Loading…
Loading…
Tender Value
₹81.1 Cr
EMD Value
₹81.1 L
Closing Date
18 Sept 2026, 6:00 pm
Executive Engineer , Ahmedabad Urban Development Authority, Ahmedabad
REMAININIG CONSTRUCTION OF AFFORDABLE HOUSING DEVELOPMENT (EWS-II) AND NEW CONSTRUCTION OF 62 SHOPS IN COMMERCIAL COMPLEX IN TPS NO. 4/A, F.P. NO. 31 AT SANAND IN AUDA AREA. (JOB NO.: 07/2026-27)
323067
07/2026-27
Open
Miscellaneous Works
Works
Ahmedabad
1 document required · 1 mandatory
₹18,000
Ahmedabad Urban Development Authority, Ahmedabad
₹81.1 L
18 Sept 2026
10 Jul 2026
23 Sept 2026
10 Jul 2026
18 Sept 2026
10 Jul 2026
Name of Work: REMAININIG CONSTRUCTION OF AFFORDABLE HOUSING DEVELOPMENT
(EWS-II) AND NEW CONSTRUCTION OF 62 SHOPS IN COMMERCIAL COMPLEX IN TPS NO.
4/A, F.P. NO. 31 AT SANAND IN AUDA AREA. (JOB NO. 07/2026-27)
Area Base Bid for Conventional Technology (R.C.C. Framed Structure type)
Sr carpet RATE Unit Amount
no Area/ (Rs.) (Rs.)
Remaining construction work for
EWS-ll Residential Flats, 01 Nos. of
Anganwadi in HP, 6 nos. of community
hall in HP, 22 Nos. of Shops in hollow
plinth level including, necessary
engineering survey and all constructing
activities like earth work, anti-termite
treatment in constructed or new
construction work. All residential wings (A
to U) to be completed whether it seems
part/part thereof RCC elements
incomplete at various floor level in RCC
frame structure. The same shall be either
to be completed with structural drawings
or to be strengthen with further testing
to achieve full responsibility of structural
stability with help of dismantling, cutting
of existing dowel bar/rebaring and
reconstruction of the same RCC element,
dismantling shall be treated with re- Rate
furbishing detail as per IS code/structure Per Sq. M.
consultant with authorized organization of Carpet
for validation to achieve required area
strength. It includes anti termite
treatment, finishing works like masonry
work, plastering, painting, flooring etc.,
doors, windows, grills, railings,
louvers/screens, hardscape in HP parking
and all internal amenities, Electrical works
which include Cabling, wiring, conduiting,
lighting, LT panels, earthing, lightning
protection etc., extra low voltage system,
FFTG (including 2 Years Maintenance with
approval), plumbing, drainage including
water proofing treatment, anti-termite
treatment, lift-elevators (including
Years Maintenance with approval),
signages, D.G. set for backup power,
overhead water tanks with allied area
with necessary capacity with all material,
installation & labour etc. as per minimum
required specifications stated in tender
Sr carpet RATE Unit Amount
no Area/ (Rs.) (Rs.)
documents with Planning and design
drawings provided by AUDA with tender
document including necessary shop
drawing approval from Architect and all
necessary hidden and unhidden items,
activities, all taxes, charges, royalties, etc.
complete as directed by Engineer in
charge. (G+7 floors).
Remaining work for completing 22 Nos. of
Shops, 1No. Anganwadi, 6No. Community
hall in Hollow Plinth Area as per drawing
& specification with all related
Engineering services. (excluding RCC
Structure work ) (Shops : 368 Sqm,
Community hall (pantry, wash area, gents
and ladies toilet block as per drawing for
each) : 352 Sqm , Anganwadi (pantry, Rate
wash area, gents and ladies toilet block Per Sq. M.
18-20 sqm for each) : 80 Sqm). of Carpet
It includes finishing work like, masonry, area
plaster, painting, flooring, doors &
windows, grills, rolling shutter, glass
partition and all internal electrification,
FFTG, water proofing and anti termite
treatment, etc. and all necessary hidden
and unhidden items, activities, all taxes,
charges, royalties, etc. complete as
directed by Engineer in charge.
Infrastructure work for external
development for entire premises,
approach road to plot, repairing/new
compound wall, compound gate, security
cabin within the plot including stone
pitching work outside compound wall,
etc. and Infrastructure works includes
extended to connect with main sewer
line, water supply line, storm water line
at Sanand. Internal road & parking (trimix
and paver), integrated water supply
3 16355 Per Sq.
network from UG tank to OH tank,
firefighting system supply from M.
bore/sump to OHT, required nos. of bore
well with pump set including standby
pump sets, UG domestic water tank
having total capacity 600 cum which
divides in nos. as per detailed drawing +
rain water tank 100 cum. with Pump
room as per detailed drawing of required
capacity with pump set including standby
pump sets for each block, PHE & FFTG
Sr carpet RATE Unit Amount
no Area/ (Rs.) (Rs.)
network system, providing & laying
underground cable for electricity supply
from outside to meter room inside the
campus, Rain water harvesting
(Percolation well as per drawing and
storm water drain, R.C.C. trimix roads
with kerbs and Paver block Parking,
Nos. trellis at COP entrance, compound
wall, Pump rooms, Street light
Transformers & transformer room plants,
HT Panel and HT cables, earthing, LT
Panels, DG sets and AMF panels, all kind
of horticulture like, lawn, plants, etc. and
signages etc. complete as per drawings
provided and min specification listed with
tender document all work and all
necessary hidden and unhidden items,
activities, all taxes, charges, royalties, etc.
complete as directed by Engineer in
Design, Engineering, Supply, Installation,
Testing & Commissioning of 210 KW Grid
connected Solar PV Power Plant for
remaining work of 756 EWS-ll Residential
Flats, 01 Nos. of Anganwadi, 22 Nos. of
Shops in hollow plinth level.
With standard length of wires consisting
of required no. of Solar PV
modules(300watt each), Power
Conditioning Unit (Inverter with all
accessories/ features), Junction Boxes,
PVC Pipes, Cables/Wires including
connectors/plugs/fuses, ACDB, Suitable
Lightening Arrestor/Earthlink, mounting
structures, government registration as Rate Per
required for net meter charges etc. and KW
accessories along with Tool kit and spares
for 1 year. The scope of work includes
suitable mounting along with all cables,
hardware, nuts, bolts etc. Scope also
includes providing and erecting of all
required interface panels and cabling for
connection to Building LT panels. It also
includes installation of solar pv modules
at terrace of building and connectivity to
single power outlet at ground floor of
particular building and all necessary
hidden and unhidden items, activities, all
taxes, charges, royalties, etc. complete as
directed by Engineer in charge.
Sr carpet RATE Unit Amount
no Area/ (Rs.) (Rs.)
New Construction Work for Commercial
building Block V & W (Shops/Offices)
Nos. G+2+Terrace Level including,
necessary engineering survey and all
constructing activities like excavation,
construction of all types of RCC structure,
finishing works like masonry work,
plastering, painting, flooring etc., doors,
windows, grills, railings, louvers/screens,
Paver block in HP parking and all internal
amenities, Electrical works which include
Cabling, wiring, conduiting, lighting, LT
panels, earthing, lightning protection etc.,
extra low voltage system, FFTG (including
2 Years Maintenance with approval), Rate
plumbing, pumping machineries, with 2847 Per Sq. M.
stand by arrangements & Pump room, Sq.mt of Carpet
including water proofing treatment, anti- area
termite treatment, lift-elevators
(including 2 Years Maintenance with
approval), signages, D.G. set for backup
power, overhead water tanks, civil work
for all U.G. Sump/Tanks with allied area
having necessary capacity with all
material, installation & labour etc. as per
minimum required specifications stated
in tender documents with Planning and
design drawings provided by AUDA, with
tender document including all necessary
hidden and unhidden items, All taxes,
charges, royalties, etc. complete as
directed by Engineer in charge.
Providing Operation and maintenance for
campus as per conditions and S.O.P Rate Per
describe in tender document and as Month
directed by Engineer in charge.
1. Contractor must visit the site location to review the work done & remaining work
assessment for thoroughly analyzed entire project before quoting rates to complete the
job including handover and O&M as per terms & conditions.
2. Contractors shall read carefully the tender clauses, scope of work, schedule of payment,
minimum acceptable specifications, clauses of defect liability period, retention money,
performance guarantee, security deposit etc. for purpose of estimating quantity / rates.
3. Any variation up to 1% of unit area (sr. no. 1 & 5) will not be paid / deducted.
4. Nothing extra (price rise, escalation, price variation, star rates) shall be paid to the
agency, over & above the quoted rate by them.
5. If any component of the building is missing in the detail drawing, for estimation purpose
it shall be considered as per GDCR and NBC Specification whichever is applied.
I/We/are willing to carry out the above work at Rs_______________________ (in words Rs.
I/We have read the conditions mentioned in this tender and agree to abide by the same.
[Note: These rates to be quoted online only]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Form B-1 F.P 31.pdf
2. B-1.pdf
3. Tender Aggrement Notice.pdf
4. Tender Notice.pdf
5. Read Notice Online.pdf
6. Vol I - Technical Bid FP 31.pdf
7. Vol II - Price Bid FP 31.pdf
8. Tentative Item list - Remaining work.pdf
9. Tentative Item list - Commercial new.pdf
10. Technical Specifications CIVIL WORK-Remaining work.pdf
11. Technical Specifications-Civil work-New commercial.pdf
12. MEPF Specification of Items-MEPF-Remaining work.pdf
13. Make of material - ELEC plus ELV-Remaining work.pdf
14. Technical Specifications PLUMBING WORK-New Commercial.pdf
15. Technical Specifications ELECTRICAL ELV WORK-New Commercial.pdf
16. Soil testing report Sanand FP No. 31 Sanand final 27-9-2019.pdf
17. Form X Undertaking site visit.pdf
18. FP-31 Drawing list.pdf
19 Extra Condition- Gujarati.pdf
Addendum 03.pdf
CORRIGENDUM
Clarifications of prebid queries.pdf
CORRIGENDUM
Addendum-02.pdf
CORRIGENDUM
300_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-3 PART 2.pdf
CORRIGENDUM
281_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-3 PART 2.pdf
CORRIGENDUM
219_ELV TYPICAL FLOOR PLAN-B-3 PART 2.pdf
CORRIGENDUM
219_Binder3_ELV 6.pdf
CORRIGENDUM
218_Binder3_ELV 5.pdf
CORRIGENDUM
217_Binder3_ELV 4.pdf
CORRIGENDUM
216_Binder3_ELV 3.pdf
CORRIGENDUM
215_Binder3_ELV 2.pdf
CORRIGENDUM
214_Binder3_ELV 1.pdf
CORRIGENDUM
177 STRUCTURAL LAYOUT DETAILS AT TERRACE LVL-4.pdf
CORRIGENDUM
304_INI-EWS-FP 31-GR-RWD-01 EXT GF PLUMBING LAYOUT_02.04.2024.pdf
CORRIGENDUM
302_FP 31_PLUMBING LAYOUT FOR GROUND FLOOR INTERNAL TOILET.pdf
CORRIGENDUM
319_ELV TERRACE FLOOR PLAN- GFC-B-3 PART 2.pdf
CORRIGENDUM
318_ELV TERRACE FLOOR PLAN- GFC-BLD-3 PART 1.pdf
CORRIGENDUM
317_ELV TERRACE FLOOR PLAN- GFC-BLD-2 PART 2.pdf
CORRIGENDUM
314-319_Binder2_TF.pdf
CORRIGENDUM
316_ELV TERRACE FLOOR PLAN- GFC-BLD-2 PART 1.pdf
CORRIGENDUM
315_ELV TERRACE FLOOR PLAN- GFC-BLD-1 PART 2.pdf
CORRIGENDUM
314_ELV TERRACE FLOOR PLAN- GFC-BLD-1 PART 1.pdf
CORRIGENDUM
300_Binder1_GF 6.pdf
CORRIGENDUM
299_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-3 PART 1.pdf
CORRIGENDUM
299_Binder1_GF 5.pdf
CORRIGENDUM
298_ELV GROUND FLOOR PLAN- SHOPS- GFC-B-2 PART 2.pdf
CORRIGENDUM
298_Binder1_GF 4.pdf
CORRIGENDUM
297_ELV GROUND FLOOR PLAN- SHOPS- GFC-B-2 PART 1.pdf
CORRIGENDUM
296_ELV GROUND FLOOR PLAN- SHOPS- GFC-B-1 PART 2.pdf
CORRIGENDUM
297_Binder1_GF 3.pdf
CORRIGENDUM
296_Binder1_GF 2.pdf
CORRIGENDUM
295_ELV GROUND FLOOR PLAN- SHOPS- GFC-B-1 PART 1.pdf
CORRIGENDUM
295_Binder1_GF 1.pdf
CORRIGENDUM
280_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-3 PART 1.pdf
CORRIGENDUM
279_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-2 PART 2.pdf
CORRIGENDUM
278_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-2 PART 1.pdf
CORRIGENDUM
277_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-1 PART 2.pdf
CORRIGENDUM
276_CONDUIT TERRACE FLOOR PLAN- GFC-BLD-1 PART 1.pdf
CORRIGENDUM
275_CONDUIT BASEMENT_UGT_1.62-GFC-INI-EWS-FP 31-BF-ELE-LTG-PWR-01.pdf
CORRIGENDUM
274_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-3 PART 2.pdf
CORRIGENDUM
273_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-3 PART 1.pdf
CORRIGENDUM
272_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-2 PART 2.pdf
CORRIGENDUM
271_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-2 PART 1.pdf
CORRIGENDUM
270_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-1 PART 2.pdf
CORRIGENDUM
269_LTG-POWER UPPER TERRACE FLOOR PLAN-BLD-1 PART 1.pdf
CORRIGENDUM
268_ELE_LTG_PROTECTION LAYOUT_EL-LA-02.pdf
CORRIGENDUM
267 ELE_LTG_PROTECTION LAYOUT_EL-LA-01.pdf
CORRIGENDUM
266_LTG-POWER LOWER TERRACE FLOOR PLAN-BLD-3 PART 2.pdf
CORRIGENDUM
265_LTG-POWER LOWER TERRACE FLOOR PLAN-BLD-3 PART 1.pdf
CORRIGENDUM
264_LTG-POWER LOWER TERRACE FLOOR PLANB-2 PART 2.pdf
CORRIGENDUM
263_LTG-POWER LOWER TERRACE FLOOR PLAN-BLD-2 PART 1.pdf
CORRIGENDUM
262_LTG-POWER LOWER TERRACE FLOOR PLAN-BLD-1 PART 2.pdf
CORRIGENDUM
261_LTG-POWER LOWER TERRACE FLOOR PLAN-BLD-1 PART 1.pdf
CORRIGENDUM
260_INI-EWS-FP 31-GF-ELV-FAS-03.pdf
CORRIGENDUM
259_INI-EWS-FP 31-GF-ELV-FAS-02.pdf
CORRIGENDUM
258_INI-EWS-FP 31-GF-ELV-FAS-01.pdf
CORRIGENDUM
257_INI-EWS-FP 31-GF-ELV-CCTV-03.pdf
CORRIGENDUM
256_INI-EWS-FP 31-GF-ELV-CCTV-02.pdf
CORRIGENDUM
255_INI-EWS-FP 31-GF-ELV-CCTV-01.pdf
CORRIGENDUM
254_ELE_METER ROOM AND ELV SHAFT LAYOUT-BLD-3 PART 2.pdf
CORRIGENDUM
253_ELE_METER ROOM AND ELV SHAFT LAYOUT-BLD-3 PART 1.pdf
CORRIGENDUM
252 METER ROOM AND ELV SHAFT LAYOUT-GFC-BLD-2 PART 2.pdf
CORRIGENDUM
251_ELE_METER ROOM AND ELV SHAFT LAYOUT-GFC-B-2 PART 1.pdf
CORRIGENDUM
250_ELE_METER ROOM AND ELV SHAFT LAYOUT-GFC-B-1 PART 2.pdf
CORRIGENDUM
249_ELE_METER Room ELV SHAFT LAYOUT B-1 PART 1.pdf
CORRIGENDUM
248_01_LTG-POWER GROUND FLOOR PLAN- SHOPS-B-3 PART 2.pdf
CORRIGENDUM
247_01_LTG-POWER GROUND FLOOR PLAN- SHOPS-B-3 PART 1.pdf
CORRIGENDUM
246_01_LTG-POWER GROUND FLOOR PLAN- SHOPS-B-2 PART 2.pdf
CORRIGENDUM
245f_02_LTG-POWER TYPICAL FLOOR PLAN-B-3 PART 2.pdf
CORRIGENDUM
245e_02_LTG-POWER TYPICAL FLOOR PLAN-B-3 PART 1.pdf
CORRIGENDUM
245d_02_LTG-POWER TYPICAL FLOOR PLAN-B-2 PART 2.pdf
CORRIGENDUM
245c_02_LTG-POWER TYPICAL FLOOR PLAN-B-2 PART 1.pdf
CORRIGENDUM
245b_02_LTG-POWER TYPICAL FLOOR PLAN-B-1 PART 2.pdf
CORRIGENDUM
245a_02_LTG-POWER TYPICAL FLOOR PLAN B-1 PART 1.pdf
CORRIGENDUM
245_INI-EWS-FP 31-GF-ELE-LTG-PWR-03.pdf
CORRIGENDUM
244_INI-EWS-FP 31-GF-ELE-LTG-PWR-02.pdf
CORRIGENDUM
243_INI-EWS-FP 31-GF-ELE-LTG-PWR-01.pdf
CORRIGENDUM
242_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-3 PART 1.pdf
CORRIGENDUM
241_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-3 PART 1.pdf
CORRIGENDUM
240_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-2 PART 2.pdf
CORRIGENDUM
239_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-2 PART 1.pdf
CORRIGENDUM
238_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-1 PART 2.pdf
CORRIGENDUM
237_CONDUIT GROUND FLOOR PLAN- SHOPS- GFC-B-1 PART 1.pdf
CORRIGENDUM
236_INI-EWS-FP 31_EL-EXT-LTG-01.pdf
CORRIGENDUM
235_INI-EWS-FP-31_ELE_EARTH PIT LAYOUT-EARTH-GR-PART-3.pdf
CORRIGENDUM
234_INI-EWS-FP-31_ELE_EARTH PIT LAYOUT-EARTH-GR-PART-2.pdf
CORRIGENDUM
233_INI-EWS-FP-31_ELE_EARTH PIT LAYOUT EARTH-GR-PART-1.pdf
CORRIGENDUM
232_INI-EWS-FP 31_EL-01.pdf
CORRIGENDUM
230_INI-EWS-FP 31-BLD-3_EL-MTR-03.pdf
CORRIGENDUM
229_INI-EWS-FP 31-BLD-2_EL-MTR-02.pdf
CORRIGENDUM
228_INI-EWS-FP 31-BLD-1_EL-MTR-01.pdf
CORRIGENDUM
227_ELV BASEMENT_UGT-GFC.pdf
CORRIGENDUM
226_LTG-POWER BASEMENT_UGT-GFC.pdf
CORRIGENDUM
225_Binder1_CON 6.pdf
CORRIGENDUM
225_02_CONDUIT TYPICAL FLOOR PLAN-GFC-B-3 PART 2.pdf
CORRIGENDUM
224_Binder1_CON 5 .pdf
CORRIGENDUM
224_CONDUIT TYPICAL FLOOR PLAN-GFC-B-3 PART 1.pdf
CORRIGENDUM
223_CONDUIT TYPICAL FLOOR PLAN-GFC-B-2 PART 2.pdf
CORRIGENDUM
223_Binder1_CON 4.pdf
CORRIGENDUM
222_CONDUIT TYPICAL FLOOR PLAN-GFC-B-2 PART 1.pdf
CORRIGENDUM
222_Binder1_CON 3 rs.pdf
CORRIGENDUM
221_CONDUIT TYPICAL FLOOR PLAN-GFC-BLD-1 PART 2.pdf
CORRIGENDUM
221_Binder1_CON 2.pdf
CORRIGENDUM
220_CONDUIT TYPICAL FLOOR PLAN-GFC-B-1 PART 1.pdf
CORRIGENDUM
220_Binder1_CON 1.pdf
CORRIGENDUM
219_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-3 PART 2.pdf
CORRIGENDUM
218_ELV TYPICAL FLOOR PLAN-1.62-GFC-BLD-3 PART 1.pdf
CORRIGENDUM
218_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-3 PART 1.pdf
CORRIGENDUM
217_ELV TYPICAL FLOOR PLAN-1.62-GFC-BLD-2 PART 2.pdf
CORRIGENDUM
217_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-2 PART 2.pdf
CORRIGENDUM
216_ELV TYPICAL FLOOR PLAN-1.62-GFC-BLD-2 PART 1.pdf
CORRIGENDUM
216_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-2 PART 1.pdf
CORRIGENDUM
215_ELV TYPICAL FLOOR PLAN-1.62-GFC-BLD-1 PART 2.pdf
CORRIGENDUM
215_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-1 PART 2.pdf
CORRIGENDUM
214_ELV TYPICAL FLOOR PLAN-1.62-GFC-BLD-1 PART 1.pdf
CORRIGENDUM
214_ELV GROUND FLOOR PLAN- SHOPS- GFC-BLD-1 PART 1.pdf
CORRIGENDUM
205_PART FOUNDATION and COLUMN DETAIL FOR BUILDING-3-FP31.pdf
CORRIGENDUM
204_PART PILE RAFT FOUNDATION LAYOUT DETAILS FOR BUILDING-2-FP31.pdf
CORRIGENDUM
203_PART LAYOUT DETAILS FOR ETP PASSAGE WALL.pdf
CORRIGENDUM
202_PART FOUNDATION LAYOUT DETAILS FOR EWS BUILDING-1-FP31.pdf
CORRIGENDUM
201_PART LAYOUT DETAILS AT PLINTH BEAM LVL.FOR FP-31.pdf
CORRIGENDUM
200_STRUCTURAL DETAILS FOR ETP UGWT-SH-01 02 03.pdf
CORRIGENDUM
196-198_STRUCTURAL DETAILS FOR ETP UGWT.pdf
CORRIGENDUM
195_STRUCTURAL DETAILS FOR SECURITY CABIN.pdf
CORRIGENDUM
193-196_STRUCTURAL LAYOUT DETAILS AT TERRACE LEVEL .pdf
CORRIGENDUM
189-192_STRUCTURAL LAYOUT DETAILS AT TYP.FLOOR LEVEL.pdf
CORRIGENDUM
185-188_STRUCTURAL LAYOUT DETAILS AT FIRST FLOOR LEVEL.pdf
CORRIGENDUM
181-184 STRUCTURAL LAYOUT DETAILS AT PLINTH LVL.1.pdf
CORRIGENDUM
179-180 FOUNDATION and COLUMN DETAIL 1.pdf
CORRIGENDUM
178 STRUCTURAL DETAILS FOR COMPOUND WALL TYPE-A .pdf
CORRIGENDUM
177 STRUCTURAL DETAILS FOR COMPOUND WALL TYPE-A .pdf
CORRIGENDUM
176 STRUCTURAL LAYOUT DETAILS AT TERRACE LVL-3.pdf
CORRIGENDUM
176_STR. DETAILS FOR COMPOUND WALL TYPE-B .pdf
CORRIGENDUM
175_STRUCTURAL LAYOUT DETAILS AT TERRACE LVL-2.pdf
CORRIGENDUM
174_STRUCTURAL LAYOUT DETAILS AT TERRACE LVL-1.pdf
CORRIGENDUM
170-173_STRUCTURAL LAYOUT DETAILS AT TYP. FLOOR LVL.FOR B-2-WIN.pdf
CORRIGENDUM
164_PART LAYOUT DETAILS AT FIRST FLOOR LVL - BUILDING-2 and 3.pdf
CORRIGENDUM
162-163_STRUCTURAL LAYOUT DETAILS AT FIRST FLOOR FOR B-2.pdf
CORRIGENDUM
159-161_LAYOUT DETAILS AT PLINTH LVL FOR EWS BLDG-2 FP-31.pdf
CORRIGENDUM
157-RAFT FOUNDATION LAYOUT DETAILS L-CLUSTER .pdf
CORRIGENDUM
156_PILE RAFT FOUNDATION LAYOUT DETAILS L-CLUSTER 1.pdf
CORRIGENDUM
155_STRUCTURAL LAYOUT DETAILS AT TERRACE LVL.pdf
CORRIGENDUM
154__STRUCTURAL LAYOUT DETAILS AT TYP FLOOR LVL.pdf
CORRIGENDUM
153bPART LAYOUT DETAILS AT PLINTH BEAM LVL.pdf
CORRIGENDUM
153a_9181-02-C-003-SK01-R0_2023-05-01_PART LAYOUT DETAILS AT.pdf
CORRIGENDUM
152_STRUCTURAL LAYOUT DETAILS AT FIRST FLOOR LVL.FOR EWS.pdf
CORRIGENDUM
148-151 STRUCTURAL LAYOUT DETAILS AT PLINTH BEAM LVL.pdf
CORRIGENDUM
146-147 FOUNDATION LAYOUT COLUMN DETAILS FOR EWS BUILDING-1-FP31.pdf
CORRIGENDUM
336_EWS-FP 31 FIRE FIGHTING LAYOUT FOR GROUND FLOOR PLAN.pdf
CORRIGENDUM
328_FP-31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING 2and 3-WING D.pdf
CORRIGENDUM
327_FP-31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING 2 and 3-WING C E.pdf
CORRIGENDUM
326_FP-31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING-2and 3.pdf
CORRIGENDUM
325_FP-31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING1-WING D E.pdf
CORRIGENDUM
324_FP-31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING1-WING C.pdf
CORRIGENDUM
323_FP 31_PLUMBING SCHEMATIC LAYOUT FOR BUILDING-1_TYP.pdf
CORRIGENDUM
322_UGT_01 FP 31_PLAN SECTION DETAILS.pdf
CORRIGENDUM
322_FP 31_PLAN and SECTION LAYOUT OF UGT PUMP ROOM WITH.pdf
CORRIGENDUM
321_FP 31_PLUMBING LAYOUT FOR TYPICAL FLAT PLAN (BLD.1 2 3).pdf
CORRIGENDUM
320_FP 31_PLUMBING LAYOUT FOR TYPICAL FLOOR PLAN (BLD.1 2 3).pdf
CORRIGENDUM
313_FP 31_WATER SUPPLY LAYOUT FOR LOWER TERRACE FLOOR PLAN.pdf
CORRIGENDUM
312_FP 31_RAIN WATER LAYOUT FOR LOWER TERRACE FLOOR PLAN.pdf
CORRIGENDUM
311_FP 31_PLUMBING LAYOUT FOR UPPER TERRACE FLOOR PLAN.pdf
CORRIGENDUM
310_FP 31_DETAIL OF OVERHEAD WATER TANK 02 WITH SLEEVE DETAIL (2).pdf
CORRIGENDUM
309_FP 31_DETAIL OF OVERHEAD WATER TANK 01 WITH SLEEVE DETAIL.pdf
CORRIGENDUM
308_INI-EWS-FP 31-GR-WS-01 EXT GF PLUMBING LAYOUT_02.04.2024.pdf
CORRIGENDUM
308_FP 31_GROUND FLOOR PLAN EXTERNAL WATER SUPPLY LAYOUT.pdf
CORRIGENDUM
308_EWS-FP 31 GROUND FLOOR PLAN EXTERNAL WATER SUPPLY LAYOUT.pdf
CORRIGENDUM
307_EWS-FP 31 GROUND FLOOR PLAN EXTERNAL WASTE WATER DISPOSAl.pdf
CORRIGENDUM
306_INI-EWS-FP 31-GR-WD-01 EXT GF PLUMBING LAYOUT_02.04.2024.pdf
CORRIGENDUM
306_FP 31_GROUND FLOOR PLAN EXTERNAL WASTE WATER DISPOSAL LAYOUT.pdf
CORRIGENDUM
305b_INI-EWS-FP 31-GR-SWD-01 EXT GF PLUMBING LAYOUT_02.04.2024.pdf
CORRIGENDUM
305b_FP 31_GROUND FLOOR PLAN EXTERNAL STORM WATER DISPOSAL LAYOUT.pdf
CORRIGENDUM
305a_FP 31_GROUND FLOOR PLAN EXTERNAL SEWAGE DISPOSAL LAYOUT.pdf
CORRIGENDUM
305_INI-EWS-FP 31-GR-SEW-01 EXT GF PLUMBING LAYOUT_02.04.2024.pdf
CORRIGENDUM
304_FP 31_GROUND FLOOR PLAN EXTERNAL RAIN WATER DISPOSAL LAYOUT.pdf
CORRIGENDUM
303_FP 31_PLUMBING LAYOUT FOR GROUND FLOOR CEILING LVL.pdf
CORRIGENDUM
302_EWS-FP 31 PLUMBING LAYOUT FOR GROUND FLOOR INTERNALTOILET.pdf
CORRIGENDUM
302_EWS-FP 31 PLUMBING LAYOUT FOR GROUND FLOOR CEILING LVL.pdf
CORRIGENDUM
301_FP 31_PLUMBING LAYOUT FOR GROUND FLOOR SHOP AREA.pdf
CORRIGENDUM
301_EWS-FP 31 PLUMBING LAYOUT FOR GROUND FLOOR SHOP AREA.pdf
CORRIGENDUM
339_FP 31_FIRE FIGHTING LAYOUT FOR TYPICAL FLOOR PLAN.pdf
CORRIGENDUM
338_FP 31_FIRE FIGHTING LAYOUT FOR UPPER TERRACE FLOOR PLAN.pdf
CORRIGENDUM
338_FP 31_FIRE FIGHTING LAYOUT FOR LOWER TERRACE FLOOR PLAN.pdf
CORRIGENDUM
337_INI-EWS-FP-31-SCH-FF-02.pdf
CORRIGENDUM
337_INI-EWS-FP-31-SCH-FF-01.pdf
CORRIGENDUM
337_FP 31_FIRE SCHEMATIC LAYOUT FOR BUILDING 1 2 and 3.pdf
CORRIGENDUM
335_FP 31_EXTERNAL FIRE FIGHTING LAYOUT FOR GROUND FLOOR PLAN .pdf
CORRIGENDUM
334_08_FP 31_FIRE FIGHTING SLEEVE LAYOUT FOR GROUND FLOOR PLAN.pdf
CORRIGENDUM
333_07_FP 31_FIRE FIGHTING LAYOUT FOR GROUND FLOOR PLAN (BLD.3).pdf
CORRIGENDUM
332_06_FP 31_FIRE FIGHTING SLEEVE LAYOUT FOR GROUND FLOOR PLAN.pdf
CORRIGENDUM
331_05_FP 31_FIRE FIGHTING LAYOUT FOR GROUND FLOOR PLAN (BLD.2).pdf
CORRIGENDUM
330_FP 31_FIRE FIGHTING SLEEVE LAYOUT FOR GROUND FLOOR.pdf
CORRIGENDUM
329_FP 31_FIRE FIGHTING LAYOUT FOR GROUND FLOOR PLAN (BLD.1).pdf
CORRIGENDUM
107_M-201 Ventilation System Layout for Ground Floor Level Pump.pdf
CORRIGENDUM
106_M-200 Ventilation System Layout for Basement Level Pump.pdf
CORRIGENDUM
105_A_NE_RAFT_99.3 - BUILDING 3 - RAFT - NE COORDINATES.pdf
CORRIGENDUM
104_A_NE_RAFT_99.2 - BUILDING 2 - RAFT - NE COORDINATES.pdf
CORRIGENDUM
103_A_NE_RAFT_99.1_B RAFT - PART B- A1.pdf
CORRIGENDUM
102_A_NE_RAFT_99.1_A RAFT - PART A- A1.pdf
CORRIGENDUM
101_A-NE-103.4 3BUILDING 3- COL- NE DIMENSIONS- 1.62M-B3 PART.pdf
CORRIGENDUM
100_A-NE-103.3 BUILDING 3- COL- NE DIMENSIONS- 1.62M-B3 PART 1 3.pdf
CORRIGENDUM
99b_A_NE_103.2 - BUILDING 3 - COLUMNS - NE COORDINATES.pdf
CORRIGENDUM
98_A_NE_103.1 - BUILDING 3 - COLUMNS - NE COORDINATES - PART 1 3.pdf
CORRIGENDUM
97_A-NE-102.4 BUILDING 2- COL- NE DIMENSION - B2 PART 2A 2B.pdf
CORRIGENDUM
96_A-NE-102.3 BUILDING 2- COL-NE DIMENSIONS - B2 PART 1 3.pdf
CORRIGENDUM
95_A_NE_102.2 - BUILDING 2 - COLUMNS - NE COORDINATES.pdf
CORRIGENDUM
94_A_NE_102.1 - BUILDING 2 - COLUMNS - NE COORDINATES -.pdf
CORRIGENDUM
93_A-NE-101.6 COMPOUND WALL- COLUMNS- NE DIMENSION-PART 4-6.pdf
CORRIGENDUM
92_A_NE_101.5 BORE HOLE- NE DIMENSION- REV-AFTER.pdf
CORRIGENDUM
91_A_NE_101.4 COMPOUND WALL- SECTION AND ELEVATION.pdf
CORRIGENDUM
90_A_NE_101.3 COMPOUND WALL- COLUMNS- NE DIMENSION-PART 12-16.pdf
CORRIGENDUM
89_A_NE_101.2 COMPOUND WALL- COLUMNS- NE DIMENSION-PART 6-12.pdf
CORRIGENDUM
88_A_NE_101.1 COMPOUND WALL- COLUMNS- NE DIMENSION-PART 1-5.pdf
CORRIGENDUM
87_A-NE-100.6.pdf
CORRIGENDUM
86_A-NE-100.5.pdf
CORRIGENDUM
85_A-NE-100.4.pdf
CORRIGENDUM
84_A_NE_100.3 BUILDING 1- PART C- A1.pdf
CORRIGENDUM
83_A_NE_100.2 BUILDING 1- PART B- A2.pdf
CORRIGENDUM
82_A_NE_100.1 BUILDING 1- PART A- A1.pdf
CORRIGENDUM
81_A_M_NE_100.3.pdf
CORRIGENDUM
80_A_M_NE_100.2.pdf
CORRIGENDUM
79_A-M-NE_100.1.pdf
CORRIGENDUM
78_NE_100_R1.pdf
CORRIGENDUM
77_A-902 ROAD LEVELS SECTIONS.pdf
CORRIGENDUM
76_A-901 ROAD LEVELS LAYOUT - PART B.pdf
CORRIGENDUM
75_A-900 ROAD LEVELS LAYOUT - PART A.pdf
CORRIGENDUM
74_A-855 SIGNAGE GROUND FLOOR PLAN-A-855.pdf
CORRIGENDUM
73_A-852 TYPICAL MAIN GATE DETAIL.pdf
CORRIGENDUM
72_A-851 SECURITY CABIN DETAIL-A-815 (2).pdf
CORRIGENDUM
71_A-815 SECURITY CABIN.pdf
CORRIGENDUM
69-70_A-814.1 TYPICAL ANGANWADI HALL ENALRGE DETAIL.pdf
CORRIGENDUM
68_A-813.3 - STAIRCASE DEATILS (BUILDING - 3) (ST5 ST5 ST6).pdf
CORRIGENDUM
67_A-813.2 - STAIRCASE DEATILS (BUILDING - 1 2) (ST3 ST4 ST4).pdf
CORRIGENDUM
66_A-813.1 - STAIRCASE DEATILS (BUILDING - 1) (ST1 ST1 ST2).pdf
CORRIGENDUM
65_A-813 - TYPICAL STAIRCASE DEATILS (BUILDING - 1 2 3).pdf
CORRIGENDUM
64_A-810.2.T-1 A2_BUILDING 1 2 3 LOBBY FLOORING ELEVATION.pdf
CORRIGENDUM
63_A-811.1.T-1 A1_BUILDING 1 2 3_TYPICAL FLOOR PLAN .pdf
CORRIGENDUM
62_A-811.1 TYPICAL LOBBY DETAILS.pdf
CORRIGENDUM
61_A-811 TYPICAL LOBBY DETAILS.pdf
CORRIGENDUM
60_A_810.3.G-1 - BUILDING 1 2 3 -GROUND FLOOR-LOOBY .pdf
CORRIGENDUM
59_A-810.2.G-1 A1_BUILDING 1 2 3_Lobby flooring plan BUILDING 2 3.pdf
CORRIGENDUM
58_A-810.1.G-1 A1_BUILDING 1 2 3_lobby flooring plan BUILDING 1.pdf
CORRIGENDUM
57_A-810 TYPICAL LOBBY DETAILS.pdf
CORRIGENDUM
56_A-804 TYPICAL LOBBY DETAILS.pdf
CORRIGENDUM
55_A-802.3.pdf
CORRIGENDUM
54_A-802.2 WA WC AND BATH DETAIL-TOI ELE.pdf
CORRIGENDUM
53_A-802.1 WA WC AND BATH DETAIL-FLOORING LAYOUT.pdf
CORRIGENDUM
52_A-801 TYPICAL UNIT ENLARGED DETAIL CIVIL FLOORING PLUMBING.pdf
CORRIGENDUM
51_SECTIONS A-711.4.pdf
CORRIGENDUM
50_SECTIONS A-711.3.pdf
CORRIGENDUM
49_SECTIONS A-711.2.pdf
CORRIGENDUM
48_SECTIONS A-711.1.pdf
CORRIGENDUM
47_A- 703- ELEVATION.pdf
CORRIGENDUM
46_A- 702- ELEVATION.pdf
CORRIGENDUM
45_A- 701- ELEVATION.pdf
CORRIGENDUM
44_A- 305.pdf
CORRIGENDUM
43_A- 304.1.pdf
CORRIGENDUM
42_A- 304.pdf
CORRIGENDUM
41_A- 303.pdf
CORRIGENDUM
40_A- 302.pdf
CORRIGENDUM
39_A- 301.2.pdf
CORRIGENDUM
38_A- 301.1.pdf
CORRIGENDUM
37_A-203.T-2 - BUILDING 3 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
36_A-203.T-1 - BUILDING 3 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
35_A_203.G-2 - BUILDING 3 - GROUND FLOOR - R0.pdf
CORRIGENDUM
34_A_203.G-1 - BUILDING 3 - GROUND FLOOR - R0.pdf
CORRIGENDUM
33_A-203.F-2 BUILDING 3_FIRST FLOOR PLAN-A-203 F-2.pdf
CORRIGENDUM
32_A-203.F-1 BUILDING 3_FIRST FLOOR PLAN-A-203 F-1.pdf
CORRIGENDUM
31_A-105 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M- GFC-A_203 UT- 1.2.pdf
CORRIGENDUM
30_A-105 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M- GFC-A_203 UT-1.1.pdf
CORRIGENDUM
29_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-203 LT-1.2.pdf
CORRIGENDUM
28_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-203 LT- 1.1.pdf
CORRIGENDUM
27_A-202.T-2 - BUILDING 2 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
26_A-202.T-1 - BUILDING 2 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
25_A_202.G-2 - BUILDING 2 - GROUND FLOOR - R0.pdf
CORRIGENDUM
24_A_202.G-1 - BUILDING 2 - GROUND FLOOR - R0.pdf
CORRIGENDUM
23_A-202 F-2 BUILDING 2_FIRST FLOOR PLAN-A-202 F-2.pdf
CORRIGENDUM
22_A-202 F-1 BUILDING 2_FIRST FLOOR PLAN-A-202 F-1.pdf
CORRIGENDUM
21_A-201 A-105 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M.pdf
CORRIGENDUM
20_A-201 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M- GFC-A_201 UT-1.1.pdf
CORRIGENDUM
19_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-202 LT- 1.2.pdf
CORRIGENDUM
18_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-202 LT- 1.1.pdf
CORRIGENDUM
17_A-201.T-2 - BUILDING 1 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
16_A-201.T-1 - BUILDING 1 - TYPICAL FLOOR - R0.pdf
CORRIGENDUM
15_A-201.F-2 BUILDING 1_FIRST FLOOR PLAN - R0-A-201.F-2.pdf
CORRIGENDUM
14_A-201.F-1 BUILDING 1_FIRST FLOOR PLAN - R0-A-201.F-1.pdf
CORRIGENDUM
13_A-201.1 BUILDING 1 WING F ANF WING G FLOOR PLAN DETAILS TYPICAL.pdf
CORRIGENDUM
12_A-105 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M- GFC-A_202 UT-1.2.pdf
CORRIGENDUM
11_A-105 UPPER TERRACE FLOOR PLAN-SHEET- 1.62 M- GFC-A_202 UT-1.1.pdf
CORRIGENDUM
10_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-201 LT-1.2.pdf
CORRIGENDUM
09_LOWER TERRACE FLOOR PLAN- SHEET- 1.62 M- GFC-A-201 LT-1.1.pdf
CORRIGENDUM
08_A-151 HARDSCAPE PLAN EXTERNAL DEV and COMPOUND WALL DETAILS.pdf
CORRIGENDUM
07_A-107.2.pdf
CORRIGENDUM
06_A-107.1.pdf
CORRIGENDUM
05_A-103 TYPICAL FLOOR PLAN FP31.pdf
CORRIGENDUM
04_A-102_M LAYOUT PLAN WITH MARGINS.pdf
CORRIGENDUM
03_A-102-B1.2 - BUILDING 1 - GROUND FLOOR - R1.pdf
CORRIGENDUM
02_A-102-B1.1 - BUILDING 1 - GROUND FLOOR - R1.pdf
CORRIGENDUM
01_A-102 GROUND FLOOR PLAN-A-102.pdf
CORRIGENDUM
206-213_AUDA EWS- COMMERCIAL COMPLEX- STRUCTURE DWGS.pdf
CORRIGENDUM
343_INI-EWS-FP 31-COM-SC -02.pdf
CORRIGENDUM
342_INI-EWS-FP 31-COM-SC -01.pdf
CORRIGENDUM
341_INI-EWS-FP 31-COM-GR. 1st -01.pdf
CORRIGENDUM
340-INI-EWS-FP 31-COM-GR. 1st -01.pdf
CORRIGENDUM
308-INI-EWS-FP 31-GR-WS-01.pdf
CORRIGENDUM
305-INI-EWS-FP 31-GR-SWD-01.pdf
CORRIGENDUM
293_INI-EWS-FP 31-COM-SC -01.pdf
CORRIGENDUM
292_INI-EWS-FP 31-COM-2nd and TERR -01.pdf
CORRIGENDUM
291-INI-EWS-FP 31-COM-2nd and TERR -01.pdf
CORRIGENDUM
290-INI-EWS-FP 31-GR-SEW-01.pdf
CORRIGENDUM
289_SINGLE LINE DIAGRAM-COMMERCIAL.pdf
CORRIGENDUM
287_WING W_LIGHTING LAYOUT.pdf
CORRIGENDUM
287_WING V_LIGHTING LAYOUT.pdf
CORRIGENDUM
286_WING W_METER ROOM LAYOUT.pdf
CORRIGENDUM
285_WING V_METER ROOM LAYOUT.pdf
CORRIGENDUM
284_WING W_FIRE ALARM SYSTEM LAYOUT.pdf
CORRIGENDUM
283_WING V_FIRE ALARM SYSTEM LAYOUT.pdf
CORRIGENDUM
282_SUBSTATION AND CABLE ROUTE LAYOUT.pdf
CORRIGENDUM
145_FP_CC_A_853 UGWT.pdf
CORRIGENDUM
144_FP31_CC_A_801_TYPICAL SHOP TOILET DETAIL.pdf
CORRIGENDUM
143_FP31_CC_A_800_SHOP AND OFFICE DETAILS.pdf
CORRIGENDUM
142_FP31_CC_A_600_COMMON TOILET DETAILS.pdf
CORRIGENDUM
141_FP31_CC_A_403 - WING W FLOOR FINISHES.pdf
CORRIGENDUM
140_FP31_CC_A_402 - WING W FLOOR FINISHES.pdf
CORRIGENDUM
139_FP31_CC_A_401 - WING V FLOOR FINISHES.pdf
CORRIGENDUM
138_FP31_CC_A_400 - WING V FLOOR FINISHES.pdf
CORRIGENDUM
137_FP31_CC_A_303 - WING W- WALL CEILING FINISHES.pdf
CORRIGENDUM
136_FP31_CC_A_302 - WING W- WALL CEILING FINISHES.pdf
CORRIGENDUM
135_FP31_CC_A_301 - WING V- WALL CEILING FINISHES.pdf
CORRIGENDUM
134_FP31_CC_A_300 - WING V- WALL CEILING FINISHES.pdf
CORRIGENDUM
133_FP31_CC_A_257_HARDWARE DETAILS.pdf
CORRIGENDUM
132_FP31_CC_A_256_DW FIXING DETAILS.pdf
CORRIGENDUM
131_FP31_CC_A_255_WINDOW SCHEDULE.pdf
CORRIGENDUM
130_FP31_CC_A_254_GLAZING DETAILS SCHEDULE-3.pdf
CORRIGENDUM
129_FP31_CC_A_253_GLAZING DETAILS SCHEDULE-2.pdf
CORRIGENDUM
128_FP31_CC_A_252_GLAZING DETAILS SCHEDULE-1.pdf
CORRIGENDUM
127_FP31_CC_A_251_DOOR DETAILS SCHEDULE.pdf
CORRIGENDUM
126_FP 31_CC_A_852- SUBSTATION DETAIL.pdf
CORRIGENDUM
125_FP 31_CC_A_851_METAL FABRICATION DETAILS.pdf
CORRIGENDUM
124_FP 31 CC_A850 TYPICAL DETAILS and SIGNAGES.pdf
CORRIGENDUM
123_FP 31_CC_A_702.pdf
CORRIGENDUM
122_FP 31_CC_A_701.pdf
CORRIGENDUM
121_FP 31_CC_A_502- TYPICAL DETAILS.pdf
CORRIGENDUM
120_FP 31_CC_A_501- ST 02 DETAILS.pdf
CORRIGENDUM
119_FP 31_CC_A_500- ST 01 DETAILS.pdf
CORRIGENDUM
118_FP 31_CC_A_150 - EXTERNAL DEVLOPMENT SITE PLAN .pdf
CORRIGENDUM
112_FP31_CC_A_203- WING V FLOOR PLANS.pdf
CORRIGENDUM
111_FP31_CC_A_202- WING V FLOOR PLANS.pdf
CORRIGENDUM
110_FP31_CC_A_201- WING W FLOOR PLANS.pdf
CORRIGENDUM
109_FP31_CC_A_200- WING W FLOOR PLANS.pdf
CORRIGENDUM
Updated Drawing List- FP-31.pdf
CORRIGENDUM
Addendum FP-31.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].