Loading…
Loading…
Tender ID
Tender Value
₹21.0 L
EMD Value
₹21,032
Closing Date
10 Mar 2026, 6:00 pmClosed
Executive Engineer, P.H. Works Division, GWSSB, Anand
Providing Supplying Lowering Laying and NP-2 class 1200 mm dia pipe. AT Bhuvel S HW side for Rain water Clearance of water in near by of Jantanagar area of Bhuvel village, under Bhal pradesh augmentation part - 2 pariyej pond based - years 2025-26
280079
01 of 2025-2026 (2nd Attempt)
Open
Civil Works - Water Works
Works
Anand
4 documents required · 0 mandatory · 4 optional
₹900
Executive Engineer, P H Works Division, GWSSB, Anand
₹21,032
24 Feb 2026
24 Feb 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
Estimated Cost : Rs. 21,03,243=26
Estimated Cost: 21,03,243=26
Volume-III-A, Preamble to Price Bid
Name of Project: - Bid documents for Providing Supplying Lowering Laying and NP-2 class
mm dia pipe. AT Bhuvel S HW side for Rain water Clearance of water in near by of Jantanagar area
of Bhuvel village, under Bhal pradesh augmentation part - 2 pariyej pond based - years 2025-26 "
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in
more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder
shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
separately for Schedule-C. The total shall be in line to the price quoted in Schedule-C.
The total shall be carried forward to Schedule-B for comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment shall be on
unit rate basis and unit variation in quantity will be paid with pro rata basis.
(9) Each item is to be individually priced online and the amounts shall be added up to
be left blank except where the item description requires the item to be priced on "as
applicable” basis. The item shall not be priced if it is “not applicable” to the bidder’s
design, in which case the bidder shall add the words “NOT APPLICABLE”. The wording
in the item description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
Volume-III-A, Preamble to Price Bid
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
the cost of execution of such items (according to the requirements of the bid document)
in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for by
the Employer when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets No extra payment shall be given for any item
which is required to complete and perform the project.
pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
will be considered for financial evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting
out that may be required to be carried out for laying out of all the works involved.
(14) Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to
be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional survey work,
or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at
his own cost. These accesses will be used by the other contractors working for
Volume-III-A, Preamble to Price Bid
prices shall include all the equipment’s / materials / accessories and services required
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, and Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour cess
which is non-refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(24) The rates quoted shall be exclusive of GST, but inclusive of all other taxes, duties
which shall not be paid extra. While GST will be paid for admissible part of actual work
done at the approved tender rates and tender conditions of price variations. GST shall
be paid as per prevailing rates at the time of payment. The TDS shall be deducted at
source as per provision of IT rules and GWSSB policy.
(25) The Bidders shall have to quote the rates in this tender keeping in view of the GST.
The Complete responsibility of taxes, duties, levies rests with the Contractor/Agency
(26) The process requires that the bidder shall quote his price for the work components
fix during the entire period of performance of the contract except price variation allowed
for supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No. 59, General Conditions
(27) Payment shall be made for the components for which lump sump prices are quoted, as
per the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
(28) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell
( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the work. The
contractor shall furnish the statement showing the quantity of quarried materials /
Volume-III-A, Preamble to Price Bid
minerals from whom purchased ( with full address of the seller) and copies of the bills
for purchase to the Executive Engineer of the in charge of the work. The contractor
shall also furnish such additional information as regards royalty payment to the
competent authority.
(29) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non-compliance entire responsibility shall be rest
with the agency and required amount shall be recovered from any due amount of the
(30) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(31) The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be
open for the Board to ask for original invoices, lorry receipt, weigh bridge slips,
payment details and such other documents as may be required for the purpose.
(32) The claim of contractor regarding GST shall have to be backed by documentary
evidence substantiating the actual payment of tax duly certified by the competent tax
authority. The final decision regarding the quantum of claim amount to be recovered or
reimbursed shall be of the competent authority of the GWSSB and shall be binding on
the contractor.
Signature of contractor Executive Engineer
Volume-III-A, Preamble to Price Bid
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Providing Supplying Lowering Laying and NP-2 class 1200 mm dia pipe. AT Bhuvel S HW
side for Rain water Clearance of water in near by of Jantanagar area of Bhuvel village, under
Bhal pradesh augmentation part - 2 pariyej pond based - years 2025-26 "
The bidder shall quote his firm and fixed price for the entire work under this Contract, defined in
more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda/Amendments to the above, for the execution of the above Contract, we the
undersigned offer to design, Engineer, procure, construct, complete, commission, operate and
maintain the whole of the said works for 5 years from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the drawings,
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
for Construction including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I/We agree that
a) If we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection and
testing of materials and workmanship.
b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative.
if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any action
including termination of Contract and impose at his absolute discretion any penalties, and/or
reject the work.
Volume-III-A, Preamble to Price Bid
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with the
Contract within _________ months, inclusive of monsoons, from the date or receipt of Letter of
Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of submission of the
bill and it shall remain binding upon us and may be accepted at any time before the expiry of
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement with
you incorporating the conditions of Contract there to annex but until such agreement is
prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in Appendix to
Bid and agree that they represent a fair estimate of the damages likely to be suffered by you in
the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III-A, Preamble to Price Bid
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey Contract
on EPC basis, the provision of measurement will be applicable only for the assessment of value
of work done for inclusion in any interim certificate for part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each item specified in Schedule B, based
on the Employer's best appreciation of the value of the component as related to the total costs of
the concerned item as whole. A head titled (any other item(s)) is included in each breakdown of
schedule and the tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in the
measurement books in the form and by the method approved by the Employer's Representative,
and signed jointly by both the parties.
Volume-III-A, Preamble to Price Bid
"Name Of Scheme: Bhalpradesh Augmantation RWSS of Anand district "
Name of work:- Providing Supplying Lowering Laying and NP-2 class 1200 mm dia pipe. AT Bhuvel
S HW side for Rain water Clearance of water in near by of Jantanagar area of Bhuvel village, under
Bhal pradesh augmentation part - 2 pariyej pond based - years 2025-26 "
Schedule showing the approximately the materials to be supplied to the contractor from government
stores for the work to be executed and the rate at which they are to be charged.
SCHEDULE – “ A ”
Sr. Particulars of the materials
Qty. Issue Rate Place of delivery
No materials will be charged
to the contractor
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by the
Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own cost
for loading, unloading, and transporting safety to the site of work the cement stipulated in
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in position
shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with the
dept. will be issued on request to the contractor. (for use in this contract only) at prevailing
market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition, otherwise
recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Volume-III-A, Preamble to Price Bid
"Name Of Scheme: Bhalpradesh Augmantation to RWSS of Anand district "
Name of work:- Providing Supplying Lowering Laying and NP-2 class 1200 mm dia pipe. AT
Bhuvel S HW side for Rain water Clearance of water in near by of Jantanagar area of Bhuvel
village, under Bhal pradesh augmentation part - 2 pariyej pond based - years 2025-26 "
SCHEDULE OF PRICES
Sr. No. Particulars Amount Rs.
Providing Supplying Lowering Laying and NP-2 class
1200 mm dia pipe. AT Bhuvel S HW side for Rain water
Schedule - B Clearance of water in near by of Jantanagar area of 21,03,243=26
Bhuvel village, under Bhal pradesh augmentation part -
pariyej pond based - years 2025-26 "
Total Rs. 21,03,243=26
a) The bill of quantity (without price) shall be incorporated as above.
Volume-III-A, Preamble to Price Bid
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to be
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation,Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
Note:(1) Payment made for un-laid pipes brought on site shall be limit 25% of the Qty. of tender
(2) The security of un-laid pipes even after the payment done by GWSSB will solely be of
contractoronly.
(3) Moreover plastic pipe (PVC) shall be strictly protect under proper shed to prevent from
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
8 All Electro-mechanical works and Instrumentation
a. On supply of material at work site in good condition 65% of Quoted rate
b. On erection of Equipment 25% of Quoted rate
c. On completion of Testing & Commissioning of Equipment 5% of Quoted rate
d. Satisfactory running of system. 5% of Quoted rate
9 Valve chambers
A On completion works as per approved drawings 95% of Quoted rate
B After commission of system 5% of Quoted rate
10 Miscellaneous work
A All other items such as encasing, columns support for culvert, 80% of quoted rate on
pipe bridges for Canal /Drain/Khadi crossing, internal roads, completion of works
railway/highway crossing, Anchor/thrust blocks, encasing,
Volume-III-A, Preamble to Price Bid
steel bridge for pipe crossing, Construction of Compound Wall
& Repairing and Renovation work etc.
B On commissioning of the system 20% of quoted rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03 GST AND Price Variation Paripatra 2023.pdf
06 Minmum Wages GR.pdf
07 PURCHASE POLICY.pdf
08 tender clause ii 10 01 2018 Liquidated Damage.pdf
09 UNDERTAKING ON 300 STAMP.pdf
VOL 1 B GCC - PART-1.pdf
VOL 1 B GCC - PART-2.pdf
012 Volume III-A Preamble to Price Bid.pdf
013 Item wise Specification.pdf
014 Bhuvel Line work.pdf
015 DTP BHUVEL AC LINE.pdf
01 VOL 1 A Technical Bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .