| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance GOA | NORTH GOA | GOA | 403524 | ₹1.9 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.9 CrSame as L1Rejected-Finance F 3 FIRST FLOOR IMTIYAS COMPLEX NEAR JAMIYA MASZID PANDITHWADA PONDA GOA | ₹1.9 CrSame as L1 | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.9 CrSame as L1Rejected-Finance | ₹1.9 CrSame as L1 | L3 | Rejected-Finance Rejected |
| 4 | L4₹1.9 Cr−₹0.01 (<0.01%)Rejected-Finance FLAT NO 1301 2 6 ARJUN DROPATI COMPLEX AUCHIT WADDO TIVIM BARDEZ GOA | ₹1.9 Cr−₹0.01 (<0.01%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹2.3 Cr+₹42.7 L (22.7%)Rejected-Finance H NO 368 ZUAREM TUEM PERNEM GOA | ₹2.3 Cr+₹42.7 L (22.7%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M s Noor Engineering L1 | CHERKALA CONSTRUCTIONS PVT. LTD. L2 | SAIBINI CONSTRUCTION L3 | Clasic Construction L2 | D K BHOMKAR L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all types of coglomerates, all types of laterite rocks, soft rock,ordinary rock,disintegrated rock,fissured / shuttered rock, decomposed or weathered rock and such other materials in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted including chiselling,wedging etc.but blasting prohibited in all conditions such as dry,moist, saturated submerged, foul conditions etc. including pumping or bailing out water/dewatering incl. setting out constructed of shoring and bracing, removal of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within 50 m all leads and lifts etc. as per specification & drawing and directed by the Engineer- in- charge etc. complete : All kinds of soil | 1,309 | Cum | 228 ₹2,98,452 | 228 ₹2,98,452 | 300 ₹3,92,700 | 224.74 ₹2,94,184.66 Lowest | 357.5 ₹4,67,967.5 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 210 | Cum | 1,764.82 ₹3,70,612.2 | 1,760.2 ₹3,69,642 | 1,950 ₹4,09,500 | 1,807.69 ₹3,79,614.9 | 1,658.33 ₹3,48,249.3 Lowest |
| 3.00 | Providing & laying in position cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level | 2,163 | Cum | 5,455.18 ₹1,17,99,554.34 | 5,452 ₹1,17,92,676 | 6,550 ₹1,41,67,650 | 5,457.88 ₹1,18,05,394.44 | 5,107.5 ₹1,10,47,522.5 Lowest |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete. | 4,066 | Sq.m | 325.03 ₹13,21,571.98 | 326.98 ₹13,29,500.68 | 400 ₹16,26,400 | 316.13 ₹12,85,384.58 | 305.28 ₹12,41,268.48 Lowest |
| 5.00 | Providing and fixing of weep holes with rigid PVC make laid in position with a required slope and level while laying pipe of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer-in-charge : 110 mm dia | 875 | R.M | 279.77 ₹2,44,798.75 Lowest | 292 ₹2,55,500 | 350 ₹3,06,250 | 312.18 ₹2,73,157.5 | 453.2 ₹3,96,550 |
| 6.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to lengths required (not exceeding 9 metres) and planted in position ready for driving: Upto 2.5 meters long pile | 5,250 | Metre | 154.02 ₹8,08,605 | 152 ₹7,98,000 | 350 ₹18,37,500 | 153.06 ₹8,03,565 | 144.83 ₹7,60,357.5 Lowest |
| 7.00 | Driving down wooden piles of 150mm mean diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured : Upto 2.5 meters long pile | 4,410 | Metre | 243.04 ₹10,71,806.4 | 243 ₹10,71,630 | 180 ₹7,93,800 Lowest | 243.56 ₹10,74,099.6 | 374.94 ₹16,53,485.4 |
Tender Value
₹2.3 Cr
EMD Value
₹4.7 L
Closing Date
19 Jun 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of flood protection wall from Rafeal Cardoz house to Salvador Fernandes house at Zorichembhat in ward no.7 of V.P. Carambolim in Cumbharjua Constituency
2025_WRD_22680_1
6-9/WDI/WRD/ASW/2025-26/e-05/1
Open Tender
Miscellaneous Works
Item Rate
180 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹4.7 L
12 Aug 2025
12 May 2025
20 Jun 2025
12 May 2025
19 Jun 2025
12 May 2025
Amount
Earthwork in excavation by mechanical means in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all types of coglomerates, all types of laterite rocks, soft rock,ordinary rock,disintegrated rock,fissured / shuttered rock, decomposed or weathered rock and such other materials in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted including chiselling,wedging etc.but blasting prohibited in all conditions such as dry,moist, saturated submerged, foul conditions etc. including pumping or bailing out water/dewatering incl. setting out constructed of shoring and bracing, removal of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within 50 m all leads and lifts etc. as per specification & drawing and directed by the Engineer- in- charge etc. complete : All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying in position cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing : All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for : Foundations, footings, bases for columns and mass concrete.
Providing and fixing of weep holes with rigid PVC make laid in position with a required slope and level while laying pipe of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer-in-charge : 110 mm dia
Supplying jamba wooden bally piles 150 mm mean diameter cut to lengths required (not exceeding 9 metres) and planted in position ready for driving: Upto 2.5 meters long pile
Driving down wooden piles of 150mm mean diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured : Upto 2.5 meters long pile
Clasic Construction (BID ID -49790)
CHERKALA CONSTRUCTIONS PVT. LTD. (BID ID -49828)
D K BHOMKAR (BID ID -49578)
SAIBINI CONSTRUCTION (BID ID -49759)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .