Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹39.3 L+₹3.0 L (8.27%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹40.0 L+₹3.7 L (10.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹53.0 L+₹16.6 L (45.8%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹54.6 L
EMD Value
₹1.1 L
Closing Date
4 May 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Construction of Govt. Higher Secondary School Dehriralyote Balance Work
2026_PWDJK_308797_1
NIT NO 08 of 2026-27 Dated 25-04-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Executive Engineer
₹1.1 L
9 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
4 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 50 meter beyond 1m from cutting edge | 72.75 | Cum | 673.3 | ₹48,982.58 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 396 | Cum | 256.85 | ₹1,01,712.6 |
| 3 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) | - | Cum | 4,826.5 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 136.12 | Cum | 5,733.6 | ₹7,80,457.63 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 70.53 | Cum | 2,793.8 | ₹1,97,046.71 |
| 6Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete | |||||
| 6.1 | Foundations, footings, bases of columns | 120.51 | Sqm | 286.35 | ₹34,508.04 |
| 6.2 | Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs and steps etc. | 223.8 | Sqm | 628.95 | ₹1,40,759.01 |
| 7 | Stone filling hand packed in horizontal level including the cost of the stone | 96.3 | Cum | 937.9 | ₹90,319.77 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 41.25 | Cum | 218.4 | ₹9,009 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_1000321.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .