Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance N A | NA | NA | 121004 | -36.00% | ₹9.1 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 LAdmitted-Finance | -32.01% | ₹9.7 L | L2 | Admitted-Finance |
| 3 | L3₹10.3 LAdmitted-Finance | -27.68% | ₹10.3 L | L3 | Admitted-Finance |
| 4 | L4₹11.2 LAdmitted-Finance | -21.61% | ₹11.2 L | L4 | Admitted-Finance |
| 5 | L5₹14.2 LAdmitted-Finance | -1.00% | ₹14.2 L | L5 | Admitted-Finance |
Tender Value
₹14.3 L
EMD Value
₹28,600
Closing Date
22 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
PHED DISTT DIVISION I RATANADA JODHPUR
Operation and Maintenance of TW, Pump Machinery, Pipe lines at Sarno KD Bhopalgarh, Rajalani and Ram Nagar Sub Dn Bhopalgarh
2026_PHCJO_567018_1
NIT 31/2026-27
Open Tender
Civil Works
365 days
JODHPUR
AS PER TD
2 documents required · 2 mandatory
₹500
EE PHED DD I JODHPUR
₹28,600
Yes
24 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. | - | Each | - | - |
| 2 | 26.0 HP to 45.0 HP (30 HP - 1 Nos.) | - | Each | - | - |
| 3 | 16.0 HP to 25.0 HP (25 HP - 4 Nos. and 20 HP - 3 Nos.) | - | Each | - | - |
| 4 | 13.0 HP to 15.0 HP (15 HP - 1 Nos.) | - | Each | - | - |
| 5 | Running expenditure of pumphouses which includes complete operation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month.
(excluding repairing of pumping machinery etc.) | - | No. | - | - |
| 6 | Upto 100 HP (25 HP -1 No. and 17.5 HP - 1 No.) | - | No. | - | - |
| 7 | Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.
Jointing material shall be provided by the department.
Minimum labour for a following kms pipelines to be deployed. | - | No. | - | - |
| 8 | 1 km to 50 km - one fitter-II & one beldar | - | per km per month | - | - |
| 9 | Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) | - | Each | - | - |
| 10 | 80-300mm | - | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1008670.xls
BOQ • 0.29 MB
NIT31.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid