Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC KHUSHMARA KAKRABAN UDAIPUR GOMATI DISTRICT PIN 799105 | UDAIPUR | GOMATI | TRIPURA | 799105 | ₹10.0 L Quoted ₹10.3 L | L1 | Accepted-AOC Being a 1st lowest |
Tender Value
₹9.7 L
EMD Value
₹19,410
Closing Date
18 May 2026, 3:00 pmClosed
Executive Engineer
O/o the Executive Engineer DWS Division Udaipur
FDR/Periodcl mtc DTW Schm undr KBN RD Blck/ SH- mtc Pump house in/c. mtc pipeline and others allied works complete under DWS SD, KBN during yr 2026-27. (KBN sector)
2026_CEDWS_72750_1
10/EE/DWS/DIVN/UDP/2026-27
Open Tender
Civil Works - Water Works
365 days
Kakraban
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹19,410
29 Jun 2026
11 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. - All kinds of soil | 12 | Cum | 231.6 | ₹2,779.2 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. All kind of soil | 8 | Cum | 161.3 | ₹1,290.4 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 3 | Cum | 1,177.3 | ₹3,531.9 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - i) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 6.8 | Cum | 8,980 | ₹61,064 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level:
i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 2.2 | Cum | 11,080.4 | ₹24,376.88 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for- cement concrete
i) Foundations, footings, bases for columns. | 14 | Sqm | 333.9 | ₹4,674.6 |
| 6.01 | iv) Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 12 | Sqm | 391 | ₹4,692 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. i) Thermo-Mechanically Treated bars of grade Fe-500D or more | 90 | Kg | 103.9 | ₹9,351 |
| 8 | First class brick work in foundation and plinth including cost of all materials as required complete:- i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 8.2 | Cum | 9,845.2 | ₹80,730.64 |
| 9 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 36 | Sqm | 1,533.5 | ₹55,206 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74033.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_74033.xls
BOQ • 0.41 MB
DNIeT_10_FDR_Mtc_PumpHouse_Pipeline_KBN_Sector_SD_KBN.pdf
Tender Documents • 3.43 MB
Download all tender documents and submit your bid