Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC AT PO TALSARA DIST SUNDARGARH | TALSARA | SUNDARGARH | ₹20.9 L | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical AT SURGUDA DIST SUNDARGARH | SUNDARGARH | ODISHA | - | - | Rejected-Technical Rejected |
Tender Value
₹20.9 L
EMD Value
₹20,876
Closing Date
20 Jul 2026, 6:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, SUNDARGARH
Construction of Video Conference Hall (OSWAN) in premises of Tahasil Office, Lefripada_Building
2026_CERWI_135559_1
Online-SESNG-05 of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Sundargarh
2 documents required · 2 mandatory
₹6,000
₹20,876
Yes
19 Sept 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
13 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C. | 53.22 | cum | 282.9 | ₹15,055.94 |
| 2 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 40.23 | cum | 870.2 | ₹35,008.15 |
| 3 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 12.17 | cum | 6,134.7 | ₹74,659.3 |
| 4 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. | 10.19 | cum | 6,572.1 | ₹66,969.7 |
| 5 | Plinth Beam: | 3.18 | cum | 7,446.5 | ₹23,679.87 |
| 6 | Column & Beam in Superstructure:-Ground Floor | 3.55 | cum | 18,394.3 | ₹65,299.76 |
| 7 | 1st Floor | 0.88 | cum | 20,958.5 | ₹18,443.48 |
| 8 | Lintel Band:-Ground Floor | 1.39 | cum | 14,285.7 | ₹19,857.12 |
| 9 | 1st Floor | 0.08 | cum | 16,028.2 | ₹1,282.26 |
| 10 | Wall beam:Ground Floor | 2.59 | cum | 18,394.3 | ₹47,641.24 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 1.56 MB
Tendernotice_2.pdf
PDF • 7.00 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_601184.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .