| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAdmitted-Finance | ₹8.1 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Gautam Construction L1 |
|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. | 696.71 | Cum | 205 ₹1.4 L |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 165.45 | Cum | 145 ₹23,990.25 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 60.1 | Cum | 160 ₹9,616 |
| 4.00 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 83.76 | Sqm | 255 ₹21,358.80 |
| 5.00 | Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete. | 8.53 | Cum | 1,750 ₹14,927.50 |
| 6.00 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 21.32 | Cum | 570 ₹12,152.40 |
| 7.00 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | 9,108.57 | Sqm | 130 ₹11.8 L |
| 8.00 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | 4,118.67 | sqm | 15 ₹61,780.05 |
| 9.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) | 521.93 | Cum | 1,225 ₹6.4 L |
| 10.00 | Demolishing RCC work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 44.14 | Cum | 2,900 ₹1.3 L |
Tender Value
₹8.2 Cr
EMD Value
₹16.4 L
Closing Date
4 May 2026, 5:00 pmClosed
General Manager
Office of Chief General Manager, Construction Wing, Uttarakhand Peyjal Nigam, Kamla Nagar(Opp. ONGC Hospital), Dehradun
SITE BEAUTIFICATION AND FACADE ENHANCEMENT ALONG MALL ROAD AT NEW TEHRI,TEHRI GARHWAL, UTTARAKHAND
2026_MDPEY_92191_2
722/Nivida(Garh)Chamba/22 Dt 18/02/2026
Open Tender
Civil Works
365 days
MALL ROAD AT NEW TEHRI
Please refer tender document
3 documents required · 3 mandatory
₹11,800
PM,Const.Unit, UKPJN, Chamba
₹16.4 L
Dehradun
15 May 2026
13 Apr 2026
5 May 2026
13 Apr 2026
4 May 2026
21 Apr 2026
14 Apr 2026 - 18 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil. | - | Cum | - | - | itemcode1 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | Cum | - | - | itemcode2 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | - | - | itemcode3 |
| 4 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 83.76 | Sqm | - | - | itemcode4 |
| 5 | Supplying and filling in plinth with Jamuna sand under floors including, watering, ramming consolidating and dressing complete. | 8.53 | Cum | - | - | itemcode5 |
| 6 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 21.32 | Cum | - | - | itemcode6 |
| 7 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) | - | Sqm | - | - | itemcode7 |
| 8 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | - | sqm | - | - | itemcode8 |
| 9 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) | - | Cum | - | - | itemcode9 |
| 10 | Demolishing RCC work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | - | Cum | - | - | itemcode10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_111455.xls
BOQ • 0.49 MB
1359.pdf
Other Document • 0.38 MB
Tendoc_MallRoad.pdf
Tender Documents • 3.30 MB