Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 14 C ARAWALI ENCLAVE GMS ROAD GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 2 | Admitted-Finance 893 A 35 NEAR NAMDEV MANDIR JANTA COLONY ROHTAK 124001 ROHTAK HARYANA 124001 INDIA | ROHTAK | HARYANA | 124001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
16 Dec 2022, 11:00 amClosed
Regional OfficeR MoRTH Chandigarh
Kendriya Sadan 6th Floor Room No 611 Sector 9A Chandigarh 160009
CS FOR DPR FS DETAILED SURVEY/INVESTGN ALIGNMT OPTION PREPRN OF GAD ENGNG REPT FOR CONSTN OF PROPOSED FOB ND APPROACS ALONG WID SER ROAD ND PREPN OF LA PAPERS FS US DETAILS ON BATHINDA DABWALI ROAD KM297.115 NH54 IN PB
2022_MoRTH_723058_1
RW/CH/W(40)/PB/2022/1
Open Tender
Consultancy
EPC Contract
180 days
PUNJAB
As per Tender Documents
3 documents required · 3 mandatory
₹5,000
RPAO MoRTH
Exempted
Regional Office MoRTH Chandigarh
20 Feb 2023
11 Nov 2022
19 Dec 2022
11 Nov 2022
16 Dec 2022
11 Nov 2022
11 Nov 2022 - 23 Nov 2022
23 Nov 2022
Amount
I. Remuneration for Local Staff(including per diem allowance) Professional Staff
Team Leader cum Senior Bridge Engineer
Highway cum Pavement Engineer
Bridge/Structural Engineer
Meterial cum Geotechnical Engineer - Geologist
Senior Survey Engineer
Environmental Specilist
Quantity Surveyor / Documentation Expert
Land Acquistion Expert
Utility Expert
Sub-Total-1
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Total-2
Total(Sub Total 1 + Sub Total 2)
II. SUPPORT STAFF
Office Manager
Typist
Office Boy
Night Watch ment
Total:
III. Transportation (Fixed Costs)
The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Total:
IV. Duty Travel to Site(Fixed Costs):
Duty Travel to Site (LS)
Total:
V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
Office Rent (Fixed Costs)
Total:
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
VIII. REPORTS & DOCUMENTS PRINTING
Monthly report (3 copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
IX. Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Total:
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
X. Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
XI. Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent
Ex-Kanoogo/Girdwar or equivalent
Ex-Patwari or Equivalent
Typist
Number of Land acquisition Teams (One Only)
Grand Total for All Land acquisition Teams(A)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km
Number of Land acquisition Teams (One Only)
Grand Total (B)
Grand Total for All Land acquisition Teams and Logistics (A) + (B)
Note: The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for easch 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team).
Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Total-I
II. Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
Sub-Total-II
Total (I+II)
Total cost net of Tax
Taxes and Duties
A. Income Tax (Expatriate)
B. Other Taxes/Duties (if any) Specify clearly
Total
Total cost net of Goods and service Tax **Total cost net of Goods and Service Tax shall be considered for financial evaluation.
Goods and service Tax
TOTAL COSTS (Including GST)
VEDOM ENGINEERING SERVICES PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .