Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | BEARING WITH CI BUSH IN SPLIT FOR EERM,ITEM 15, DRG.1-78-017-01533 | RAJESH ENGINEERING WORKS | 2 | ₹944 |
| 2 | GRIP COUPLING, FOR ESP (TYPE:FAA-8X37.5M-2X108150-2), RAPPING MECHANISM FOR EERM VERTICAL | RAJESH ENGINEERING WORKS | 2 | ₹1,298 |
| 3 | SHAFT 3190,DRG:2-78-425-02286 FOR COLLECTING RAPPING | GEECO ENERCON PVT LIMITED | 2 | ₹6,070.47 |
| 4 | SHAFT END,PART NO:2-78-025-02007,MAJOR EQUIPMENT:COLLECTING ELECTRODE RAPPING,ADDITIONAL INFORMATION:940 LENGTHCOLLECTING ELECTRODE RAPPING | GEECO ENERCON PVT LIMITED | 2 | ₹2,332.87 |
| 5 | SHAFT I,3570 ,DG:2-78-416-02176 FOR EMITTING RAPPING ALONG WITH KEY | GEECO ENERCON PVT LIMITED | 2 | ₹7,297.67 |
Tender Value
Refer Docs
Closing Date
15 Jun 2022, 12:00 amClosed
Kakatiya Thermal Power Project-TSGENCO
Supply of CERM and EERM Spares for ESP of 600 MW Boiler
328814
60/2022-23/CE/O&M/KTPP/BMD-II
Goods
Telangana
15 May 2023
15 Jun 2022
stage.html
html • 0.02 MB
aoc.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .