| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.6 L+₹80,506.80 (9.12%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹13,300
Closing Date
5 Mar 2021, 3:00 pmClosed
Executive Engineer
PH Division ,Aluva
State - plan 2020 21 Optimization of Production and Transmission Energy Conservation RWSS to Thabore Supply and erection and commissioning of 40 HP VT slow speed pump unit at Thabore pump house Retender
2021_KWA_417018_1
171/2020-21/EE/PHD/ALV
Open Tender
Electrical Works
Item Rate
150 days
PH Division, Aluva
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,016
₹13,300
29 May 2021
19 Feb 2021
8 Mar 2021
19 Feb 2021
5 Mar 2021
19 Feb 2021
Amount
WORKING CHARGE
Charge for interconnecting newly installed pumpset after dismantling the existing damaged delivery line at out side of pump house. Interconnecting with 100/80 mm GI branch line, providing new valve, interconnection etc complete including cost of materials , labour charge ,welding charge etc complete as directed by departmental officers at site.
Supplying and fitting 160 amps TPN incomer switch fuse unit-1 no at main panel board as directed by departmental officers
HYDRO-TECH ENGINEERING CO.
Bidder Name
HYDRO-TECH ENGINEERING CO.
National Electrical Works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592210.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .