CE(Procurement)
Block no. 3 Shakti Bhawan MPPTCL Rampur Jabalpur
Snap bidding for Repair of 03 Nos. 132kV 40MVA Power Transformers against TR-15/2024
2024_MPPTC_377871_1
TR-15/2024 (Snap)
Limited
Miscellaneous Services
Item Wise
370 days
Anywhere in MP
As per tender specification
2 documents required · 2 mandatory
₹100
Exempted
30 Oct 2024
22 Oct 2024
29 Oct 2024
22 Oct 2024
28 Oct 2024
22 Oct 2024
Fixed Charges for 132/33kV 40 MVA Transformers
Dismantling of Transformer’s including core. -Cleaning of all healthy parts , including coils, laminations, tap changer radiator tubes, conservator, breather etc. Rebuilding of core laminations. -Re-assembly of core and winding with new ones including brazing, soldering and insulating. -Vacuum drying/vapour phase drying. -Re-assembly of complete Transformer including accessories. -Changing of all gaskets and making terminal connections including all accessories of transformer. -Oil filling and filtration.
Internal painting of transformer
External spray painting of transformer.
Labour charges for overhauling of OLTC.
Cost of providing new insulation for leads (phase and neutral), tap leads, inter winding connections and inter coil connections. Filling of nitrogen gas for transportation & storage.
Cost of all tests as per clause 8.4 , Section II, after repairs of transformer including heat run test & pressure test.
Total(Sum of 1.01 to 1.06) for 40MVA Transformer to be entered by the bidder
TRANSPORTATION CHARGES : To & fro transportation charges including loading & unloading and requisite dragging applicable on average basis from and to anywhere in MP
Mandatory Spares of 40 MVA Transformers
Silica Gel Breather for Main Tank 5Kg
Silica Gel Breather for OLTC 1Kg
Buchholz Relay
Oil Surge Relay
Magnetic Oil Level Gauge Meter with Float and float arm complete
Pressure Relief Valve
Oil Temperature Indicator with sensor bulb and flexible capillary tube
Winding Temperature Indicator with sensor bulb and flexible capillary tube
24' Cooling Fan
Description of Work / Item(s)
For 40 MVA Transformer
Cost of new copper coil with paper covering insulation only of all the limbs of power transformers i.e HV, & LV side of transformers.
Cost of lamination that may be required to be replaced. (Approx wt 40MVA - 5000Kg)
Scrap salvage value of HV & LV copper with paper covering insulation, which will be retained by Bidder .
Scrap salvage value of laminations which will be retained by Bidder .
Description of Work / Item(s)
Repairing of OLTC
Cost of Major repair work including replacement of defective parts
Cost of Minor repair work including replacement of defective parts.
Cost of following parts of OLTC indicating freight charges, rate of taxes and duties etc for 220 KV Power Transformers
Transition Resistance
Main moving contact assembly.
Fixed contact assembly
Half assembly right
Half assembly left
Oil seal of OLTC.
Gasket for top & bottom cover
Cost of new OLTC for 132/33KV, 40 MVA Power Transformer (three phase unit)
Prices of Accessories
145KV, 1250A OIP Condenser Bushing.
72.5 KV, 1250A OIP Condenser Bushing.
Raditor
Pressure relief device
Main conservator for 40MVA Transformer
Pronal make air cell for 40MVA Transformer
Charges towards conducting following tests on repaired 132kV transformer already included in A(6) of Schedule-I (Part-A)
Heat Run Test
Pressure Test on Tank
Additional charges towards conducting impulse tests as per CL8.4.2 of Section II , on repaired 132kV transformer to be paid if required to be carried out .
SET ON SITE ELECTRICALS PVT LTD (BID ID -1127149)
SET ON SITE ELECTRICALS PVT LTD (BID ID -1127149)
SET ON SITE ELECTRICALS PVT LTD (BID ID -1127149)
Cost of new copper coil with paper covering insulation only of all the limbs of power transformers i.e HV, & LV side of transformers.
Cost of Major repair work including replacement of defective parts
Cost of new copper coil with paper covering insulation only of all the limbs of power transformers i.e HV, & LV side of transformers.
Heat Run Test
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .