Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | NOT L1₹34.5 LAccepted-AOC 202 VANDAN FLATS 26 PUNIT NAGAR O P ROAD VADODARA GUJARAT 390007 | VADODARA | GUJARAT | 390007 | NOT L1 | Accepted-AOC As per tender conditions | |
| 2 | L1₹69.4 LRejected-AOC | L1 | Rejected-AOC As per tender conditions | |
| 3 | NOT L1₹2.9 CrRejected-AOC | NOT L1 | Rejected-AOC As per tender conditions | |
| 4 | Rejected-Technical PLOT NO 92 SPRING BLOSSOM NEAR SATHIYAM GRANDE HOTEL SRIPERUMBUDUR KANCHIPURAM TAMIL NADU 602105 | KANCHIPURAM | TAMIL NADU | 602105 | - | Rejected-Technical AS PER TENDER CONDITIONS | |
| 5 | Rejected-Technical | - | Rejected-Technical AS PER TENDER CONDITIONS |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Mar 2022, 2:30 pmClosed
Samrat Dutta
Brahmaputra Cracker and Polymer Limited, C and P Department, Administrative Building, PO_Lepetkata, Dist_DIBRUGARH, Assam, Pin Code_786006
Please refer Tender documents.
2022_BCPL_108275_1
BCPL/CNP/LE21W0267SD/02083
Open Tender
Miscellaneous Services
Lump-sum
180 days
BCPL, Lepetkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.2 L
Yes
BCPL, Lepetkata
13 Sept 2022
3 Mar 2022
24 Mar 2022
3 Mar 2022
23 Mar 2022
3 Mar 2022
7 Mar 2022
Amount
FoamPigging of18"Richgas pipeline OneRun Long Text: Cleaning Pigging of 18 inch Duliajan - Lepetkata Pipeline : Mobilization of pig , equipment , pigging tools , tackles , consumables , spares , accessories and personnel by contractor at work site including but limited to providing, handling , transportation of HD Foam / CUP / Cleaning Magnetic Brush Combined Tool (MBCT) pigs , transportation of tools, equipments , contractors personnel to site as per specifications and provisions of the tender document including deployment of consumables , spares , accessories etc. as required for satisfactory and timely completion of running by Launching & Receiving of the Pig , Tracking , Retrieving of the pig from the pig barrel & proper disposal of the retrieved pig. Demobilisation along with all the deployed tools , tackles , contractor personnel , submission of Detail Report of individual run, as per Scope of Work , Special Condition of Contract and Tender Document. For detail of pipe line & length refer Annex-I of SCC & SOW
FoamPiggingof18"RichgaspipelineSecon drun Long Text: Foam Pigging - Second One (1) run in Individual as per requirement (if first run of Foam pig is not successful)as per SCC and SOW for 18" Rich Gas pipeline from Duliajan to Lepetkata
FoamPigging 3rdrun for18"Richgaspipeline Long Text: Foam Pigging - Third One (1) run in Individual as per requirement (if second run of Foam pig is not successful)as per SCC and SOW for 18" Rich gas Duliajan Lepetkata pipeline
Cup Pigging One run in Individual18"rich Long Text: Cup Pigging One (1) run in Individual as per SCC and SOW for 18" Rich gas Duliajan Lepetkata Pipeline
CleaningPigging 2run of MBCT for18"richgas Long Text: Cleaning Pigging Two (2) run of Magnetic Brush Combined Tool (MBCT)For 18" Rich gas Duliajan Lepetkata pipeline as per SCC and SOW
FoamPigging of 18"Leangaspipeline onerun Long Text: Cleaning Pigging of 18 inch Lepetkata-Duliajan Pipeline : Mobilization of pig , equipment , pigging tools , tackles, consumables , spares , accessories and personnel by contractor at work site including but limited to providing, handling , transportation of HD Foam / Gauge or CUP / Cleaning Magnetic Brush Combined Tool (MBCT) pigs , transportation of tools , equipments , contractors personnel to site as per specifications and provisions of the tender document including deployment of consumables , spares , accessories etc. as required for satisfactory and timely completion of running by Launching & Receiving of the Pig , Tracking , Retrieving of the pig from the pig barrel & proper disposal of the retrieved pig. Demobilisation along with all the deployed tools , tackles , contractor personnel , submission of Detail Report of individual run, as per Scope of Work , Special Condition of Contract and Tender Document. For detail of pipe line & length refer Annex-I of SCC & SOW
FoamPiggingof18"LeangaspipelineSecon drun Long Text: Foam Pigging -Second One (1) run in Individual as per requirement (if first run of Foam pig is not successful)as per SCC and SOW for 18" Lean Gas Lepetkata Duliajan Pipeline
FoamPigging 3rdrun for18"Leangaspipeline Long Text: Foam Pigging -Third One (1) run in Individual as per requirement (if second run of Foam pig is not successful)for 18" Lean gas Lepetkata Duliajan pipeline as per SCC and scope of work
Cup Pigging One run in Individual18"lean Long Text: Cup Pigging One (1) run in Individual for 18" Lean gas Lepetkata Duliajan pipeline as per SCC and scope of work
CleaningPigging 2run of MBCTfor18"leangas Long Text: Cleaning Pigging Two (2) run of Magnetic Brush Combined Tool (MBCT)for 18" Lean Gas Lepetkata Duliajan Pipeline as per SCC and SOW
FoamPigging of4"C2+Liquidpipeline Onerun Long Text: Cleaning Pigging of 4 inch Lakwa - Lepetkata Pipeline : Mobilization of pig , equipment , pigging tools , tackles, consumables , spares , accessories and personnel by contractor at work site including but limited to providing, handling , transportation of HD Foam / Gauge or CUP / Cleaning Magnetic Brush Combined Tool (MBCT) pigs , transportation of tools , equipments , contractors personnel to site as per specifications and provisions of the tender document including deployment of consumables , spares , accessories etc. as required for satisfactory and timely completion of running by Launching & Receiving of the Pig , Tracking , Retrieving of the pig from the pig barrel & proper disposal of the retrieved pig. Demobilisation along with all the deployed tools , tackles , contractor personnel , submission of Detail Report of individual run, as per Scope of Work , Special Condition of Contract and Tender Document. For detail of pipe line & length refer Annex-I of SCC & SOW
FoamPigging-Secondrun in Individual C2+ Long Text: Foam Pigging - Second One (1) run in Individual as per requirement (if first run of Foam pig is not successful)for 4" C2+ Liquid hydrocarbon Lakwa Lepetkata pipeline as per SCC and SOW
FoamPigging-Third One run for 4" C2+liqd Long Text: Foam Pigging - Third One (1) run in Individual as per requirement (if second run of Foam pig is not successful)for 4" C2+ Liquid hydrocarbon Lakwa Lepetkata pipeline as per SCC and SOW
CupPigging One run in Individual for C2+ Long Text: Cup Pigging One (1) run in Individual for 4" C2+ Liquid hydrocarbon Lakwa Lepetkata pipeline as per SCC and SOW
CleaningPigging 2runof MBCT for C2+liqd Long Text: Cleaning Pigging Two (2) run of Magnetic Brush Combined Tool (MBCT)for 4" C2+ Liquid hydrocarbon Lakwa Lepetkata pipeline as per SCC and SOW
Graffin Technologies
Bordubi Engineering Works
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .