Loading…
Loading…
Tender Value
₹34.1 L
EMD Value
₹68,900
Closing Date
9 Jul 2026, 3:00 pmDue tomorrow
MUNICIPAL COMMISSIONER (MOTIHARI)
MCO
MEENA BAZAR MOTIHARI
MUNICIPAL COMMISSIONER (MOTIHARI)
MCO
PCC construction work from Nathuni Ram's house to Vinod Das's house in Ward No. 06 under Motihari Municipal Corporation area.
134280
NIT-13/2026-27-NNM-GR-05
Open Tender
CIVIL
Purbi Champaran
• PAN NO
• GST NO
• REGISTRATION NO
• AFFIDAVITE
• TOOLS & PLANT
• CHARACTER CERTIFICATE
• ITR LAST 3 YEARS DETAILS
• TURN OVER
CIVIL
PERCENTAGE
L1
1
12 documents required · 12 mandatory
₹5,000
Processing Fee: 590
₹68,900
MEENA BAZAR MOTIHARI
20 Jun 2026
20 Jun 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
3 Jul 2026
Bill of Quantity
Name of Scheme:- नगर निगम मोतिहारी के वार्ड सं०- 06 मे नथुनी राम के घर से लेकर विनोद दास के घर तक पी०सी०सी०सड़क का निर्माण कार्य |
Estimated Cost:- Rs. 3406548
E/M to be Deposited:- Rs.
Cost of BOQ:- Rs.
Time of complition:-
Date of Tender:-
E-Tendaring Fee
Sl No. SOR Item of Works Unit Quantity Rate Amount
1 BCD 2.25(A) Providing E/W filling in Road side Embankment including dressing of sides and ramming of bottoms with all comp. job and direction of E/I. m3 143.57 411.70 59107.77
2 BCD/ 2.28 Supply and filling inplinth with local sand under floor including watering ramming can soil dating and dressing comp. m3 0.00 287.30 0.00
3 BCD 11.73 Providing designation 100-A Brick flat Soling filled with local sand including all comp. job as per building specification and direction of E/I. m2 471.19 283.30 133488.13
4 BCD 16.42 Cement conctre 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size ) in pavements , laid to required slone and camber in panels as required including consolidation finishing and tamping complete. m3 358.92 4649.00 1668619.08
Add Carriage cost of materials:
5 Add carriage of bricks Nos 15196 919.21 13968.32
6 Add. carriage of local sand m3 7.07 310.47 2195.02
7 Add. carriage of sone sand m3 161.46 2941.19 474884.54
8 Add. carriage of i stone chips m3 322.92 2547.88 822761.41
Add Extra cost of materials:
9 Extra cost of bricks. Nos 15196 359.04 5455.97
10 Extra cost of Cement. MT 80.73 231.56 18693.84
11 Add for sign board & photograph. 0.00
Sub Total: 3199174.07
add extra gst 5.36% 171475.73
Add S. Fee cost of material:
add 18 % gst 5475.98
total (B) 35898.10
Grand Total: 3406548
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 13.pdf
NIT • 0.74 MB
Corrigendum.pdf
NIT • 0.14 MB
NIT 13.pdf
NIT • 0.74 MB
BOQ 05.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid