| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹1.6 L (1.56%)Rejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹1.0 Cr+₹2.7 L (2.72%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹1.1 Cr+₹7.0 L (7.01%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹1.1 Cr+₹14.3 L (14.4%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
29 Apr 2023, 5:00 pmClosed
District Project Manager O/o DPMU HPCDP JICA ODA
District Project Manager O/o DPMU HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
Flow Irrigation Scheme Nagni Kuhal at Village and G.P. Kohala, Tehsil Kangra, District Kangra (H.P.)
2023_HPCDP_72328_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022-Vol-I-59
Open Tender
Civil Works - Water Works
Item Rate
365 days
G.P. Kohala, Tehsil Kangra, District Kangra (H.P.)
Please refer Tender documents.
16 documents required · 16 mandatory
₹2,000
DPM HPCDP JICA Palampur
₹1.3 L
District Project Management Unit HPCDP JICA ODA Ph
27 Jul 2023
19 Apr 2023
1 May 2023
19 Apr 2023
29 Apr 2023
19 Apr 2023
25 Apr 2023
Amount
Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Demolishing stone rubble masonry manually/ by mechanical means manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases of columns,etc. for mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Suspended floors, roofs, landings, balconies and access platform complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Columns, Pillars, Piers, Abutments, Posts and Struts complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Lintels, beams, plinth beams, girders, bressumers and cantilevers complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Edges of slabs and breaks in floors and walls Under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Extra Allowance for formwork in concrete lining in:
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
In sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing cement concrete lining 15 cm thick or less for irrigation channels, using cement concrete 1:2:4 (1 cement2 sand :4 stone aggregate 20 mm nominal size) in:
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Side slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete 1:2:4 (1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of centering and shuttering for all work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in :
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In beams, suspended floors, roofs having slope landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
20 mm cement plaster in cement mortar 1:4 (1 cement: 4 Coarse sand) complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Wire Crate of G.I. wire filled with boulders with square cut faces angainst the wire (Wire Crates to be measured and paid for separately) complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Wire Crates made of G.I. wire filled with boulders with square cut faces against the wire (Boulder filling to be measured and paid for separetly) G.I. Wire 5.00 mm thick corresponding to SWG-8 15 cm x 15 cm mesh complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing, laying, jointing, commissioning & testing in trenches HDPE pipes of following diameters & classes as per IS 4984 (1995) and jointing the pipes with push type compression joints by hydraulically operated machines, butt fussion welding & electro fusion welding machines i/c necessary fittings, bends, tees, unions, flanges, collars & reducers etc. confirming to IS 8360 & IS 8008 with latest ammendments & shall be provided as per site conditions. Flanging of the pipes shall be made as & where required. Jointing shall be confirming to IS code 8008 & IS 7634, stub ends will be welded on pipes & MS flange shall be provided with slip on covered by epoxy coating/plastic powder. The flange should be confirm to ANSI B 16.5 with necessary nuts & bolts. All manufacturing maerial used shall be in accordance to IS 4427-2007 (latest revision) with 100 % virigin pre-compounded or natural PE resin. Jointing shall be complete in all respects i/c testing at site upto entire satisfaction of the Engineer-in-Charge.
90 mm dia HDPE pipe (PN 4.0, PE 80)
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Naveen Kumar
SEWA SINGH
Kuldeep Sood Govt. Contr.
Ajeev Kumar
GANTANTAR THAKUR
AMIT CHOUDHARY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .