| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC THOTTASSERI HOUSE ALIPPARAMBA POST MALAPPURAM 679357 | MALAPPURAM | MALAPPURAM | KERALA | 679357 | ₹15.7 L | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹16.1 L+₹39,309.48 (2.50%)Rejected-Finance | ₹16.1 L+₹39,309.48 (2.50%) | L2 | Rejected-Finance L2 |
| 3 | L3₹16.7 L+₹95,720.87 (6.09%)Rejected-Finance | ₹16.7 L+₹95,720.87 (6.09%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Mohammed Rafeeq T. L1 | Shameem L3 | SALEEM A K L2 |
|---|---|---|---|---|---|---|
| 1.00TARRING | ||||||
| 1.01 | 3.2
Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br>
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 440 | sqm | 14.7 ₹6,468 Lowest | 15.6 ₹6,861.8 | 15.07 ₹6,629.92 |
| 1.02 | 3.5.2
Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 70.55 | cum | 65.78 ₹4,641.04 Lowest | 69.79 ₹4,923.61 | 67.43 ₹4,757.1 |
| 1.03 | 4.1.A.1
Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 89.52 | cum | 3,077.04 ₹2,75,450.47 Lowest | 3,264.36 ₹2,92,218.53 | 3,153.97 ₹2,82,336.73 |
| 1.04 | 4.9
Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as
per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 66 | cum | 3,449.92 ₹2,27,694.72 Lowest | 3,659.93 ₹2,41,555.64 | 3,536.17 ₹2,33,387.09 |
| 1.05 | OD115830/2025-2026 Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) (OD modified fromMORD 75.8.1) | 35.28 | cum | 8,446.62 ₹2,97,971.41 Lowest | 8,960.81 ₹3,16,110.46 | 8,657.79 ₹3,05,420.72 |
| 1.06 | 5.5.A.1a
Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 342.37 | sqm | 295.49 ₹1,01,166.91 Lowest | 313.48 ₹1,07,325.46 | 302.88 ₹1,03,696 |
| 1.07 | 5.1.1a
Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 440 | sqm | 75.89 ₹33,391.6 Lowest | 80.51 ₹35,424.4 | 77.79 ₹34,226.28 |
| 1.08 | 5.2.3a
Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 440 | sqm | 16.39 ₹7,211.6 Lowest | 17.39 ₹7,650.72 | 16.8 ₹7,392 |
| 1.09 | 5.2.1a Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,720 | sqm | 13.73 ₹23,615.6 Lowest | 14.57 ₹25,053.52 | 14.07 ₹24,205.56 |
Tender Value
₹15.7 L
EMD Value
₹39,310
Closing Date
2 Oct 2025, 12:00 pmClosed
Manager (PED)
STEEL INDUSTRIALS KERALA LTD. ATHANI P.O THRISSUR- 680 581
Improvement works of Kovilakam Padi Road at Perinthalamanna Municipality (Project No 23663)
2025_SILK_801890_1
SILK/PED/S-101/2025-26/1655
Open Tender
Miscellaneous Works
Item Rate
300 days
Perinthalamanna
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹39,310
Yes
31 Jul 2026
25 Sept 2025
3 Oct 2025
25 Sept 2025
2 Oct 2025
25 Sept 2025
25 Sept 2025 - 2 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .