Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.4 L+₹16,698.86 (5.13%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VGM CONSTRUCTIONS L1 | VG CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc complete., | 9.84 | sqm | 246 ₹2,420.64 Lowest | 258.85 ₹2,547.08 |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete. | 1.64 | sqm | 5,371 ₹8,808.44 Lowest | 5,639.56 ₹9,248.88 |
| 1.03 | Supply of Cut Stone Pillar of size 0.15 x 0.15 x 2.10m | 97 | No | 165 ₹16,005 Lowest | 173.88 ₹16,866.36 |
| 1.04 | Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 7.29 | Cum | 6,105 ₹44,505.45 Lowest | 6,411.18 ₹46,737.5 |
| 1.05 | Supplying and Fixing Chain Link Fencing of 5cm x 5 cm x 10 gauge including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. | 355.5 | sqm | 247 ₹87,808.5 Lowest | 260.11 ₹92,469.11 |
| 1.06 | Supplying and Fixing Barbed Wire Fencing 12G, 2 PLY including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. | 711 | sqm | 31 ₹22,041 Lowest | 32.12 ₹22,837.32 |
| 1.07 | Supplying and fixing Shade Net (Green Net) for under
construction of high rise building | 504 | sqm | 67 ₹33,768 Lowest | 70.61 ₹35,587.44 |
| 1.08 | supply and fixing of 40mm dia pipe including labour carges etc complete | 110 | rm | 101 ₹11,110 Lowest | 106.47 ₹11,711.7 |
| 1.09 | supply and fixing of 25mm dia pipe including labour carges etc complete | 80 | rm | 64 ₹5,120 Lowest | 67.99 ₹5,439.2 |
| 1.10 | PVC screw down tap heavy type 20mm dia | 3 | No | 93 ₹279 Lowest | 98.07 ₹294.21 |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
9 Mar 2026, 3:00 pmClosed
BDO Thiruverumbur
BDO Thiruverumbur
Providing Fencing and water supply arrangements with green net for block nursery at semmangulam hab in krishnasamuthram panchayat
2026_RDTN_671368_1
B1/2456/2025 nursery fencing
Open Tender
Civil Works
Item Rate
180 days
BDO Thiruverumbur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,500
Yes
10 Mar 2026
6 Mar 2026
9 Mar 2026
6 Mar 2026
9 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc complete., | 9.84 | sqm | 246.52 | ₹2,425.76 |
| 1.02 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete. | 1.64 | sqm | 5,371.01 | ₹8,808.46 |
| 1.03 | Supply of Cut Stone Pillar of size 0.15 x 0.15 x 2.10m | 97 | No | 165.6 | ₹16,063.2 |
| 1.04 | Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cpost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 7.29 | Cum | 6,105.89 | ₹44,511.94 |
| 1.05 | Supplying and Fixing Chain Link Fencing of 5cm x 5 cm x 10 gauge including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. | 355.5 | sqm | 247.72 | ₹88,064.46 |
| 1.06 | Supplying and Fixing Barbed Wire Fencing 12G, 2 PLY including cost and conveyance of all materials to work site and all kind labour charges and all charges for tools, machineries and equipments etc complete. | 711 | sqm | 30.59 | ₹21,749.49 |
| 1.07 | Supplying and fixing Shade Net (Green Net) for under
construction of high rise building | 504 | sqm | 67.25 | ₹33,894 |
| 1.08 | supply and fixing of 40mm dia pipe including labour carges etc complete | 110 | rm | 101.4 | ₹11,154 |
| 1.09 | supply and fixing of 25mm dia pipe including labour carges etc complete | 80 | rm | 64.75 | ₹5,180 |
| 1.1 | PVC screw down tap heavy type 20mm dia | 3 | No | 93.4 | ₹280.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
pricebidnur.pdf
Tender Documents • 0.29 MB
tecnur.pdf
Tender Documents • 0.42 MB
BOQ_806835.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .