Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-Finance KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | ₹1.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹1.5 LAccepted-Finance | ₹1.5 L | 2 | Accepted-Finance L2 |
Tender Value
₹1.6 L
EMD Value
₹4,098
Closing Date
30 Apr 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil) Engineering Department University of Calicut Calicut University P O Malappuram District Kerala 673635
Reconstruction of compound wall of D6 Quarters
2026_UoC_848836_1
D1/1600/2025
Open Tender
Civil Works - Others
30 days
Calicut University Campus Thenjippalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹4,098
Yes
18 May 2026
23 Apr 2026
2 May 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar | - | cum | - | - |
| 2 | 15.8.2:Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m ( stacks of cleaned bricks shall be measured )From brick work in lime mortar | - | no | - | - |
| 3 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 4 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 5 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
| 6 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 7 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 8 | OD160244/2025-2026:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.(Using departmental stone) | - | cum | - | - |
| 9 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | - | cum | - | - |
| 10 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1434431.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1434431.xls
BOQ • 0.29 MB
DECLARATION.pdf
Additional Documents • 0.12 MB
epaymentform.pdf
Additional Documents • 0.01 MB
PreliminaryAgreementFormat.pdf
Additional Documents • 0.24 MB
TenderdocumentsD6CompWall.pdf
Tender Documents • 1.74 MB
Download all tender documents and submit your bid