Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.6 LAdmitted-Finance | ₹57.6 L | L1 | Admitted-Finance |
| 2 | L2₹59.5 L+₹1.9 L (3.27%)Admitted-Finance | ₹59.5 L+₹1.9 L (3.27%) | L2 | Admitted-Finance |
| 3 | L3₹60.1 L+₹2.5 L (4.38%)Admitted-Finance | ₹60.1 L+₹2.5 L (4.38%) | L3 | Admitted-Finance |
| 4 | L4₹60.3 L+₹2.7 L (4.69%)Admitted-Finance | ₹60.3 L+₹2.7 L (4.69%) | L4 | Admitted-Finance |
| 5 | L5₹60.9 L+₹3.3 L (5.81%)Admitted-Finance | ₹60.9 L+₹3.3 L (5.81%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S VED PAUL DEWAN L10 | MOHD RAFI SALARIA L7 | M/S RAJ KUMAR L5 | Wali Mohd Butt L9 | TRIKUTA INFRATECH AND DEVELOPERS PVT LTD L3 | AMIR KHAN L4 | M/S HAMAYUN SARWAR KHAN L2 | M/s Narinder Singh L11 | Om Parkash L13 | Radha Krishan L1 | M/S PEE ESS BUILDERS L12 | Mahesh Kumar L8 | SANJEEV KUMAR SHARMA L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 500 | SQM | 5 ₹2,500 Lowest | 15 ₹7,500 | 10 ₹5,000 | 12.4 ₹6,200 | 20 ₹10,000 | 80 ₹40,000 | 200 ₹1,00,000 | 10 ₹5,000 | 5 ₹2,500 Lowest | 5 ₹2,500 Lowest | 16 ₹8,000 | 12 ₹6,000 | 10 ₹5,000 |
| 2.00 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive, In yard and drains. | 80 | CUM | 100 ₹8,000 | 50 ₹4,000 | 10 ₹800 Lowest | 144.67 ₹11,573.6 | 600 ₹48,000 | 1,500 ₹1,20,000 | 351 ₹28,080 | 200 ₹16,000 | 800 ₹64,000 | 47 ₹3,760 | 520 ₹41,600 | 500 ₹40,000 | 150 ₹12,000 |
| 3.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 121.5 | CUM | 300 ₹36,450 | 200 ₹24,300 | 100 ₹12,150 Lowest | 145.67 ₹17,698.91 | 400 ₹48,600 | 200 ₹24,300 | 211 ₹25,636.5 | 200 ₹24,300 | 450 ₹54,675 | 100 ₹12,150 Lowest | 340 ₹41,310 | 225 ₹27,337.5 | 200 ₹24,300 |
| 4.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 19.5 | CUM | 4,800 ₹93,600 | 3,000 ₹58,500 | 2,500 ₹48,750 | 4,000 ₹78,000 | 4,500 ₹87,750 | 4,500 ₹87,750 | 2,200 ₹42,900 | 4,500 ₹87,750 | 4,800 ₹93,600 | 2,000 ₹39,000 Lowest | 4,300 ₹83,850 | 3,500 ₹68,250 | 2,654 ₹51,753 |
| 5.00 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts up to floor five level including curing but excluding cost of cantering shuttering, finishing and reinforcement. 1:1½:3 (1 cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)) including providing and placing PVC pipes 100 mm dia for weep holes | 427.43 | CUM | 7,250 ₹30,98,867.5 | 6,000 ₹25,64,580 | 6,300 ₹26,92,809 | 6,100 ₹26,07,323 | 6,000 ₹25,64,580 | 5,500 ₹23,50,865 Lowest | 6,100 ₹26,07,323 | 6,500 ₹27,78,295 | 9,000 ₹38,46,870 | 6,600 ₹28,21,038 | 9,160 ₹39,15,258.8 | 6,200 ₹26,50,066 | 6,130 ₹26,20,145.9 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more | 32,400 | KG | 82 ₹26,56,800 | 90 ₹29,16,000 | 75 ₹24,30,000 Lowest | 95 ₹30,78,000 | 80 ₹25,92,000 | 80 ₹25,92,000 | 75 ₹24,30,000 Lowest | 95 ₹30,78,000 | 105 ₹34,02,000 | 76 ₹24,62,400 | 88 ₹28,51,200 | 85 ₹27,54,000 | 82 ₹26,56,800 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc | 921.6 | SQM | 300 ₹2,76,480 | 300 ₹2,76,480 | 200 ₹1,84,320 | 300 ₹2,76,480 | 50 ₹46,080 Lowest | 250 ₹2,30,400 | 100 ₹92,160 | 100 ₹92,160 | 130 ₹1,19,808 | 130 ₹1,19,808 | 520 ₹4,79,232 | 200 ₹1,84,320 | 365 ₹3,36,384 |
| 8.00 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 11.5 | CUM | 7,500 ₹86,250 | 6,000 ₹69,000 | 5,500 ₹63,250 | 6,175 ₹71,012.5 | 8,500 ₹97,750 | 6,000 ₹69,000 | 12,000 ₹1,38,000 | 6,000 ₹69,000 | 7,000 ₹80,500 | 4,200 ₹48,300 Lowest | 8,800 ₹1,01,200 | 7,000 ₹80,500 | 5,600 ₹64,400 |
| 9.00 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 11.5 | CUM | 600 ₹6,900 | 1,000 ₹11,500 | 1,000 ₹11,500 | 1,300 ₹14,950 | 1,000 ₹11,500 | 5,000 ₹57,500 | 1,400 ₹16,100 | 1,300 ₹14,950 | 1,500 ₹17,250 | 200 ₹2,300 Lowest | 700 ₹8,050 | 500 ₹5,750 | 700 ₹8,050 |
| 10.00 | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 100 | SQM | 250 ₹25,000 | 300 ₹30,000 | 250 ₹25,000 | 350 ₹35,000 | 300 ₹30,000 | 250 ₹25,000 | 200 ₹20,000 | 200 ₹20,000 | 350 ₹35,000 | 150 ₹15,000 Lowest | 250 ₹25,000 | 225 ₹22,500 | 200 ₹20,000 |
Tender Value
₹99.4 L
EMD Value
₹2.0 L
Closing Date
2 Apr 2026, 2:00 pmClosed
Office of Executive Engineer TLMD-II, JKPTCL, Glad
Office of Executive Engineer TLMD-II, JKPTCL, Gladni Jammu
Construction of RCC protection wall of 220/33 KV Grid substation Chowdhi
2026_PDD_305863_1
TLMD-II/J/ 20 of 2025-26 Dated11-03-2026
Open Tender
Civil Works
Turn-key
120 days
GSS Chowadi
As per NIT and SBD
3 documents required · 3 mandatory
₹2,360
Executive Engineer, TLMD-II Gladni JKPTCL, Jammu
₹2.0 L
8 Apr 2026
11 Mar 2026
4 Apr 2026
11 Mar 2026
2 Apr 2026
12 Mar 2026
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive, In yard and drains.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts up to floor five level including curing but excluding cost of cantering shuttering, finishing and reinforcement. 1:1½:3 (1 cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)) including providing and placing PVC pipes 100 mm dia for weep holes
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete, of angle iron size 75x75x6 for Main Entrance Gate and grating
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of barbed wire used. (With G.I. barbed wire)
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 meter openable length (total length 90m), having 50 nos. rounds per 6 meter length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ meter (cost of M.S. angle, C.C. blocks shall be paid separately)
Dumping stone excluding cost of stones. in Horizontal on behind the retaining wall as filter stone
Supply of stone
Note. The rates are inclusive of all lead, lift, and Carraiges.
NOTE:- Any other minor work not specified in the BoQ but neccesary to complete the work at site satisfactorily shall be carried out at site and the charges of the same shall be deemed to be included in the quoted rates of the Bidder.
stage.html
html • 0.05 MB
technical_993276.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_993276.xls
BOQ • 0.33 MB
SBDRCCCHOWADHI.pdf
Tender Documents • 1.30 MB
ext01.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .