Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.6 LAccepted-AOC | ₹8.6 L Quoted ₹8.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹8.9 LRejected-Finance | ₹8.9 L | 2 | Rejected-Finance L2 |
| 3 | 3₹8.9 LRejected-Finance | ₹8.9 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Lehnu Ram L2 | Sh. Chain Singh L1 | Jitender Singh L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Bhel Bhagot New and Old whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 8,90,000 ₹8.9 L | 8,75,000 ₹8.8 L | 8,90,900 ₹8.9 L |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 2 Nos pump house. Rising main: Booster stage : 1st phase: 100mmdia 210 Rmt, 1st phase: 100mm dia =3900 Rmt 2nd phase: 100mm dia=1710 Rmt. Distribution system: 45000 Rmt.(20mm dia to 100mm dia). Pumping machinery: Booster stage: 1st phase: submersible pump 2x5=10HP, 1st phase:2x40=80HP, 2nd phase: 2x40=80HP. No of storage tanks: 2 Nos, 1No sub storage tank, Total working hours 32 per day : through , 5 Nos perons. Indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 525000 ). Pumping hours per day ( 18 ) and energy consumptoin per day 255 Unit. | ||||||
Tender Value
₹8.2 L
EMD Value
₹16,400
Closing Date
9 Sept 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Kuthera Bhel Bhagot New and Old in Tehsil Sadar District Bilaspur (SH Operation for pumping machinery and distribution system for water supply scheme from main storage tank to different habitations for one year).
2025_HPIPH_113201_1
BLP-BLP-0736-NIT No. 6337-6436 Dated 27/08/2025
Open Tender
Civil Works
365 days
Sub Division Kandrour Section Kuthera
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹16,400
11 Dec 2025
30 Aug 2025
9 Sept 2025
30 Aug 2025
9 Sept 2025
30 Aug 2025
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Bhel Bhagot New and Old whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 2 Nos pump house. Rising main: Booster stage : 1st phase: 100mmdia 210 Rmt, 1st phase: 100mm dia =3900 Rmt 2nd phase: 100mm dia=1710 Rmt. Distribution system: 45000 Rmt.(20mm dia to 100mm dia). Pumping machinery: Booster stage: 1st phase: submersible pump 2x5=10HP, 1st phase:2x40=80HP, 2nd phase: 2x40=80HP. No of storage tanks: 2 Nos, 1No sub storage tank, Total working hours 32 per day : through , 5 Nos perons. Indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: 525000 ). Pumping hours per day ( 18 ) and energy consumptoin per day 255 Unit.
Lehnu Ram (BID ID -551885)
Jitender Singh (BID ID -551909)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid