Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹7.2 L
Closing Date
8 Jul 2026, 1:00 pmDue today
S.E. B.S.C.C.C.-1, Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Strengthening of Pucca Structures and banks between Km. 10.000 to 14.800 of M.J.L.C.
2026_UPIDC_1164332_3
02/SE/2026-27
Open Tender
Civil Works
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹7.2 L
27 Jun 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
8 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation in ordinary soil for a lift upto 4.5m & lead upto 30m with didosal of excavated boulders as per direction of Engineer In Charge. | 2,824.52 | Cum. | - | - |
| 2 | Centering and shuttering for C.C. work including cost of all materials, labour all lead & lift,T&P etc. required for proper completion of work. | 1,354.49 | Sqm | - | - |
| 3 | Laying C.C. 1:3:6 with 1 cement :3 sand, 6 stone ballast size 20 to 40 mm including all cost of material, labour all lead & lift,T&P etc. required for proper completion of work. | 854.63 | Cum. | - | - |
| 4 | C.R. stone (Khanda) masonary with 1:3 cement, coarse sand mortor including cost of all material, labour all lead & lift,T&P etc. required for proper completion of work. | 3,803.68 | Cum. | - | - |
| 5 | Providing and fixing PVC Pipe in drainage spout & weep hole including cost of all materials, labours, all lead & lift,T&P etc, required for proper completion of work. | 3,234.98 | R.M | - | - |
| 6 | Deep Struck Cement pointing in 1:2 CM in stone masonry including cost of all materials, labour, all lead & lift, T&P etc required for proper completion of work. | 4,434.73 | Sqm | - | - |
| 7 | Providing and laying filter media 600 mm thick in back filling with stone ballast 20 to 40 mm size , stone grit 4.75 to 20 mm size and Course sand including cost of material, labour, all lead & lift, T&P etc required for proper completion of work. | 1,528.8 | Cum. | - | - |
| 8 | Earthwork in filling with all lead & lift including cost of all material, labour, T&P etc. with proper completion of work. | 15,250.92 | Cum. | - | - |
| 9 | Laying C.C. 1:2:4 in coping with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size including all cost of material, labour all lead & lift,T&P etc. required for proper completion of work.. | 136.27 | Cum. | - | - |
| 10 | Supplying And Laying HDPE textured Honeycombed Geocell of Size 150x356x1.50 mm having polymer density b/w.935-.965 g/cm3) & complying the standards specified by IS 17483 (Part-2):2020 | 18,907 | Sqmt | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tender_Document_Lot_3.pdf
Tender Documents • 2.80 MB
BOQ_2183140.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid