| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance HIMACHAL PRADESH | -4.00% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.7 L+₹2,548.87 (0.70%)Admitted-Finance | -3.33% | ₹3.7 L+₹2,548.87 (0.70%) | L2 | Admitted-Finance |
Tender Value
₹3.8 L
EMD Value
₹7,600
Closing Date
1 Sept 2026, 5:00 pmClosed
Executive Engineer HPPWD Division Kotla Behar
Executive Engineer HPPWD Division Kotla Behar
DF/2026/110 (R/o) Restoration rain damages on Harpukkar to Chanouta road Km. 3/0 to 8/600 (SH P/l CC pavement at RD. 5/060 to 5/138 and 5/800 to 5/815) Deposit).
2026_PWD_142073_14
2659-70 dt 20.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Executive Engineer HPPWD Division Kotla Behar
Please refer Tender documents.
15 documents required · 15 mandatory
₹350
₹7,600
16 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
1 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and back filling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, Toll Tax, Sale Tax, or any other taxes imposed excluding GST by the Government. | 28.85 | Cubic metre | 210 | ₹6,058.5 |
| 2 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete nominal mix 1:3:6 (One cement isto three sand isto six graded crushed stone aggregate 20mm (twenty millimeter) nominal size), on ground or under water for all type of structure, in drain,edge wall and the like etcetera complete including pumping or bailing out water, dewatering (surface/sub soil water)including removal of slush which may arise at time of laying concrete for all heights/depths including cost of form work and curing complete for 14 (fourteen) days as per drawing and MORD Technical specification section 800, 900, 1200 and 1600 as per entire satisfaction and directions of Engineer-in-charge, including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 15.2 | Cubic metre | 3,850 | ₹58,520 |
| 3 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, Toll Tax, Sale Tax, or any other taxes imposed excluding GST by the Government. | 18.5 | Cubic metre | 3,300 | ₹61,050 |
| 4 | Providing and laying mechanically mixed and vibrated plain/reinforced cement concrete pavement Grade-M-25 (M-Twenty five) design mix with minimum cement contents of 404 Kg (Four hundred four Kilogram) in open foundation as per drawing and MORD technical specification clause 802, 803, 1202 and 1203 including the cost of form work and curing complete but excluding cost of reinforcement for reinforced concrete work as per satisfaction and direction of Engineer-in-Charge, including carriage of materials up to all leads, lifts.The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 45.5 | Cubic metre | 5,600 | ₹2,54,800 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
14.pdf
Tender Documents • 3.30 MB
BOQ_210970.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .