Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹64.2 L+₹8.2 L (14.6%)Rejected-AOC AMBAZACHALIL HOUSE VALAYANCHIRANGARA P O PERUMBAVOOR | PERUMBAVOOR | ERNAKULAM | KERALA | L2 | Rejected-AOC L2 |
Tender Value
₹68.5 L
EMD Value
₹50,000
Closing Date
16 Feb 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, KD DIVISION THANNEERMUKKOM
GENERAL-MANNAR PUTHANKARI PADASEKHARAM-KP-Improvement works to Mannar Puthankari Padasekharam in Kaduthuruthy Gramapanchayath, Kottayam District-General Civil Work
2025_Irrig_735672_1
33/EE/KDT/2024-25
Open Tender
Civil Works - Water Works
Item Rate
360 days
Kaduthuruthy
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
25 Mar 2025
7 Feb 2025
20 Feb 2025
7 Feb 2025
16 Feb 2025
7 Feb 2025
Amount
Retaining wall and Bund formation
OD27694/2024-2025:Bund Formation- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) for flood banks, marginal bunds etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming etc, lead up to 50 m and lift up to 1.5 m.
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD27695/2024-2025:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
OD27697/2024-2025:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost, conveyance, labour charges etc complete
OD27698/2024-2025:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD27700/2024-2025:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD27696/2024-2025:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
Pipe Culvert
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD28687/2024-2025:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site
19.6.10:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:900 mm dia R.C.C. pipe
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
SAJI A KURUVILLA (BID ID -2110879)
Bidder Name
SAJI A KURUVILLA
JOE THOMAS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1178691.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .