Tender Value
₹14.4 Cr
EMD Value
₹24.4 L
Closing Date
20 Jun 2026, 3:00 pm
Sector Engineer SHQ SML ITBP Taradevi camp Shimla
Second In Command Engr SHQ Shimla ITBP Taradevi camp Shimla HP Pin 171010 Phone 0177 2777600 and 2777618
Construction of Flood Protection wall at 2nd Bn ITBP Kullu Distt Kullu Himachal Pradesh
2026_ITBP_910868_1
ITBP/SHQ(SML)/ENGR/2nd Bn/222/2026-27-3210-39 Dtd 29-05-2026
Open Tender
Civil Works - Others
180 days
Babli Camp of 2nd BN ITBP Kullu
AS per NIT and tender form
3 documents required · 3 mandatory
₹0
₹24.4 L
SHQ SML Shimla ITBP TaraDevi
30 May 2026
30 May 2026
22 Jun 2026
30 May 2026
20 Jun 2026
30 May 2026
30 May 2026 - 19 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineerin-charge. All kinds of soil | 9,572.86 | cum | 228.35 | ₹21,85,962.58 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Ordinary rock | 6,381.91 | cum | 386.75 | ₹24,68,203.69 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 1,765.6 | cum | 339.1 | ₹5,98,714.96 |
| 4 | Extra rates for quantities of works, executed:In or under water and/or liquid mud, including pumping out water as required Note:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in difficult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. | 9,149.4 | Metre depth | 1 | ₹9,148.49 |
| 5 | Open timbering over areas including strutting, shoring etc. complete. (Measurements to be taken of the face area timbered):Depth exceeding 3 m but not exceeding 4.5 m | 1,989 | sqm | 74.4 | ₹1,47,981.6 |
| 6 | Extra for planking and strutting in open timbering if required to be left permanently in position. (Face area of the timber permanently left to be measured). | 1,657.5 | sqm | 1,307.75 | ₹21,67,595.63 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 219.45 | cum | 6,583 | ₹14,44,639.35 |
| 8 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1,546.93 | cum | 8,902 | ₹1,37,70,770.86 |
| 9 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Nte: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M30 grade with minimum cement content of 350 kg /cum | 3,659.7 | cum | 10,277 | ₹3,76,10,736.9 |
| 10 | Add for using extra cement in the items of design mix over and above the specified cement content therein. | 1,280.9 | quintal | 1,245.85 | ₹15,95,809.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tendernotice_2.pdf
PDF • 0.99 MB
BOQ_957306.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid