualifying criteria in para4.5.3&4.5.6 above.
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be
submitted with a copy of the joint venture agreement providing the joint and several
liabilities with respect to the contract.
4.6.2 Qualification of a joint venture does not necessarily qualify any of its partners
individually or as a partner in any other joint venture. In case dissolution of a joint
venture, each one of the constituent firms may qualify if they meet all the qualification
requirements, subject to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will bequalified only if their
available bid capacity at the expected time of bidding is more than the total estimated cost
of the works. The available bid capacity will be calculated asunder:
Assessed Available Bid Capacity=(A*N*2-B),where
A = Maximum value of work executed in any one year during the last five years(updated to
the price level of the year indicated in appendix) taking in to account the completed
as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works to be
completed during the next 2 (Two)Months(period of completion of work for which
bids are invited );and
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
N = Number of years prescribed for completion of the works for which the bids areinvited.
Note :- In Case of joint venture, the available bid capacity will be applied foreach
partner to the extent of his proposed participation in theexecution of the
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachmentsthesubmittedinproofthequalificationrequirements;and/or
- Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delay in completion, litigation history, or financial failures etc.;
- Participated in the previous bidding for the same work and had quoted unreasonably
high bid prices and could not furnish rational justification to the employer.
5. One bid per bidder
5.1 Each bidder shall submit only one bid for one package. A bidder who submits or participates
in more than one bid (other than as a subcontractor or in cases of alternatives that have been
permitted or requested) will causeall theproposals with the bidder’s participation to be
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his Bid, and
the Employer will in no case be responsible and liable for those costs.
7.1 The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the
Site of work and its surrounding and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B: BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda issued in
accordance with Clause10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information ,and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
10 Documents to be furnished by bidder V
8.2 Volumes I, II, III and IV are available online and documents to be furnished by the bidder
in compliance to section 2 will be prepared by him and furnished as Volume- V in two
parts (refer clause12).
8.3 The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, and technical specifications, bill of quantities, forms, Annexes and
drawings in the Bid Document. Failure to comply with the requirements of Bid Documents
shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids which are not
substantially responsive to the requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify the
Employer in writing or through E-mail at the Employer’s address indicated in the invitation
to bid. The Employer will respond to any request for clarification which he received earlier
than 15 days prior to the deadline for submission of bids. Employer’s response will be
published on website including a description of the enquiry but without identifying its
9.2 Pre-bid meeting
9.2.1 The bidder or his official representative is invited to attend a pre-bid meeting which will
take place at the address, venue, time and date as indicated in the appendix.
9.2.2 The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3 The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website
i.e. www.tender.nprocure.com. Any modification of the bidding documents listed in sub-
Clause 8.1 which may become necessary as a result of the pre-bid meeting shall be made
by the Employer exclusively through the issue of an Addendum pursuant to Clause
and not through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2 Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his discretion, extend as necessary the deadline
for submission of bids, in accordance with Sub-Clause 20.2 below.
C: PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1 The bid be submitted by the bidder as Volume-V of the bid document (refer Clause 8.1)
shall be in two separate parts:
Part-I shall be named “Technical Bid” and shall comprise (As per Chapeter-1: NIT and
Chapter-3: INSTRUCTIONS TO BIDDERS)
(i) Bid Security in the form specified in Section
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.3 The Bidder shall submit the details/information pertaining to each part i.e. technical as well as financial
and must be submitted online only.
Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume-I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume-I
9 Drawings Volume-IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and online item total (both in figures and words) for
all items of the Works described in the Bill of Quantities along with total bid price other in
figures and words). Items for which no rate or price is entered by the bidder will not be paid
for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the dead line date for bid
submission specified in Clause20.
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may
request that the bidders may extend the period of validity for a specified period. A bidder
may refuse the request without forfeiting his bid security. A bidder agreeing to the request
will not be required or permitted to modify his bid, but will be required to extend the
validity of his security for a period of the extension, and in compliance with Clause-16 in
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
#16. Bid Security: As per qualification criteria given tender (As per Chapeter-1: NIT and Chapter-3:
INSTRUCTIONS TO BIDDERS).
16.1 The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in column
of the table of IFB for this particular work. This Bid security shall be in favor of Employer as named
in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore
and above) and Bank Guarantee of Schedule and Private Banks shall be
considered as per GoG Finance Department’s Circular No. FD/MSM/e-
file/4/2024/0057/D.M.O. Date 21/04/2024 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road &
Building Department or (2) Narmada Water Resources, Water Supply and
KalpsarDepartment of Govt of Gujarat. Exemption Certificate is applicable only
when Registration Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.
16.2 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid
shall be valid for 45 days beyond the validity of the bid i.e. total validity of 120+45 =
16.3 Any bid not accompanied by an acceptable Bid Security and not secured as indicated in Sub-
Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4 The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the
bid validity period specified in Sub-Clause15.1
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed the
Agreement and furnished the required Performance Security.
16.6 The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and
his tender will be rejected. Punitive action will be taken on such contractors. (As per
GoG R&B Dept’s Gr. No. S/22/2017/6369/D,Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1 Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or time for
completion), basic technical design as indicated in the drawing and specifications.
Conditional offers or alternative offers will not be considered further in the process of tender
18. Format and Signing of Bid
The Bidder shall prepare documents comprising the bid as described in Clause-12 of these
Instructions to bidder as the “Technical Bid“ and “Financial Bid” in separate parts to be
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
D: SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1 Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with Clause-10, in which case all right and obligation of the Employer and the
bidders previously subject to the original dead line will then be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1 Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
23.3 No bid shall be modified or withdrawn after the deadline for submission of Bid.
23.4 Withdrawal or modification of a bid between the deadline for submission of bids and the
expiration of the original period of bid validity specified in Clause 15.1 above or as
extended pursuant to Clause-15.2 may result in the forfeiture of the Bid security pursuant
E: BID OPENING AND EVALUATION
23.1 The Employer will open all the Bids received including modifications made pursuant to Clause
in the presence of the Bidders or their representatives who choose to attend at time, date and the
place specified in Appendix in the manner specified in Clauses 20 and 23.3, In the event of the
specified date of Bid opening being declared holiday for the Employer, the Bids will be opened at
the appointed time and location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security furnished
with each bid will be announced. If the bid security furnished does not conform to the amount and
validity period as specified in the invitation for bid (ref. Column 4 and paragraph 3), and has not
been furnished in the form specified in Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied with
valid bid security will be taken up for evaluation with respect to the Qualification
information and other information furnished in part-I of the bid pursuant to Clause-12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification Documents with
respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the Evaluation
Committee will finalize the list of responsive bidders whose financial bids are eligible for
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount and such other details as the Employer may consider appropriate, will be announced by
the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid, any
discount, and such other details as the Employer may consider appropriate, will be announced by
the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the “Financial Bid”
shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information disclosed to
those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids and
recommendations for the award of a contract shall not be disclosed to Bidders or any other
persons not officially concerned with such process until the award to the successful Bidder has
been announced. Any effort by Bidder to influence the Employer’s processing of Bids or award
decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his
discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates. The
request for clarification and the response shall be in writing or by e- mail, but no change in the
price or substances of the Bid shall be sought, offered, or permitted except as required to confirm
the correction of arithmetic errors discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to his Bid
opening to the contract is awarded. If the Bidder wishes to bring additional information to the
notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid comparison
or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether each Bid
(a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly signed; (c) is
accompanied by the required securities and; (d) is substantially responsive to the requirements of
the Bidding document. During the detailed evaluation of the “Financial Bid”, the responsiveness
of the bids will be further determined with respect to the remaining bid conditions, i.e., priced bill
of quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions and
specifications of bidding documents, without material deviation or reservation. A material
deviation or reservation is one (a) which affects in any substantial way the scope, quality, or
performance of the Works; (b) which limits in any substantial way, inconsistent with the Bidding
documents, the Employer’s rights or the Bidder’s obligations under the Contract; or(c) whose
rectification would affect unfairly the competitive position of other Bidders presenting
substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and may
not subsequently be made responsive by correction or withdrawal of the non-conforming
deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially responsive
in accordance with Sub-Clause 26.2.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation and
deviations and other factors, which are in excess of the requirements of the Bidding documents or
otherwise result in unsolicited benefits for the Employer, shall not be taken in to account in Bid
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the Conditions of
Contact, during the period of implementation of the Contract, will not be taken in to account in
Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s estimate of
the cost of work to be performed under the contract the Employer may require the Bidder to
produce detailed consistency of those prices with the construction methods and schedule
proposed. After evaluation of the price analyses, the Employer may require that the amount of the
performance security set forth in Clause 34 be increased at the expense of the successful /bidder to
a level sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically priced low
and which cannot be substantiated satisfactorily by the bidder may be rejected as non-responsive.
F: AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has been
determined. (Bidder who qualified in Pre-qualification criteria and qualified bidders whose price
bid stage opened and bidder who quoted lowest price in Bill of Quantity will be eligible for
award of contract)
(i) to be substantially responsive to the Bidding documents and who has offered the lowest
evaluated Bid Price; and
(ii) To be within the available bid capacity adjusted to account for his bid price which is the
lowest evaluation in any of the packages opened earlier than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity is less than
the evaluated bid price, even if the said bid is the lowest evaluated bid. The contract will in such
cases be awarded to the next lowest bidder at his evaluation bid price.
32. Employer’s Right to accept any Bid and to reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid, and to
cancel the Bidding process and reject all Bids, at any time prior to the award of contract, without
thereby incurring any liability to the affected bidder or Bidder or any obligation to inform the
affected Bidder or Bidders of the grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by cable, telex or facsimile confirmed by registered letter.
This letter (hereinafter and in the condition of contract called the “Letter of Acceptance”) will
state the sum that the Employer will pay the Contractor in consideration of the execution,
completion, and maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the
furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful Bidder.
It will be signed by the Employer and to the successful Bidder, within 28 days following the
notification of award along with the Letter of Acceptance. Within 21 days of receipt, the
successful Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer will
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security:- A
As per details given in chapter-3, Bid Instruction to Bidder
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall furnish to
the Employer an irrevocable and unconditional guarantee from a Bank in the form set forth
in Section 8 (the “Performance Security”) for an amount equal to 5% (five percent) of its
Contract Price. In case ofbids
mentionedbelow,thesuccessfulBidder,alongwiththePerformanceSecurity,shall also furnish to
the Authority an irrevocable and unconditional guarantee from a Bank in the same form
given at Section 8 towards an Additional Performance Security (The “Additional
Performance Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up to 20%
of the Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 20% of the difference in the (i) Estimated Project Cost (as mentioned
in Bid Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated
@ 30% of the difference in the (i) Estimated Project Cost (as mentioned in Bid
Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance
(B) The Performance Security shall be valid beyond 60 (sixty) days of the Defects Liability Period
and the Additional Performance Security shall be valid beyond 28 (twenty-eight) days of
Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a Nationalized/Scheduled
Indian bank or (b) by a foreign bank located in India and acceptable to the Employer. As per
GoG Finance Department’s Circular No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023
or as per their latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in completing for the contract in question and will
declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a
contract with National Highways Authority of India/ State PWD and any other agencies, if it at
any time determines that the firm has engaged in corrupt or fraudulent practices in completing for
the contractor, orin execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the Conditions
APPENDIX TO ITB
Clause Reference
With respect to
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
1. The Name of the Employer is Executive Engineer (M), Gujarat Maritime [Cl.1.1]
Board, Porbandar
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3(a)]
4. Value of Work is Rs. /- AS per NIT
6. The cost of electric work is Rs.
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities is Rs. ………… [Cl.4.5.6]
9. Price level of the financial year…………… [Cl.4.5.2]
10. Thepre-bidmeetingwilltakeplaceat…………. [Cl.9.2.1]
11. The technical Bid will be opened at the office of the Executive
Engineer (M), Gujarat Maritime Board, Porbandar on dt at
12. Address of the Employer: Executive Engineer (M), PIU, 1st Floor Gujarat
Maritime Board office , Near Chopati Grounf Porbandar Port.
14. The bid should be submitted latest by As stated on online NIT [Cl.20.1&20.2]
15. The bid will be opened at Executive Engineer (M), PIU, 1st Floor [Cl.23.1]
Gujarat Maritime Board office , Near Chopati Grounf Porbandar Port.
As stated on online NIT
16. The Bank Draft in favor of PO GMB Porbandar
18. Escalation factors (for the cost of works executed and financial figure to [Cl.4.5.2]
value) for works completed
Year FinancialYear Multiplyingfactor
Baseyearofinvitingtender 20242025
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[ReferenceCL.4.5.5]
The contractors shall also give a list of machineries in his possession and which they propose
to use on the work.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work (Reference Cl. 4.5.4)
#Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work
1. Two graduate Civil Engineer sand three diploma Civil Engineers when cost of the work to be
executed is more than Rs.50lakhs.
2. One graduate &two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be executed is
less than Rs. 5 lakhs. The Engineer so employed for the Government work must have
sufficient experience to handle the work independently. Such an Engineer shall have to stay at
the site of work and he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer partner
himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of marksheet,
Colour Photograph and the appointment order issued such engineers engaged for this contract
work. If 15 days after issue of work order such designated Site Engineers do not resume or do
not remain present onsite of work, the recovery at the rate of Rs. per month per Engineer
will be made from the bills/deposit/dues of the contractor. Such recovery shall be non-
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-2: QUALIFICATION INFORMATION
(As per Chapeter-1: NIT and Chapter-3: INSTRUCTIONS TO BIDDERS).
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the purpose of post
qualification as provided for in Clause 4 of the Instruction to Bidders. This information will not be
incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2023-2024
Work performed in the last five years 2022-2023
(inRs. Lakhs) 2021-2022
1.1.1 Work performed as prime contractor, work performed in the past as a nominated sub-
contractorwillalsobeconsideredthesub-contractinvolvedexecutionofallmain items of work
described in the bid documents, provided further that all other qualification criteria are satisfied
(in the same name) on works of a similar nature over the last five years** and in current year
before the submission of the bid.
Projec Name of Descriptio Contrac Value of Date Stipulated Actual date Remark
t the n of t No. contract of period of of explaining
Name Employe work (Rs. work completio completion reasons for
r Crore) order n * delay
*Attachcertificate(s) from the Engineer(s)in-charge
**Immediately preceding thefinancial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a nominated sub-
contractor, will also be considered provided the sub-contract involved execution of all main items of work
described in the bid document, provided, further that all other qualification criteria are called (in the same
name and style) in the last five years** and in current year before the submission of the bid.
Year Name Name of Quantity of work performed (Cum/MT) Remarks*
ofthe the Cement Masonry Earth Bituminous (indicate
work Employer Concrete Works Work contractRef)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
1.4 Information on Bid Capacity (works for which bids have been submitted and works which are yet
to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name Value Stipulated Value of Anticipated
of works & No. &Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attachcertificate(s) from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.Clause 4.5.5).
The Bidder should list all the information requested below.
Item of Requirement AvailabilityProposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leasedtobe Capacity Conditions whom to be
procured purchased
1.6 Qualifications and experience of key personnel required for administration and execution of the contract.Attach
biographical data. Refer also to Sub Clause 9.1 of the Conditions of Contract
Position Name Qualification Year of Year of
Experience experiencein
(General) the proposed
Project Manager
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Proposed sub-contract and firms involved
Sectionsofthe ValueofSub- Sub-Contractor Experiencein
works Contractor (Name& similarwork
Attachcopiesofcertificatesonpossessionofvalidlicenseforexecutingwater supply/ sanitary work/
building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements, auditors’ reports
(in case of companies/corporations), etc. List them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in hand,
lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may provide
references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is* .............................................. )
Proposed work method and schedule. The Bidder should attach descriptions, drawings and
charts as necessary to comply with the requirements of the Bidding documents.
(Refer ITB Clause4.1) Programme
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-3: CONDITIONS OF CONTRACT
Conditions of Contract: Table of Contents
A General D. Cost Control
1 Definitions 37 Bill of Quantities
2 Interpretation 38 Changes in the Quantities
3 Language and Law 39 Variations
4 Engineer’s Decisions 40 Payments for Variations
5 Delegations 41 Cash Flow Forecasts
6 Communications 42 Payment Certificates
7 Sub-Contractors 43 Payments
8 Other Contractors 44 Compensations Events
9 Personnel 45 Tax
10 Employer’s & Contractor Risk 46 Currencies
11 Employers Risks 47 Price Adjustment
12 Contractor’s Risk 48 Retention
13 Insurance 49 Liquidated damages
14 Site Investigations Reports 50 Bonus
15 Queries about the Contract 51 Advance Payment
16 Contractors to Construct the works 52 Securities
17 The Works to be Completed By the 53 Deleted
Intended Completion Date
18 Approval by the Engineer 54 Cost of Repair
20 Discoveries E. Finishing the Contract
21 Possession of the Site 55 Completion
22 Access to the Site 56 Taking Over
23 Instructions 57 Final Account
24 Disputes 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 59 Terminations
60 Payment up on Terminations
B. Time Control 61 Property
27 Programme 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted F. Special Conditions of Contract
30 Delays Ordered by The 63 Labour
Engineer 64 Compliance with labour regulations
31 Management Meetings 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities i.e. Schedule-B means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause44 here under
The Completion Date is the date of completion of the Works as certified by the Engineer
in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete
and maintain the Works till the completion of Defects Liability Period. It consists of the
documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the
The Contractor is a person or corporate body who's Bid to carry out the Work has been
accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to
the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as
adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated
from the Completion Date.
The Employer (GUJARAT MARITIME BOARD) is the party who will employ the
Contractor to carry out the Works.
The Engineer (EIC – ENGINEER IN CHAGRE) is the person named in the Contract
Data (or any other competent person appointed and notified to the contractor to act in
replacement of the Engineer) who is responsible for supervising the Contractor,
administering the Contract, certifying payments due to the Contractor, issuing and valuing
Variations to the Contract, awarding extensions of time, and valuing the Compensations
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the Contractor shall
complete the Works. The Intended Completion Date is specified in the Contract Data. The
Intended Completion Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation in the
Plant is any integral part of the work which is to have mechanical, electrical, electronic or
chemical or biological functions.
The Site is the area defined as such in the Contract Data.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Site Investigation Reports are those which were included in the Bidding documents and are
factual interpretive reports about the surface and subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any
modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall commence
execution of the works. It does not necessarily coincide with any of the Site Possession Dates.
A Sub contractor is a person or corporate body who has a Contract with the Contractor to carry
out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the Contractor
which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The Works are
what the Contract requires the Contractor to construct, install, And turn over to the Employer, as
defined in the Contract Data.
2. Interpretation
In interpreting these Conditions of Contract, singular also means plural, male also
means female or neuter and the other way around. Heading have no significance.
Words have their normal meaning under the language of the Contract unless
specifically defined. The Engineer will provide instructions clarifying queries about
Conditions of Contract.
If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to the
Completion Date and Intended Completion date for the whole works)
The documents forming the Contract shall be interpreted in the following order of
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid.
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
5.1 The Engineer may delegate any of his duties and responsibilities to other people
after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is delivered
(in terms of Indian Contract Act).
7. Sub-Contracting
The Contract or May subcontract any portion of work, up to a limits pacified in
contract data, with the approval of the engineer but may not assign the Contract
without the approval of the Employer in writing. Sub-contracting shall not alter the
Contractor’s obligations. Sub-contracting of supply or specific items of work is
The sub-contractor must be registered in appropriate class and category for the part
of work to be sub contracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of
other Contractor. The Contractors shall as refer to in the Contract Data, also
provide facilities and services for them as described in the Schedule. The employer
may modify the schedule of other contractors and shall notify the contractor of any
such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated in the
Schedule or other personnel approved by the Engineer. The Engineer will approve
any proposed replacement of key personnel only if their qualifications, abilities,
and relevant experience are substantially equal to or better than those of the
personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure
that the person leaves the Site within seven days and has no further connection
with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks,
and the Contractor carries the risks which these Contracts states are Contractors
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion, act
of foreign enemies, rebellion, revolution, insurrection or military or usurped power,
civil war, riot commotion or disorder (unless restricted to the Contractor’s
employees), and contamination from any nuclear fuel or nuclear waste or
radioactive toxic explosive.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the Contract
other than the excepted risks are the responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects Liability
Period, in the amounts and deductibles stated in the Contract data for the following
events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment's
(c) Loss of or damages of property(expect the works, Plant, Materials and Equipment)
in connection with the Contract ;and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the
Engineer for the Engineer’s approval before the Start Date. All such insurance shall
provide for compensation to be payable in the types and proportions of currencies
required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required, the
Employer may affect the insurance which the Contractor should have provided
and recover the premiums the Employer has paid from payments otherwise due to
the Contractor or, if no payment is due, the payment of the premiums shall be a
13.4 Alterations to the terms of an insurance shall not be made without the approval of
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to the
15. Queries about the Contract data
The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and shall
carry out the Works in accordance with the programme submitted by the
Contractor, as updated with the approval of the Engineer, and complete them by
the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary works to the Engineer, who is to approve them if they comply with the
Specifications and drawings.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of
the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the Temporary
works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to notify
the engineer of such discoveries and carry out the Engineer’s instructions for
dealing with them.
21. Possession of the Site:-
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and this will
be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the
contract. Contractor/Employer has to foreclose the work within 30 days after lapse
of 25%-time limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer
access to the Site, to any place where work in connection with the Contract is being
carried out or is intended to be carried out and to any place where materials or
plants are being manufactured/ fabricated/ assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works
which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts and
records relating to the performance of the Contractor and to have them audited by
auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision was
wrongly taken, the decision shall be referred to #Superintending Engineer
(Higher Authority)within 14 days of the notification of the Engineer's decision. If
the issue is not resolved, any party can refer the matter for conciliationwithin15
days from the decision given by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Superintending Engineer, both the parties have to refer to the
Chief Engineer concern for the conciliate on process.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Superintending Engineer ,both the parties have to refer to
the #Secretary, Roads &Building Department, Government of Gujarat for the
conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within 14 days of
the notification of the Engineer's decision, the Contractor shall not be entitled to
any additional payment/claim if he doesn’t follow the above sequence in stipulated
time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure stated in the
Special Conditions of Contract.
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods, arrangements
orders, and timing for all the activities in the works along with monthly cash flow
27.2 An update of the Programme shall be a Programme showing the actual progress
achieved on each activity and the effect of the progress achieved on the timing of
the remaining work including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated Programme at
intervals no longer than the period stated in the Contract data. If the Contractor
does not submit an updated Programme within this period, the Engineer may
withhold the amount stated in the Contract data from the next payment after the
date on which the overdue Programme has been submitted.
27.4 The Engineer’s approval of the Programme shall not alter the Contractor’s
obligations. The Contractor may revise the Programme and submit it to the
Engineer again at any time. A revised Programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event
occurs or a Variation is issued which makes it impossible for completion to be
achieved by the Intended Completion Date without the Contractor taking steps to
accelerate the remaining work and which would cause the Contractor to incur
additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting full
supporting information. If the Contractor has failed to give early warning of a delay
or has failed to cooperate in dealing with a delay, the delay by this failure shall not
be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor
for extension of Intended Completion Date refer to the Employer his decision. The
employer shall in not more than 21days communicate to the engineer the
acceptance or otherwise of the Engineer’s decision. If the employer fails to give his
acceptance, the Engineer shall not grant the extension and the contractor may refer
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
the matter under Clause24.1
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or Progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a management
meeting. The business of a management meeting shall be to review the plans for
remaining work and to deal with matters raised in accordance with the early
warning procedure.
31.2 The Engineer shall record the business of management meetings and is to provide
copies of his record to those attending the meeting and to the Employer. The
responsibility of the parties for actions to be taken is to be decided by the Engineer
either at the management meeting or after the management meeting and stated in
writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely
future events or circumstances that may adversely affect the quality of the work,
increase the Contract price or delay the execution of works. The Engineer may
require the contractor to provide an estimate of the expected effect of the future
event or circumstance on the contract price and completion date. The estimate is to
be provided by the Contractor as soon as reason by possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided or
reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C: QUALITY CONTROL
#33. Identifying Defects/ Defect liability period
33.1 Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed before
the period mentioned hereunder from the certified date of completion. The Engineer
in charge shall give the contractor a notice in writing about the defects and the
contractor shall make good the same within 15 days of receipt of the notice. In the
case of failure on the part of the contractor, the Engineer- in-charge may rectify or
remove or re-execute the work at the risk & cost of the contractor. The Engineer-in-
charge shall be entitled to appropriate the whole or any part of the amount of
security deposit towards the expenses, if any, Incurred by him in rectification,
removal or re-execution. The Defects Liability period shall be asunder….
(a) For all works costing up to Rs.50,000 (amount put to tender), the period shall be
Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be 36 Months
from the certified date of completion which should include three monsoons.
(d) For original building works the defect liability period will be4 years or elapse of
monsoon period following date of possession of building taken over by user agency
following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
treated as the last date.
Modified vide R &B D Circular No.PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular No.
TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year from
the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the contractor
shall have to give four years free maintenance guarantee from the certified date
of completion. During this period the contractor shall visit the site every six
months along with the concerned Section Officer / Deputy Executive Engineer
and will examine the work already carried out in this contract like road work,
jungle cutting, side shoulders, side gutter, road furniture, patta etc. and will
prepare Km. wise inspection report duly signed by all concerned and any defect
observed shall be done within 15 days by the contractor at his risk and cost as
per the direction of Engineer in charge. The contractor needs to do videography
of these visits and require to submit at the time of release of FMG. If B.T. the
surface during the maintenance period of 4 years is worn out then agency shall
have to provide renewal coating as per tender item as directed by the Engineer-
in- charge. The amount equivalent to 5% of each running bill shall be withheld
and will be released after the free maintenance guarantee period (i.e. 4 years) is
However, this amount shall be released against fixed deposit or bank guarantee
pledged in the name of Executive Engineer after completion certificate of work
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant clause
for the material inquestion.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment / cutting
for side shoulders, side gutters, kilometer / indicator / guard stones, sign boards
etc. are completed in all respect by the contractor. After completion of the
miscellaneous items, the above said 2% withheld amount shall bereleased.
(Govt. of Gujarat's G.R.No.:TNC-10-2013-3(Part-3)/C,Dtd.13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as per
Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing
more than Rs. 5.00Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate equipment. Till
the setting up of adequate laboratory is completed & reported of this to the
engineer (subject to due verification by engineer’s representative) by contractor
in writing, Rs.2,00,000/- shall be withheld. The qualified quality Engineer shall
be deployed exclusively for this contract by the contractors. If quality Engineer
is not deployed by contractor within one month after the date of work order, the
amount equivalent to Rs.20,000 per month shall be recovered till the actual
deployment of quality engineer. The amount so recovered towards the
deployment of quality engineers shall not be refunded.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill ispaid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk
and cost, the existing lane(s) of the road so that the traffic worthiness and safety
thereof are at no time materially inferior as compared to their condition 10 (ten)
days prior to the date of the Agreement, and shall undertake the necessary
repair and maintenance works for this purpose; provided that theContractor
may, at his cost, interrupt and divert the flow of traffic if such interruption and
diversion is necessary for the efficient progress of works and conforms to Good
Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of doubt,
it is agreed that the Contractor shall at all times be responsible for ensuring safe
operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of any
defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a Defect and
to uncover and test any work that the Engineer considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it
does, the Contractor shall pay for the test and any samples. If there is no defect the
test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of actual
34.3 Agency has to establish testing laboratory on site for the various test to be carried
out in the work for this purpose agency shall construct a pukka laboratory building
with all facility on site at location specified by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of the
defects Liability Period, which begins at Completion and is defined in the contract
data. The Defects Liability Period shall be extended for as long as Defects remain
to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
Defect with in the length of time specified by the Engineer’s notice.
36. Uncorrected Defects:-
If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect corrected,
and the Contractor will pay this amount.
D: COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation, testing and
commissioning work to be done by the Contractor.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is paid
for the quantity of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the original
specifications, drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out the work in accordance with any instruction in this connection
which may be given to him in writing signed by the Engineer and such alteration
shall not invalidate the contract and any additional work which the contractor may
be directed to do in the manner above specified as part of the work shall be carried
out by the contractor on the same conditions in all respects on which he agreed to
do the main work and at the same rate as are specified in the tender for the main
Except that when the quantity of any item exceeds the quantity as in the tender by
more than 130%, the contractor will be paid for the quantity in excess of 130%, at
the rate entered in the SOR of the year during which the excess in quantity is first
39.1 All Variations shall be included in updated programmed produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the one
involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with
regard to class or classes of the work involved shall be selected and the decision of
the Superintending Engineer as to the nearest comparable item shall be final and
binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall
be carried out at the rate entered in the Schedule of Rates of the division for the year
in which the tender was received, increased or decreased by the percentage by which
the tender amount is more or less as compared to the amount arrived at the rates in
the “Schedule of Rates” of the Division in the year in which the tender was received.
If the Schedule of rates of the Division does not contain all the items, the percentage
increase or decrease of the tender shall be calculated considering such items which
were included in the “Scheduled Rates” of the division for the year and for materials
consumed on such item the rate to be charged would be the basic rate taken into
account for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work
shall be carried out at the rate decided by the competent authorities on the basis of
detailed rate analysis after hearing the contractor before a Committee of two
Superintending Engineers stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon,
then the contractor shall within seven days of the date of receipt by him of the order
to carry out the work, inform the Engineer-in-charge of the rate, which it is his
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
intention to charge for such class of work and if the Engineer in charge does not
agree to this rates, he shall by notice in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner as he may
consider it advisable, provided always that if the contractor shall commence work
or incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him
prior to the date of the determination of the rate as aforesaid according to such rate
or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute, the
decision of the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by the
competent authority, the alternation above referred to shall be within the scope of
such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the cost of
the original work and the certificate of the Engineer-in-charge as to such proportion
shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an
updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated
value of the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and
certify the amount to be paid to the Contractor after taking in to account any credit
or debit for the month in question in respect of materials for the works in the
relevant amounts and under conditions set forth in sub-clause 32.3 of the Contract
Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items
in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce the
proportion of any item previously certified in any certificate in the light of later
43.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law.
The Employer shall pay the Contractor the amounts certified by the Engineer
within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract to the
Contractor will be made by the Employer. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid by
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
the Employer and shall be deemed covered by other rates and prices in the
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession
date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed
beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in the
tax structure by Government after due date of bid submission will be compensated
(+/-) on availability or submission of actual documentation. Contractor will have to
intimate Engineer regarding changes occurred in the tax structure after bid
submission. If the contractor fails to provide such information and if any financial
obligation may arise due to change in tax structure, same will be recovered from the
GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of labour,
materials, fuels and lubricants in accordance with the following principles and
procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given in
the contract data up to end of the initial intended completion date or extensions
granted by the Engineer and shall not apply to the work carried out beyond the
stipulated time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula
given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works
executed under variations for which price adjustment will be worked separately
based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor is
not covered by the provisions of this or other clause in the contract, the unit rates
and prices included in the contract shall be deemed to include amounts to cover the
contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion
stated in the Contract Data until Completion of the whole of the works.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
48.2 On Completion of the whole of the Works half the total amount retained is repaid to
48.2 On Completion of the whole of the Works half the total amount retained is repaid to
the Contractor and half when the Defects Liability Period has passed and the
Engineer has certified that all Defects notified by the Engineer to the Contractor
before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
Money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by
the Employer under the provision of this clause, Employer shall consider the said
request of the Contractor provided that the refund here under shall be made in
tranches of not less than 1% (One Percent) of the Contract Price and Contractor
furnishes an irrevocable and unconditional Bank guarantee for an equal amount
substantially in the format of Bank Guarantee for Performance Guarantee enclosed
with SBD and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an option to
submit a fresh irrevocable and unconditional Bank Guarantee for an amount equal
to 5% of the total value of work executed substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to 60 days
beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day
stated in the Contract Data for each day that the Completion Date is later than the
Intended Completion Date (for the whole works or the milestone as stated in the
contract data). The total amount of liquidated damages shall not exceed the amount
contract data). The total amount of liquidated damages shall not exceed the amount
defined in the Contract Data. The Employer may deduct liquidated damages from
payment due to the Contractor. Payment of liquidated damages does not affect the
Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been
paid, the Engineer shall correct any overpayment of liquidated damages by the
Contractor by adjusting the next payment certificate. The Contractor shall not be
entitled for any interest on the over payment calculated from the date of payment to
the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the
tender, then the contractor shall pay to the employer the relevant sum stated in the
Contract Data as Liquidated damages for such default and not as penalty for
everyday or part of day which shall elapse between relevant time for completion
and the date stated in the taking over certificate of the whole of the works on the
relevant section, subject to the limit stated in the contract data.
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to the
contractor. The payment or deduction of such damages shall not relieve the
contractor from his obligation to complete the works on from any other of his
obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any
Section, a Taking Over Certificate has been issued for any part of the Works or of a
Section, the liquidated damages for delay in completion of the remainder of the
Works or of that Section shall, for any period of delay after the date stated in such
Taking-Over-Certificate, and in the absence of alternative provisions in the
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Contract, be reduced in the proportion which the value of the part so certified bears
to the value of the whole of the Works or Section, as applicable. The provisions of
this Sub-clause shall only apply to the rate of liquidated damages and shall not
affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall pay to
the contractor a sum stated in Contract Data as bonus for every completed month
but subjected to maximum amount as stated in Contract Data; which shall
elapse between the date of completion of all items of works as stipulated in the
contract, including variations ordered by the Engineer and the time prescribed in
Bonus shall be paid only to works amounting to above INR 5 crore with time limit
of the works is equal or more than 6 months. The bonus would be paid asunder
% of Time Saved % of Initial Contract Price
entitled for Bonus
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be Recorded in
writing) to the Contractor of the amounts stated in the Contract Date by the date
stated in the Contract Date, against provision by the Contactor of an Unconditional
Bank Guarantee in a form and by a bank acceptable to the Employer in amounts
and currencies equal to be at least 110% of the advance payment. The guarantee
shall remain effective until the advance payment has been repaid, but the amount of
the guarantee shall be progressively reduced by the amounts repaid by the
Contractor. The Mobilization advance would be deemed as interest bearing advance
at an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment, plant and
Mobilization expenses required specifically for execution of the Works. The
Contractor shall demonstrate that advance payment has been used in this way by
supplying copies of invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from
payments otherwise due to the Contractor, following the schedule of completed
percentages of the Works on a payment basis. No account shall be taken of the
advance payment or its repayment in assessing valuations of work done, variations,
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
price adjustments, Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids) shall
be provided to the Employer no later than the date specified in the Letter of
Acceptance and shall be issued in an amount and form and by a bank or surety
acceptable to the Employer, and denominated in Indian Rupees. The performance
Security shall be valid until a date 60 days from the date of expiry of Defects
Liability Period and the additional security for unbalanced bids shall be valid until a
date 28 days from the date of issue of the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works between
the Start date and the end of Defects Correction periods shall be remedied by the
Contractor at the Contractor’s cost if the loss or damages arises from the
Contractor’s acts or omissions.
E: FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of
the works and the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total
amount that the Contractor considers payable as full and final settlement of all
claims under the Contract for items before the end of the Defects Liability Period.
The Engineer shall issue a Defect Liability Certificate and certify any final payment
that is due to the Contractor within 56 days of receiving the Contractor's account if
it is correct and complete. If it is not, the Engineer shall issue within 56 days a
schedule that states the scope of the corrections or additions that are necessary. If
the Final Account is still unsatisfactory after it has been resubmitted, the Engineer
shall decide on the amount payable to the Contractor and issue a payment
certificate, within 56 days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses and
savings in final account is observed, the Engineer/Employer shall be at liberty to
restrict the final payment of BOQ items to the lowest amount evaluated of the bids
considering the final quantities and the rates quoted including the rebates if any.
Payment of variation items shall however be made at the rates approved by the
Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract data.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates stated
in the Contract data, or they do not receive the Engineer’s approval, the Engineer
shall withhold the amount stated in the Contract Data from payments due to the
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the following:
1. The contractor stops work for 28 days when no stoppage of work is shown on
the current Programme and the stoppage has not been authorized by the
2. The Engineer instructs the Contractor to delay the progress of the Works and
the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation other
than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within a
reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days for
which the maximum amount of liquidated damages can be paid as defined in
the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering,
giving, receiving or soliciting of anything of value to influence the action of a
public official in the procurement process or in contract execution. “Fraudulent
practice” means a misrepresentation off acts in order to influence a procurement
process or the execution of a contract to the detriment of the borrower, and includes
collusive practice among Bidders (prior to or after bid submission) designed to
establish bid prices at artificial non-competitive levels and to deprive the Borrower
of the benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done less
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
advance payment s received up to the date of the issue of the certificate, less other
recoveries due in terms of the contract, less taxes due to deducted at source as per
applicable law and less the percentage to apply to the work not completed as
indicated in the Contract data. Additional Liquidated Damages shall not apply. If
the total amount due to the Employer exceeds any payment due to the Contractor
the total amount due to the Employer exceeds any payment due to the Contractor
the difference shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought by
the contractor and available at site, the reasonable cost of removal of equipment,
repatriation of the Contractor’s personnel employed solely on the works, and the
Contractor’s cost of protecting and securing the Works and less advance payment
received up to the date of the certificate, less other recoveries due in terms of the
contract and less taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipment, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because of a
Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely
outside the control of either the Employer or the Contractor the Engineer shall
certify that the Contract has been frustrated. The Contractor shall make the Site safe
and stop work as quickly as possible after receiving this certificate and shall be paid
for all work carried out before receiving it and for any work carried out afterwards
to which commitment was made.
F: SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his
own arrangements for the engagement of all staff and labour, local or other, and for
their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a
return in detail, in such form and at such intervals as the Engineer may prescribe,
showing the staff and the numbers of the several classes of labour from time to time
employed by the Contractor on the site and such other information as the Engineer
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor
shall abide at all times by all existing labour enactments and rules made thereunder,
regulations, notification and bye laws of the State or central Government or local
authority and any other labour law (including rules), regulations, bye laws that may
be passed or notifications that may be issued under any labour law in future either
by the State or the Central Government or the local authority. Salient features of
some of the major labour laws that are applicable to the construction industry are
given below. The Contractor shall keep the Employer indemnified in case any
action is taken against the Employer by the competent authority on account of
contravention of any of the provisions of any Act or rules made there under,
regulations or notifications including amendments. If the Employer is caused to pay
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
or reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money due to
the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor any sum
required or estimated to be required for making good the loss or damage suffered
by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923:- The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972:- Gratuity is payable to an employee under the Act on
satisfaction of certain conditions on separation if an employee has completed 5 years
service or more on death, the rate of 15 days wages for every completed year of service.
The Act is applicable to all establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The benefits
payable under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for certain
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of
Registration and the Contractor is required to take license from the designated Officer.
The Act is applicable to the establishments or Contractor of Principal Employer, if they
employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways
are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be
paid, when it will be paid and what deductions can be made from the wages of the
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination
against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965:- The Act is applicable to all establishments employing
20 or more employees. The Act provides for payments of annual bonus subject to a
minimum of 8.33% of wages and maximum of 20 % of wages to employees drawing
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Rs. 3500/- per month or less. The bonus to be paid to employees getting Rs, 2500/- per
month or above Rs. 3500/- per month shall be worked out by taking wages as Rs.2500/-
per month only. The Act does not apply to certain establishments. The newly set-up
establishments are exempted for five years in certain circumstances. Some of the State
Governments have reduced the employment size from 20 to 10 for the purpose of
applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes
illegal and what are the requirements for laying off or retrenching the employees or
closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by some
of the State and Central Government to 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the
Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:-The Act lays the procedure for registration of trade unions
of workmen and employers. The Trade Unions registered under the Act have given
certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :-The Act prohibits employment
of children below 14 years of age in certain occupations and process and provides for
regulation of employment of children in all other occupations and processes.
Employment of Child labouris prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of
service) Act 1979:- The Act is applicable to an establishment which employs5 or
more inter-state migrant workmen through an intermediary (who has recruited
workmen in one state for employment in the establishment situated in another state).
The inter-state migrant workmen, is an establishment to which this Act become
sapplicable, are required to be provided certain facilities such as housing, medical aid,
traveling expenses from home up to the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:- All the establishments
who carry on any building or other constructions work and employ 10 or more workers
are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of the
cost of construction as may be modified by the government. The Employer of the
establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance,
Housing accommodations for workers near the workplace etc. The Employer to whom
the Act applies has to obtain a registration certificate from the Registering Officers
appointed by the Government.
P) Factories Act 1948 :-The Act lays down the procedure for approval of plans before
setting up a factory, health and safety provisions, welfare provisions, working hours,
annual earned leave and rendering information regarding accidents or dangerous
occurrences to designated authorities. It is applicable to premises employing
persons or more with aid of power or 20 or more persons without the aid of power
engaged in the manufacturing process.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Q) Royalty charges-The contractor shall pay the royalty to the competent authority as per
rule. The royalty charges paid shall be borne by the contractor and shall not be
reimbursed by the Employer.
R) Following Pollution control Acts and amendments made the re of from time to
time shall be applicable.
1. Water (Preservation and control of Pollution) Act,1974
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for
best energy use, waste management, the reduction of pollution as in EMS
(Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause24)
The procedure for arbitration will be as follows:-
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision was
wrongly taken, the decision shall be referred to #Superintending Engineer
(Higher Authority) within 14 days of the notification of the Engineer's decision. If
the issue is not resolved, any party can refer the matter for conciliation within
days from the decision given by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Superintending Engineer, both the parties have to refer to the
#Chief Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Superintending Engineer, both parties have to refer to the
#Secretary, Roads & Building Department, Government of Gujarat for the
conciliation process.
If the dispute is not resolved through the conciliation process, contractor
may refer the dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal. If the Contractor fails to refer a claim /dispute to the Higher Authority
within 14 days of the notification of the Engineer's decision, the Contractor
shall not be entitled to any additional payment/claim if he doesn’t follow the
above sequence in stipulated time. However, during such period, he would not
stop the work in any case.
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-4: CONTRACT DATA
Clause Reference With respect To section
Item marked“N/A”do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Executive Engineer(Mech.), Gujarat Maritime Board, PIU-Porbandar
Address: Office Of The Executive Engineer,(Mech.), 1st Floor, GMB office
complex, near ST Bus Stand, Behind Chapatti Ground Porbandar-360575
Name of authorized Representative(will be intimated later)
2. The Engineer is………………………
Name of Authorized Representative:…………………………
3. The Defects Liability Period is 01(One)year from the date of [CL.1.1&33]
4. The Start Date shall be 1 days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
02 (Two)Months after start of work with the following milestones:
Mile stone dates: [CL.2.2&49.1]
Physical works to be completed Period from the start date
Milestone1i.e. ….. % …. days.
Milestone2i.e. …..% …days.
Milestone3i.e. …..% …..days.
Milestone4i.e. …..% ….days.
6. The Site is located at to be proposed by the bidder. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Tug repairing work with items as per [CL.1.1]
B.O.Q. The works shall, interlay, include the following, as Specified or as
Site clearance; setting – out and layout; widening of existing carriageway
and strengthening including camber corrections; construction of new road/
Parallel service road; bituminous pavements remodeling/construction of
Junctions, intersections, bus bays, lay-bays; supplying and placing of
drainage Channels, flumes, guard posts and guard other related items;
construction/extension of cross drainage works, bridge, approaches and
other related stones; protective works for roads/bridge; all aspects of quality
assurance of various components of the works; rectification of The defects
in the completed works during the Defects Liability Period; submission of
“As- built’’ drawings and any other related documents; and other item of
work as may be required to be carried out for completing the work in
accordance with the drawings and the provisions of the contract and to
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments and bearing; pre
stressed / reinforced cement concrete superstructure; wearing coat, hand railings,
expansion joints, approach slabs, drainages spouts/down take pipes, arrangements for
fixing light posts, water mains, utilities etc; provision of suitably designed protective
works; providing wing/return walls; provision of road markings, road signs etc.; all
aspects of quality assurance; clearing the site and handing over the works on
completion; rectification of the defects during the Defects Liability Period and
submission of “As-built” drawings and other related
documents; and other items of work as may be required to be carried out for
completing the works in accordance with the drawings and the provisions of the
contract and to Insure safety
(C) Other Items
Any Other Items as required to fulfill all contractual obligations as per the Bid documents.
10. The following documents also form part of the Contract:
As per clause 2-3 [CL.2.3(9)]
11. The law which applies to the Contract is The law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of sub contracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex–II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death is Rs 5 lakhs per [CL13]
occurrence with the number of occurrences limited to four. After each occurrence, the
contractor will pay an additional premium necessary to make insurance valid for four
occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be Dated…………………….. [CL.21]
19. The period for submission of Programme for approval of the engineer shall be 21 days [CL.27.1]
from the issue of Letter of Acceptance.
20. The period between program updates will be.............days. [CL.27.3]
21. The amount to be withheld for late submission of an updated Programme shall be [CL.27.3]
22. The following events shall also be Compensation Events Substantially adverse ground [CL.44]
conditions encountered during the
Course of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional mobilization by
the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not caused by
the contractor.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
Military authority
23. The currency of the Contract is Indian Rupees [CL.46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not found
applicable in a work, the weight component of that commodities {i.e.
‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as indicated in SBD for the
purpose of Price Adjustment} shall be clubbed with the weight component of
‘Other Material’ (Pm), such that the gross % weight of the components shall
remain as 100%.
R= value of work as defined in Clause47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour shall
be paid in accordance with the following formula:
VL= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State on
days preceding the scheduled date of opening of technical Bids as
published by Labour Bureau, Ministry of Labour, Government of
Li= The consumer price index for industrial workers for the State for the
month under consideration as published by the Labour Bureau,
Ministry of Labour, Government of India.
Pl= Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement
procured by the contractor
Vc = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for cement.
C0 = The all India wholesale price index for Ordinary Portland
Cement on 28 days preceding the scheduled date of opening
of technical bid as published by the Office of the Economic
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Ci= The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce &Industry.
Pc= Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due
to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel-Long Products Re bars)
on 28 days preceding the date of opening of Bids as published by the Office of
the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long Products
Re bars) for the month under consideration as published by Office of the
Economic Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce &Industry.
Ps=Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Re bars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb=Increase or decrease in the cost of work during the month under consideration
due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi= The official retail price of bitumen of IOC depot at the nearest centre
for the 15 day of the month under consideration.
Pb=Percentage of bitumen component of the work
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to the date
of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of
IOC at the nearest centre for the 15 day of the month of the under
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has been
chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery
spare procured by the Contractor shall be paid in accordance with the
following formula
Vp = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of machinery
for mining, quarrying and Construction for the month under
consideration as published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce
Pi= The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month under
consideration as published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of Commerce
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts has been
chosen to represent the Plant and Machinery Spares group
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement,
steel, bitumen and POL.
M0= The All Indian wholesale price index (all commodities) on 28days
preceding the scheduled date of opening of technical Bids, as published by
the Office of the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce &Industry.
Mi= The All India wholesale price index (all commodities) for the month
under consideration as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pm= Percentage of local material components (other than cement, steel,
bitumen and POL) of the work.
The following percentage will govern the price adjustment for the entire
Sr. No Description Of Material Percentage
6 Plant & Machinery Spares Pp %
7 Other Materials–Pm %
25. The proportion of payments retained (retention money) shall be 6% {CL.48} from
each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole
of work {CL.49}
Delay in Completion of work (1/2000)th of the Initial contract price,
rounded off to the nearest Thousand, per day.
For sectional Completion
(wherever specified In item 6 of
Contract data) (1/2000)th of initial
contract price for #5 km Section,
rounded off to the nearest thousand
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
27. Maximum limit of liquidated damages 10 percent of the Initial {CL.49}
For delay incompletion work Contract Price rounded off to
The nearest thousand. L.D. AS per chapter
28. Amount of Bonus for early completion Amount of bonus for early
Completion of work shall be
given as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract
{CL.50} Completion of work Price
30. The amount of the advance payment are: {CL. 51 &52}
#Nature of Advances Amount(Rs.) Conditions to
i Mobilization10% of the contract On submission of unconditional Price
Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor
may furnish four bank guarantees
of 2.5 % of each valid for the full
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is satisfied That
equipment. Total amount will the equipment is required for
equipment. Total amount will the equipment is required for
be subject to a maximum of performance of the contract) and on
5% of the Contract Price submission of unconditional Bank
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment
of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL.51.3}
The advance loan shall be repaid with percentage deduction from the interim payments
certified by the Engineer under the Contract. Deduction shall commence in the next
Interim Payment Certificate following that in which the total of all such payments to the
Contractor has reached not less than 20 percent of the Contract Price or 6 (six) months
from the date of payment of first installment of advance, whichever period concludes
earlier, and shall be made at the rate of 20 percent (collectively for both Mobilization
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Advance and Equipment Advance) of the amounts of all Interim Payment Certificate
until such time as the loan has been repaid, always provided that the loan shall be
completely repaid prior to the expiry of the original time for completion pursuant to
Clause 17 and28.
33. The securities shall be for the following minimum amounts equivalent {CL.52} As
a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as presented in Section 8 of the Bidding
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL.58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets{CL. 58}are
required within 28 days of the issue of certificate of completion of the whole or section
of the work, as the case maybe.
36. Theamounttobewithheldforfailingtosupply“asbuilt”drawings{CL.58}by
The Date required is Rs ...............Lacs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60}
The Employer’s additional cost for completing the Works shall be 20 percent.
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-5: TECHNICAL SPECIFICATION
As Per Separate Sheet Attached under CHAPTER-9
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-6: FORM OF BID
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in
conformity with the conditions of Contract, specification, drawings, Bill of Quantities and
Addenda for the sum (s)of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably
possible after the receipt of the Engineer’s notice to commence, and to complete the whole
of the Works in the Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for receiving
the same, and it shall remain binding upon it and may be accepted at any time before the
expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together with your
written acceptance thereof, shall constitute a binding contract between us.
5. We understand that you are not bound to accept the lowest or any tender you may receive.
-------duly authorized to sign bids for and on behalf of-----------------------------------
(in block capitals or typed)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-7: BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated provisional, and are given to
provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities
,where applicable, and otherwise at such rates and prices as the Engineer may fix within
the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided the
cost shall be deemed to be distributed among the rates and prices entered for the related
7. General direction and descriptions of work and materials are not necessarily repeated or
summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the
Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for building
are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling for
its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
AS PER SEPARATE ATTACHED SHEET UNDER CHAPTER-8
I/We am/are willing to carry out the work at… ............................... %above/below percent (Should be
Written in figures and words) of the estimated rate mentioned above. The Amount of my/our tender works
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………%Above
In words In words
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any)%(in figure)……………………………… (in
(C)Net Tendered Amount (A-B)(in figure) ………………………………
1 TheContractorshallexhibitaboardwithdetailedspecificationanddetailsofworkas directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 InallR.C.C.ItemsinRateAnalysisStandardCementConsumptionhasbeentakenasper Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost
Of difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender.
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
SECTION-8: SECURITIES AND OTHER FORMS
BID SECURITY (BANKGUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called the
“The Bidder”) has submitted his bid Dated ------------------------ (Date) for the construction
of------------------------------------(Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We-------------------------------------------------
(nameof Bank)of -----------------------------------------------------------(name of country)having our
Registered office at-------------------------------------------------------(herein after called
“the bank”)are bound unto--------------------------------------------(name of Employer)
(herein after called “The Employer”)in the sum of ------------------------------------------------------------*
For which payment well and truly to be made to the said Employer the Bankitself ,his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this----------------------day of -------------------
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid validity
specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the Employer during the
period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with the
Instructions to Bidders, if required ; or
B. Fails or refuse to furnish the Performance Security ,in accordance with the
Instructions to Bidders ;or
C. Does not accept the correction of the Bid Price pursuant to Clause27 (Correction of
We undertake to pay to the Employer up to the above amount upon receipt
of his first written demand, without the employer having to substantiate his demand,
provided that in his demand the Employer will note that the amount claimed by him is
due to him owing to the occurrence of one or any of the three conditions, specifying
the occurred conditions or conditions.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
This Guarantee will remain in force up to and including the date ----------------------------------- **
days after the deadline for submission of Bids as such the dead line is stated in the
Instructions to Bidders or as it may be extended by the Employer, notice of which
extension (s) to the Bank is hereby waived. Any demand in respect of this guarantee
should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown in Clause
16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should be inserted by
the Employer before the Bidding documents are issued.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
PERFORMANCE SECURITY
Name: The Executive Engineer(Mech.)
Project Implementation Unit (PIU)
Gujarat Maritime Board, Near ST Bus Stand
Bh Chopati Ground Porbandar-360575.
contractor)(hereaftercalled“theContractor”)hasundertaken,inpursuanceof
---------(name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with the
ANDWHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on
behalf of the Contractor, up to a total of------------------------------------------
(amount of guarantee)* ---------------------------------------(in words),such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and we
undertake to pay you ,upon your first written demand and without cavil or argument ,any
sum or sums with in the limits of----------------------------------------
(amountofguarantee)asaforesaidwithoutyourneedingtoproveortoshowgrounds or reasons for
your demand for the sum specified therein.
Weherebywaivethenecessityofyourdemandingthesaiddebtfromthecontractor before
presenting is with the demand.
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed there under or of any of the Contract documents
which may be made between your and the Contractor shall in any way release us from any
liability under this guarantee, and we here by waive notice of any such charge, addition or
This guarantee shall be valid until 60 days from the date of expiring of the Defect
Liabilities period.
Signature and Seal of the guarantor-----------------------------
*An amount shall be inserted by the Guarantor, representing the percentage the Contract
price specified in the Contract denominated in Indian Rupees.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
ADDITIONAL PERFORMANCE SECURITY
[Clause34.1.(A)]
Name: The Executive Engineer (Mech.)
Project Implementation Unit (PIU)
Gujarat Maritime Board, Near ST Bus Stand
Bh Chopati Ground Porbandar-360575
contractor)(hereaftercalled“TheContractor”)hasundertaken,inpursuanceof
---------(Name of Contract and brief description of Works) (hereinafter called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum
specified therein as security for compliance with his obligation in accordance with the
AND WHERE AS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you on
behalf of the Contractor, upto a total of------------------------------------------
(amount guarantee)--------------------------------(inwords),such sum being payable in types
and proportions of currencies in which the Contract prices is payable, and we undertake to
pay you ,upon your first written demand and without cavil or argument ,any sum or sums
(amountofguarantee)asaforesaidwithoutyourneedingtoproveortoshowgrounds or reasons for
your demand for the sum specified therein.
Weherebywaivethenecessityofyourdemandingthesaiddebtfromthecontractor before
presenting is with the demand
We further agree that no change or addition to or other modification of the terms of the
Contract to of the Works to be performed there under or of any of the Contract documents
which may be made between your and the Contractor shall in any way release us from any
liability under this guarantee, and we here by waive notice of any such charge, addition or
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor-----------------------------
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
BANK GUARANTEEF OR ADVANCE PAYMENT
InaccordancewiththeprovisionsoftheConditionsofContract,sub-clause
51.1(“Advance Payment”)of the above mentioned Contract,-------------------------------
------------------- (name and address of Contractor)(herein after called
“the Contractor”)shall deposit with
(name of Employer) a bank guarantee his proper and faithful
performance under the said Clause of the Contract in an amount of
(amount of Guarantee)*-
We, the ---------------------------------------- (bank of financial institution),as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary obligator
and not as Surety merely, the payment to---------------------------------------- (name of
Employer) on his first demand without whatsoever right of obligation on our partand
without his first claim to the Contractor ,in the amount not exceeding---
- ------------------------ (amount of guarantee)*words) - ---------------
We further agree that no change or addition to or other modifications of the terms of the
Contractor or Works to be performed there under or of any of the Contract documents
which may be made between --------------------------------- (name of Employer) and the
Contractor, shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such change, addition or modifications.
This guarantee shall remain valid and in full effect from the date of the advance
payment under the Contract until -------------------------------------- (name of employer)
receives full repayment of the same amount from the contractor.
Signature and Seal
Bank/Financial Institution Address
*AnamountshallbeinsertedbythatBankorFinancialInstitutionrepresentingthe amount of the
Advance Payment, and denominated in Indian Rupees.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number,as
given in the Instructions to Bidders)for the Contract Price of Rupees ( )
You are requested to furnish performance security, in the form detailed in para34.1
of ITB for an amount equivalent to Rs.___ within 10 days of the receipt of this letter of
acceptance up to beyond 60 days from the date of expiry of defects Liability period i.e.upto
and the Additional Performance Security for an
amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Datei.e.upto and sign the contract, failing which action as
stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature
Name and title of
Signatory Name of
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as corrected
and modified in accordance with the Instructions to Bidders, if corrections or modifications
have not been affected.
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Issue of Notice to proceed with the work
(Letter head of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing there quisite security in ITB Clause34.1 and
signing of the Contract for the work of
At a bid Price ofRs.
You are here by instructed to proceed with the execution of the said works in
accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory authorized To
sign on behalf of Employer)
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
This agreement, made on the day of between
_ (name and address of Employer) (Hereinafter called “the
Employer) and (name and address of contractor) h
Where as the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and the
employerhasacceptedtheBidbytheContractorfortheexecutionandcompletionof such works
and the remedying of any defects therein, at a cost of Rs.
NOWTHISAGREEMENTWITNESSETHASFOLLOWS
1. In this Agreement, words and expression shall have the same meanings as are
respectivelyassignedtothemintheconditionsofcontracthereinafterreferredto and they
shall be deemed to form and be read construed as part of this Agreement.
2. In Consideration of the payment to be made by the Employer to the contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to executive
and complete the works and remedy any defects therein in conformity in all aspects
with the provisions of thecontracts.
3. The employer hereby covenants to pay the Contractor in consideration of the execution
and completion of the works and the remedying the defects wherein contract price or
such other sum as may become payable under the provisions of the Contract at the
times and in the manner prescribed by the contract.
4. TheFollowingdocumentsshallbedeemedtoformandbereadyandconstruedas part of this
i) Letter of Acceptance
ii ) Notice to proceed with the works:
iii) Contractor’sBid
iv) Conditions of contract :Generaland Special
v) Contract Data
vi) Additional conditions
viii) Bill of Quantities and
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
ix) Any other documents listed in the Contract
Data as forming part of the Contract.
In witness where of the parties there to have caused this Agreement to be executed
the day and year first before written
The Common seal of------------- Was hereunto affixed in the presence of:
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
to 25% of the value of the work during implementation of the contract.
Title of officer
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
(For BID Validity)
I ,the undersigned do hereby undertake that our firm M/s……………………………………
……………..………………………………..agree to a bid e by this bid for a period ............................ days
For date fixed for receiving the same and it shall be binding on us and may be accepted at any
time before the expiration of that period.
(Signed by an Authorized
officer of the firm)
Title of officer
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-8: SCHEDULE B / BILL OF QUANTITY (PART OF SECTION-7)
Item Item Description Quantity Unit Rate Amount
(PART- A ADMINITRATIVE - Dry Dock Rent )
1 Charges for steel floating dry dock at 30 Days 141120.00
Kandla port including dock hire
charges, block shifting charges , crane
hire charges, fresh water charges,
port & custom dues , anchorage
charges , agent charges, mechanical
department charges , fire & tank
testing charges, survey & technician,
crews , , EIC & site visiting officers
permits including vehicle permit
charges, pilotage charges, docking,
undocking additional craft assistance
charges , bunkering of F.W. 100 KL
POL bunkering charges & permits
excluding fuel cost. Port /custom
/mmd permission liasioning charges
docking & survey related, domestic
use power charges , dock cleaning
charges blocksin shifting charges
etc. complete in all respect .
2 Berth hire charges sailing vessels, 720 Hrs 25.99
launches, tugs, small crafts, barges
etc. using south, north and west
wharves of bunder basin
maintenance jetty , ferry berths and
service jetty at OOT for other out
fitting & repairing other than dry
Total of part A
(PART- B Docking Repairing -
Mechanical Items)
Hull Cleaning by HP 300 bar Water
1 Jet 1100.00 Sq.Metre 72.60
Hull Cleaning by Shot/Sand Blasting
Labour Scrapping, Cleaning painting
structures/decks/E/R/Piping/Machi
nery etc. for First coat
Labour Scrapping, Cleaning painting
structures/decks/E/R/Piping/Machi
nery etc. for additional coat
Removing and re-fitting sea chest
5 gratings. 4.00 Each 9436.90
Sea chest filters cleaning with all
6 consumables including labour and 2.00 Each 9891.20
material in all respect.
Sea chest cleaning, scrapping and
7 painting with primer, with 2.00 Each 8529.40
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
consumables and labour charges
only, excluding servicing of valves.
Renewal of Hull steel by 3.15-20 MM
IRS Approved Steel Plate including
8 cutting, Removal, Grinding, Gouging, 16000.00 Kg 146.30
Inspection and Consumalebs for
Item No.9 : Supply of Marine Paints (a
(a) Supply of Akzonobel MAKE
9a MARINE Epoxy Primer 269 (similar 480.00 Liter 451.00
(b) Supply of Akzonoble Paint Marine
9b epoxy anti corrosive 262 460.00 Liter 489.50
(C )Supply of Akzonoble Paint Marine
9c epoxy Tie coat 200.00 Liter 440.00
(d) Supply of Aknonable Paint marine
9d anti fouling SPC (High quality for 60 220.00 Liter 1485.00
month warranty)
(e) Supply of Aknonoble Paint Marine
9e epoxy finish paint of various shade 620.00 Liter 495.00
Supply of marine epoxy thinner
9f suitable for epoxy paint 280.00 Liter 198.00
Alluminium Anodes Size : 400 x 100 x
10 25 mm. having strips, removing and 110.00 Each 2409.00
fitting with labour and materials.
Anchor chipping, scrapping, clearning
11 and rousing after removing from 2.00 Nos. 13637.80
vessel and refitting with chain.
Anchor Chains taking out from vessel,
chipping, scrapping, rousing,
measuring and recording link
12 dimension on drawing. After 330.00 Metre 169.40
satisfactory inspection by Surveyor
again put in to vessel. Chain 12.5 to
24 mm nominal dia.
Chain Stopper; Renewal
Chain Guide Roller : Servicing.
Remove & refit back the tyre fender
15 with chain and Dshackles and Labour 40.00 Nos. 2842.40
Re-newal of only pipe 15 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 20 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Re-newal of only pipe 25 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 40 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 50 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 65 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 80 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 100 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Re-newal of only pipe 150 mm NB
after removing by gas cutting and
refitting by welding with MS SCH
ASTM A-53 pipe of ISI make,
including, labout and material in all
Pipe Class-C Galvanized iron 65MMB
25 for rail guard 15.00 Metre 789.80
Renewal of Flange 25 mm NB after
removing by gas cutting and refitting
26 by welding with pipe of ISI make, 10.00 Each 408.10
including labour and material in all
Renewal of Flange 40 mm NB after
removing by gas cutting and refitting
27 by welding with pipe of ISI make, 15.00 Each 511.50
including labour and material in all
Renewal of Flange 50 mm NB after
removing by gas cutting and refitting
by welding with pipe of ISI make,
including labour and material in all
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Renewal of Flange 65 mm NB after
removing by gas cutting and refitting
29 by welding with pipe of ISI make, 30.00 Each 745.80
including labour and material in all
Renewal of Flange 80 mm NB after
removing by gas cutting and refitting
30 by welding with pipe of ISI make, 10.00 Each 861.30
including labour and material in all
Renewal of Flange 100 mm NB after
removing by gas cutting and refitting
31 by welding with pipe of ISI make, 4.00 Each 1190.20
including labour and material in all
Renewal of Flange 150 mm NB after
removing by gas cutting and refitting
32 by welding with pipe of ISI make, 4.00 Each 1339.80
including labour and material in all
Removal and Refitting of Pipe from
up to 50 mm dia as per orignal size
33 with new joints and hardware, only 125.00 Metre 222.20
labour and consumables. New Pipe
and parts Extra at actual cost.
Removal and Refitting of Pipe from
51 mm dia to 100 mm dia as per
orignal size with new joints and
hardware, only labour and
consumables. New Pipe and parts
Extra at actual cost.
Removal and Refitting of Pipe from
101 mm dia to 150 mm dia as per
orignal size with new joints and
hardware, only labour and
consumables. New Pipe and parts
Extra at actual cost.
Renewal of 25 mm NB Bend after
removing old and refitting by welding
with pipe including labout and
material and respect.
Renewal of 40 mm NB Bend after
removing old and refitting by welding
with pipe including labout and
material and respect.
Renewal of 50 mm NB Bend after
removing old and refitting by welding
with pipe including labout and
material and respect.
Renewal of 65 mm NB Bend after
removing old and refitting by welding
with pipe including labout and
material and respect.
Renewal of 80 mm NB Bend after
40 removing old and refitting by welding 7.00 Nos. 1027.40
with pipe including labout and
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
material and respect.
Renewal of 100 mm NB Bend after
removing old and refitting by welding
with pipe including labout and
material and respect.
Man Hole Cover : Remove / refit on
deck for inspection / renewal of one
time, with renewal of packing
Servicing of tow hooks excluding
replacement of broken spring
complete in all respect with grills
(Vessel Above 15 Ton BP to 35 BP.)
Renew rubber packing by removing
44 old one with consumables. (SIZE : 40 80.00 R.Metre 484.00
General machining work / mfg. of
brass, GM material like bushes,
45 sleeve, adaptors, valve 40.00 Kg 986.70
spindle/lead,/seat etc. with material
Painting to Draft Marks, Ships name,
46 port of registry and line cutting 4.00 Each 5863.00
between DLL & LLL.
Cleaning, servicing of pump with
disassembling & Assembling
including all consumables materials
in all respect. Except spares, maching
etc. works. Bettween Size above 1-3
Cleaning, servicing of pump with
disassembling & Assembling
including all consumables materials
in all respect. Except spares, maching
etc. works. Bettween Size Up to 01 HP
/Semi rotory Hand pump HP
Cleaning, servicing of pump with
disassembling & Assembling
including all consumables materials
in all respect. Except spares, maching
etc. works.(SIZE : Between 10 -
Fore peak & chain locker including
fuel/water tank compartment
50 removal of slug, oil water and other 1.00 Job 12702.80
materials& cleanning work :vassel
size LOA above 24 mtr
Aft peak including all water tank, fuel
tank & chain locker compartment
removal of slug, oil water and other
materials& cleaning work
Engine room below floor plates,
compartments, removal of slug, oil,
water and other materials with all
FW/Ballast tank: Applying a coat of
53 cement wash inside the tank, cleaning 40.00 Ton 526.90
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
the tank after cement washing and
bailing out water after inspection
FO / LO Tank : Cleaning of service
54 and storage tank for inspection with 20.00 Ton 544.50
consumable.(in engine room )
Labour for Servicing and Repairing
pressure testing of Valve from 101-
55 200-300 mm NB including 4.00 Each 2695.00
consumables and hardwares. Spares
cost like spindles, seat excluded.
Labour for Servicing and Repairing
pressure testing of Valve of 26-50
56 mm NB including consumables and 50.00 Each 1012.00
hardwares. Spares cost like spindles,
Labour for Servicing and Repairing
pressure testing of Valve from 51-75
57 mm NB including consumables and 50.00 Each 1416.80
hardwares. Spares cost like spindles,
Labour for Servicing and Repairing
pressure testing of Valve 76-100 mm
58 NB including consumables and 30.00 Each 1731.40
hardwares. Spares cost like spindles,
Labour for Servicing and Repairing
Pressure testing of Fire Hydrant
59 Valve including consumables and 4.00 Each 1126.40
hardwares. Spares cost like spindles,
Labour for Servicing and Repairing,
Pressure testing of OBD/Storm Valve
60 of 26-50 mm NB including 4.00 Each 892.10
consumables and hardwares. Spares
cost like spindles, seat excluded.
Labour for Servicing and Repairing,
Pressure testing of OBD/Storm Valve
61 from 51-75 mm NB including 6.00 Each 1150.60
consumables and hardwares. Spares
cost like spindles, seat excluded.
Labour for Servicing and Repairing,
Pressure testing of OBD/Storm Valve
62 of 76-100 mm NB including 4.00 Each 1321.10
consumables and hardwares. Spares
cost like spindles, seat excluded.
Labour for Servicing and Repairing,
Pressure testing of OBD/Storm Valve
63 of 101-150 mm NB including 2.00 Each 1871.10
consumables and hardwares. Spares
cost like spindles, seat excluded.
Break liner renewal with material
64 and labour in all respect size 3/8 X 6" 2.00 Each 10802.00
Propeller blades (3/4-bladed) to be
65 cleaned and polished by buffing 2.00 13247.30
including Consumables.
Removal and refitting of wiring and
66 other out fittings/fittings with 100.00 Sq.Metre 684.20
piping/valves coming in way of steel
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
repairs or any other job with
minimum demage with labour and
consumables etc. min 3 sq mtr
U PVC pipe 20 mm dia (10 kg/sq cm)
U PVC pipe 25 mm dia (10 kg/sq cm)
Name/Number fabrication as per
class requirements with labour and
material in all respect as under:
Name /Number fabrication as per
class requirements with labour and
material in all respect as under: P & S 34.00 Letter 1031.80
= GMB I=4 X 2=08 letter
P & S = जीएमबी I=5X2=10 letter M
7512 = 5 X 2=10 letter Aft side =
MUMBAI = 06 letter
Load line Fabrication as per class
70 requirements with labour and 2.00 Each 2825.90
material in all respect
Removing & refitting old wooden
panelling by labor & consumables
complte in all respect item requires if
required during renewal of plate
71 work or any other purpose during 200.00 Sq.feet 127.60
repairing including all types of
hardware, adhesive material, tools,
stackles, labor, carpentor etc. panel
wooden patti, batnes etc.
Repairs to railing on castle deck,
wheel house deck, monkey deck and
ladder i.e. renewal of pipes and
support if required including
replacing of horizontal railing pipes
with material and labor, cutting,
72 welding etc. but excluding renewal of
vertical flat bar support and brackets,
if required to renewal of vertical flat
bar support and brackets and other
steel work during repairs of railing
shall be paid weight basis as per item
(A) 40 mm dia pipe C-class GI
(B) 25 mm dia pipe C-class GI
Providing & laying polished
granamite vitrified tiles at gally
(Kitchen). WC, WC walkway,
bathroom and other places of
required size as per location or size
600 x 600 mm and 8 to 10 mm thick
of approved make and colour having
homogenious materials in flooring
laid on 20 mm thick average cement
mortar 1:3 (1 cement , 3 coarse sand)
and pointed with white cement
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
Dismantling & Removal of floor tiles
& wall tiles and WC (Indian &
Western), washbasin, sinks, pipe
lines of gally (Kitchen). WC, WC
walkway, bathroom and other places
for to renwal of tiles, washbasin, WC,
74 30.00 Sq.Metre 41.80
toilet & bath Pipe line & Dismantling
tiled or stone floors laid in mortar
including stacking of serviceble
materials and disposal of
unserviceble materials with all lead
Renewal of 19mm thick of wooden
sheet/B-15 aneling work after
removing old one with labour and
material complete in all respect
Renewal of 9 mm thick of wooden
sheet/B-15 aneling work after
removing old one with labour and
material complete in all respect
Renewal of 12 mm thick of wooden
sheet/B-15 aneling work after
removing old one with labour and
material complete in all respect
Renewal of steel fenders with MS
Pipe (Ship store Quality) of 200 mm
dia with material and labour all
Providing and supplying of HKF
X 304 mm or HKF size up to 300 to
79 500 mm any size key-hole rubber 5.00 Metre 26785.00
fender as per actual height as fitted in
arious shapes or as per existing
Removal & refitting & readjustment
of various types of HKF and D-Fender
as per existing at aft , ford, P & S side
etc. including flat bar of size 100 to
160 mm with 16 mm thick, round bar
25 m to 28 mm dia including all types
cutting, fitting, scafolding , all types of
labours, tools, all types of man power,
80 all types of drilling, maching, cutting, 20.00 R.Metre 5679.30
grinding, finishing etc. including all
process with steel material flat bar
round bar , bolts, nuts, washers,
hardwere etc. but excluding rubber
fender material,Old existing usable
fender shall be used first and then
after new required quantiry to be
managed from new supply
Providing and supplying of HDF
X 200 mm X 2000 mm long DO type
81 rubber fender or length as per actual 5.00 Metre 9790.00
as fitted in various shapes or as per
existing for P & S side
GI sheet metal work for air duct cowl
ventileter, air vent on main deck , any
other sheet metal work it includes
remving old deterioreted and
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
manufacururing and fitting new one
with material and labor in all respect
Pitted portion on ship's, hull, deck,
kort nozzle, rudder etc. to be built up
with welding rod with material and
Renewal of GI wire mesh up to 150 to
300 mm dia of ventileter by removing
84 old one with all necessary harware 10.00 Each 1488.30
consumable with steel materials, wire
mesh etc. complte in all respect
Painting to different names for
indication and identification at
85 different placed including marking, 10.00 Nos. 468.60
surface preparation with paint and
Eye pad renewal after removing old
86 one on ship hulls with all necessary 20.00 Each 506.00
material and labor
Providing & fitting twin post bollard
having 200 mm dia x 0.4 mtr to
mtr height from 10 mm thick plate
87 including MS base plate ,bracket, top 1.00 Job 33048.40
plate , with round bar fitted complete
in all respect with labour and
material (185 kg/Nos.)
Complete overhauling of Quick shut-
off valve upto 5 Mtr long wire
including labour and consumables,
88 complete in all respect 6.00 Nos. 6408.60
Supplying and fitting of insulation
material-glass wool of assorted size
Providing & fitting white glazed
mm thick tiles in bath and lavatory
with 10 mm thick cementing plaster
& jointswith white cementry
Remove & Re-fitting Blower
housing,blower motors,fans etc. with
all necessary consumables,packing
Servicing of Blower fan with
necessary adjustment, minor or
repairing/wiring etc. with
Air Receiver drain valve opening and
draining condensed water,
dismantaling connected pipelines
,valves, replacing Oring, packing,
copper gaskets, etc. with all
consumables and labour
Windlass/Capstan:Removal and re-
fitting with all consumables, crane
hire charges,with all material and
labour 501-750 kgs.
Providing & fitting single post bollard
94 having 200mm dia x 1.5m height 2.00 Nos. 29296.30
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
from 10mm thick plate, including MS
base plate, bracket, top plate with
round bar fitted complete in all
respect with labour and material
Sounding pipe clearing of blocked
95 pipe with all labour and consumables 8.00 Nos. 295.90
Sounding pipe plug renewal - brass
material after removal of old one
with labour and material in all
respect up to 50 mm
Total of Part B Rs
Total of part A +part B
I/We am/are willing to carry out the work at__________________________ above/ below than the amount
put to tender total amount of my/our tender work out as under.
put to tender total amount of my/our tender work out as under.
Estimated Amount put to tender : Estimated Amount put to tender:
Add._________% above Rs.___________ Deduct__________% below Rs._________
Total Rs.____________ Total Rs.___________
Executive Engineer (M),
GMB, PIU-Porbandar
TENDER DOCUMENT FOR THE WORK OF "INTERMEDIATE DOCKING SURVEY OF THE TUG GMB - I OF OKHA PORT".
CHAPTER-9: ITEM TECHNICAL SPECIFICATIONS:-
(Technical Specifications of Items to be executed part of Section-5)
PART- A ADMINITRATIVE - Dry Dock Rent.
Item No.1: Dry Docking rents Charges include following:-
Tug should be dock at Kandla Steel floating dry dock or proposed dry dock in Gujarat Only.
Items including docking & undocking charges, docking charges of the vessel as per docking plan at Kandla steel
floating dock only. It also includes providing of tug/boat/pilotage for assistance during docking & undocking. It
also includes all the expense of rent/hire of dock and assist tug/boat/pilotage etc. other related expense in all
respect. Dry dock Hire charges includes, Dry- dock rent/hire charges, Crane Charges, Block shifting charges,
Toilet out let connection charges, Fire services charges, Supply of fresh water during floating and docking
condition as per actual requirement.
Marine dues such as port dues, pilotage Charges, shifting pilotage charges, anchorage to dry dock, stream dues, and
inner anchorage.
All other charges Customs/ Port dues and expenditure such as Port/Signal/Flotilla department charges, customs
dues and its related expenditure, dry-dock cleaning charges. Mechanical department charges. All other related
works and service for Dry-dock shall have to arrange by the contractor including liasioning.
Electric power charges for tug usage during docking and during berthing at Jetty before waiting to dock and after
dock for floating repairs till completion of work i.e. from arrival at Kandla to till sail from Kandla to GMB Port
Bunkering of fuel ,oil , provision store, spares, engineers visit, survey visit, technician visit , vehicles, including all
permits & arrangement charges excluding material cost of fuel, oil, provision store, spares or any material which
will requires to on board other than repairing schedule.
Contractor shall have to arrange port agent for dry dock & all other formalities for port clearance , port permission,
custom permission and all other statutory permission which will in all respect to carrying out the docking
undocking, surveying, repairing, berthing, un berthing, anchorage etc. in all respect.
Agency shall have to make arrangement of port entry permit of vessel staff / GMB Officers & staff / Technician /
Vehicle / IRS surveyor / UT Gauging team / Service Engineer and shall have to provide vehicle for Gandhidham
to Kandla for any goods providing to tug including provision store and any kind of goods / spares required to
provide on board.
Agency shall have to provide vehicle for IRS from Gandhidham to Kandla and liasion with IRS for every visit
during execution and agency shall have to arrange certification from IRS class of vessel from IRS Agency shall
have to make all type of arrangement required for any testing recommended by IRS & EIC including tank testing
and any kind of required testing.
The contractor shall have to follow all the rules and regulations of offered dry-dock and relevant Port authorities.
Docking period for estimated work shall be consider 30 days and payment shall be made per day basis, however
bidders shall complete the entire work before schedule days it will be appreciates the bidders, In case of
excess/extra work the additional dry dock charge shall be on pro rata basis for the work required to be executed in
dry dock. No extra payment shall be made for higher charges for the item mentioned in Schedule-B. Payment
shall be made on per day basis. Other than docking work as per schedule plan as per estimates excepts extra
/excess work shall be completed on near birth at KPT as per item no
Bidder shall noted that Draft of vessel is 4.5 Mtrs and 0.5 mtrs clearance hence Channel draft and in the dry dock
and at seal level shall me minimum 5 mtrs and above.
It shall be GMB‟s responsibility for voyage of tug from respective port to Kandla anchor point and beyond which
it shall be bidder‟s sole responsibility for further carrying out the voyage of tug to Steel floating dock and safety
docking the tug and after repairing, voyage of tug from dock to the anchor point. The bidder has to ensure smooth
navigation of tugs upto proposed dock by all means including carrying out analysis and assuring of sufficient water
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender document for the work of intermidiate dokcing survey tug GMB i of okha port.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .