| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹37.1 L+₹2.5 L (7.25%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹49.5 L+₹15.0 L (43.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹53.1 L+₹18.5 L (53.6%)Rejected-Finance GOVT CONTRACTOR 1 32 MOHAMMED HOUSE 23 JIRGATANG SOUTH ANDAMAN PIN 744206 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744206 | L4 | Rejected-Finance L4 |
Tender Value
₹45.0 L
EMD Value
₹90,072
Closing Date
13 Mar 2024, 3:00 pmClosed
The Executive Engineer-III (Works)
The Executive Engineer-III (Works), Shadipur, Port Blair-744106
Construction of new CC road and PCC RCC wall side drain starting from main road to Vickey house at Tsunami Camp-I Ward No. 21 Phase-II
2024_PMBC_13533_2
20/EE-III/RW/MC/2023-24
Open Tender
Civil Works - Roads
Works
240 days
Brookshabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹90,072
4 Apr 2024
5 Mar 2024
13 Mar 2024
5 Mar 2024
13 Mar 2024
5 Mar 2024
Amount
Part A (Civil Works)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
Adhikari Construction
SRIYA ENTERPRISES
Haneefa Constructions
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .