| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹89.8 L+₹9.5 L (11.8%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹85.4 L
EMD Value
₹1.9 L
Closing Date
16 Aug 2019, 3:00 pmClosed
Superintending Engineer
Construction Circle, Uttarakhand Peyjal Nigam, Nainital
Construction of Intank works and supply carting laying jointing of GI m pipe for supply main RCC CWR GI m pipe distribution system works and other appurtenant works under Jalna Bhagoti water supply scheme
2019_MDPEY_19312_1
2136/613/312 Dated 26-07-2019
Open Tender
Pipe Laying Works
Item Rate
365 days
Kotabagh (Ramnagar)
Please refer tender documents
3 documents required · 3 mandatory
₹5,900
Executive Engineer CD UPJN Ramnagar
₹1.9 L
Ramnagar
24 Jul 2025
29 Jul 2019
19 Aug 2019
30 Jul 2019
16 Aug 2019
6 Aug 2019
5 Aug 2019
Amount
Excavation of earth for pipe line in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60m from trenches including supply of labour, T&P etc complete.
Excavation in single mixed with boulders etc for pipe line trench.
Supply of all materials Providing Cartage of following sizes G.I.(M) pipes, specials & fittings, lowering them into trenches, laying true to the alignment & gradient, laying & jointing pipe line including cutting & threading of pipe for making up length as required.Complete in all respect G.I.(M) Pipe as per IS: 1239/1985 Part-1
20 mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
Supply and fixing of the following size valves in pipeline including cuting, threading of pipeline with fittings, materials, labours, T&P etc complete. As per IS: 788/1971
20 mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
Construction of Gate Valve Chamber including supply of materials, labours, T&P etc required for proper completion of work as according to deptt type design.
Supply of all materials, labours, T&P etc and construct of Double Intake Chamber (.60X.60m) as per type design & drawing. Complete in all respect
Supply of all Materials , Labours ,T&P etc. and Construction of RCC Reservoir of 10.0Kl capacities supply and fixing of outlet, inlet, overflow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body, vertical pipe, ladder M.S M.H. cover , ventilator column etc. Complete with approved water proofing ( apex)/ enamal paint, testing, filling water for testing purpose etc.
Supply of Bucket type Chlorinator of 25 Lit capacity and instalation of it,on CWR top with all materials and e.t.c. complete
Construction of PTSP including supply of materials, labours, T&P etc required for proper completion of work as per deptt. type design..
Construction of R.R. stone masonry laid in 1:6 cement and sand including supply of materials, labours, T&P etc required for proper completion of work to protect the pipeline.
Supply of all materials, labour, T&P and laying Plain Cement concret in P.C.C. with 20mm gauge stone ballast, sand & cement in proportion of 1:2:4
Supply of all materials, labour, T&P and laying Plain Cement concret in P.C.C. with 40mm gauge stone ballast, sand & cement in proportion of 1:4:8
M/s Trilok Rawat
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .