Loading…
Loading…
Tender Value
₹16.4 L
EMD Value
₹32,800
Closing Date
22 May 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
SRDEE TRD
14 conditions · 2 needing a document upload
All the tenderers/Contractors have to deposit full earnest money and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards . All documents related to Partnership deed/Joint venture/ Consortium/ MOU, duly signed by the notary public, should be uploaded failing which offer will be summarily rejected.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions of contract , General Instructions and conditions , explanatory notes of schedule of work and Annexures.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
Manual submission of EMD and cost of tender form cannot be entertained/Considered and hence no need of uploading the scanned copy of financial instruments
Whether GST registration available or not?
The contractor has to submit the EPF Code as per the EPFO Act and also has to submit a statement in this regard before signing the contract agreement.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GST-ACT-2017: The Tendered work/service is subject to the provisions of GST Act and Rules applicable from time to time.
Tenderers are advised to refer the latest revision in Wages,PF,ESI,Bonus etc., as available in official website of Ministry of Labour, Govt. of India, before quoting the rates.
OHE modification in connection with the work "Ernakulam-Kottayam section: Proposed reconstruction of existing 25 bridges (RCC pipe culverts) with RCC box"
V_TRD_OT_01_2026-27Item6
V_TRD_OT_01_2026-27Item6
Open
Works - General
180 Days
Thiruvananthapuram, Kerala
₹0
₹32,800
22 May 2026
29 Apr 2026
8 May 2026
30 items across 3 schedules · ₹3,60,687.84 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | SOR Item no.3(b)(i)-Erection of fabricated steel work other than masts by manual | MT | 1.26 | 4,367 | 5,502.42 |
| 2 | SOR Item no.32/3(b)(i)-Erection of fabricated steel work other than masts by manual-Work under power block | MT | 1.26 | 4,367 | 5,502.42 |
| 3 | SOR Item no.3(c)-Erection fabricated steel work(SPS). | MT | 0.72 | 3,636 | 2,617.92 |
| 4 | SOR Item no.32/3(c)-Erection of fabricated steel work(SPS)-Work under power block. | MT | 0.72 | 3,636 | 2,617.92 |
| Schedule total | ₹16,240.68 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril2022.pdf
ATTACHMENT
GCCApril2022Correctionslip1.pdf GCC correction slip1
ATTACHMENT
GCCACSno11.pdf
ATTACHMENT
GCCcorrectionslipNo.10.pdf
ATTACHMENT
GCC_April_2022_ACS-7.pdf
ATTACHMENT
jpo.pdf
ATTACHMENT
BGformat_1.pdf
ATTACHMENT
GCC_Apr_2022_ACS-8_20-12-24.pdf
ATTACHMENT
GCC_Apr_2022_ACS-9_9-1-25.pdf
ATTACHMENT
GCCApril2022Correctionslip1.pdf
ATTACHMENT
GCC2022correctionslipNo.2.pdf
ATTACHMENT
GCC2022AprilCorrectionslip3.pdf
ATTACHMENT
GCC_April-2022_Correctionslip4.pdf
ATTACHMENT
GCC2022correctionslipNo.5.pdf
ATTACHMENT
GCC_April-2022_Correctionslip6.pdf
ATTACHMENT
TenderDocumentPVRD.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .