| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC 28B ROWLAND ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹3.4 Cr Quoted ₹5.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 Cr+₹1.3 Cr (26.1%)Rejected-Finance | ₹6.3 Cr+₹1.3 Cr (26.1%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
15 Feb 2021, 2:00 pmClosed
MD,WBMSCL
Swasthya Sathi, GN-29, Sector-V, Salt Lake, Kolkata - 700 091
Design Supply Installation Commissioning Operation and Maintenance of Medical Gas Pipeline System at Purulia Super Specialty Hospital for 10 years
2021_WBMSC_317953_1
WBMSCL/NIT 22/2021, Dated 20/01/2021
Open Tender
MECHANICAL
Item Rate
120 days
Purulia Super Specialty Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15 L
Bord Roam WBMSCL
21 May 2021
25 Jan 2021
18 Feb 2021
25 Jan 2021
15 Feb 2021
2 Feb 2021
27 Jan 2021
Amount
OXYGEN SYSTEM
2 x 20 size Main manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system as per standards
2 x 10 size emergency manifold complete with middle frame with chain for individual cylinder along with Tail Pipe and Non Return Valve for every cylinder and Isolation Valve, Safety Valve, etc. as required for the complete manifold system as per standards
Fully Automatic control panel Imported for Oxygen Having a constant delivery flow capacity of 2000 lpm or above at 4.2 bar pressure as per Standards
Surface/panel/pendant mounted front loading double lock Oxygen outlets with matching Adapters (BS type) as per standards
Oxygen Flowmeter & Humidifier Bottle: Back Pressure Compensated Flow meter within a range of 0-15 LPM where 0-5 LPM should be with expanded scale. Humidifier bottle should be made of unbreakable polycarbonate materials and autoclavable at 121 degree Centigrade (to be supplied along with required low pressure tubing and face mask) as per standards
H.P. tubing having anti static core white color 5mtrs with kit conversion for Oxygen
NITROUS OXIDE SYSTEM
2 x 4 size manifold (Primary & Secondary supply) complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder, Safety Valve, etc. as required for the complete manifold system as per standards.
Fully Automatic control panel Imported for Nitrous Oxide Having a constant delivery flow capacity of 1000 lpm or above at 4.2 bar pressure as per Standards
2 cylinder Emergency Nitrous oxide arrangement using a high flow double stage Regulator with gauges complete with middle frame with chain for individual cylinder along with Non Return Valves for every cylinder as per standards
Surface/panel/pendant mounted front loading double lock Nitrous Oxide outlets with matching Adapters (BS type) as per standards
H.P. tubing having antistatic core Blue color 5 mtrs. with Kit conversion for Nitrous Oxide as per ISO Standards
COMPRESSED AIR SYSTEM
Compressed Air System complete with 4 nos. of non-lubricated, Reciprocating each of 15 HP Motor with 57 cfm capacity at 8.5Kg/cm2 pressure with Isolation Valve for each compressor, 2 nos. Air dryer with by-pass valve arrangement, Duplex Pressure Reducing Unit each for Air 4 bar and Air-7 bar valve arrangement Flexible High pressure SS Hose for each compressor NRV for each compressor, 2 nos. Air Receiver of 1500 litre capacity with Safety Valve and interconnecting pipelines, Pressure Gauge with Valve Arrangement in the Air Receiver Valve – Upstream of Air Receiver Automatic Drain Arrangement for air receivers Air Compressor By pass line Pressure Gauge with Valve arrangement in Main line Isolation Valve in the main line
Supply, Installation, Testing and commissioning of 4-stage air filtration system (suitable for 15 HP Compressor) as per ISO 8573.1.
Surface/panel/pendant mounted front loading double lock Medical Air-4 bar Outlets with matching Adapters (BS type) as per standards
Surface/panel/pendant mounted front loading double lock Surgical Air-7 bar Outlets with matching Adapters (BS type) as per standards
HP colour coded black Tubing having anti static core as per ISO Standards
VACUUM SYSTEM
Vacuum Central System Complete with 4 nos. Vacuum Pumps each having 149 cfm PD with Filter, interconnecting pipes, NRV, auto switch gear assy., exhaust silencer And Receiver – 2 No. 2000 liters, 2 nos. Bactria Filters, oil trap filter, etc. NRV for each Vacuum Pump Isolation Valve for each Vacuum Pump Valve - Upstream of Vacuum Receiver Vacuum Drain valve with flask arrangement Filters for each vacuum pump Silencer for each vacuum pump.
Surface/panel/pendant mounted front loading double lock Vacuum Outlets (BS Type) with matching Adapters
Ward vacuum Unit : It shall include vacuum regulator along with 0-760 mm of Hg vacuum gauge,600 ml capacity reusable poly carbonate collection bottle with overflow safety trap and autoclavable at 121 degree Centigrade with plastic slide wall mounted type (to be supplied along with required low pressure tubing with catheter).
Theatre Vacuum Unit: It shall be trolley mounted. The unit shall include one regulator along with 0-760 mm of Hg vacuum gauge mounted on the trolley stand, having two reusable collection bottles each of 2000 ml capacity and made of unbreakable polycarbonate materials, autoclavable at 121° Centigrade, having over flow safety trap, mounted on the base of trolley unit made of aluminium along with castor wheels and connected with regulator & low pressure tube inter-connections (along with required low pressure tubing with catheter).
High Pressure color coded yellow Tubing having anti static core as per ISO Standards
Low Pressure Tubing having anti static core as per ISO Standards
ANAESTHESIA GAS SCAVENGING SYSTEM (AGSS) (IMPORTED)
AGSS complete with Duplex Low Vacuum Pump, Plant Control Unit, AGSS Plastic Remote Indicator, Reservoir & Outlet Hose Assembly
Front Loading AGSS Outlets (imported) as per standards
Supply, Installation, Testing and commissioning of Combined Electrical Control Panel for Vacuum System (10HP each) & Compressed Air system (15HP each) with Duplex/ Cascading/ Sequencing facilities and complete with plant Room wiring .
Distribution Copper Pipe
12 mm OD x 0.7 mm thick copper pipe
15 mm OD x 0.9 mm thick copper pipe
22 mm OD x 0.9 mm thick copper pipe
28 mm OD x 0.9 mm thick copper pipe
42 mm OD x 1.2 mm thick copper pipe
54 mm OD x 1.2 mm thick copper pipe
76 mm OD x 1.5 mm thick copper pipe
Isolation Valve
Isolation Valve 15 mm
Isolation Valve 22 mm
Isolation Valve 28 mm
Isolation Valve 42 mm
Isolation Valve 54 mm
Isolation Valve 76 mm
Area Valve Service Unit
2 gas valve box configuration with size 15 O2, 22 VAC
3 gas valve box configuration with size 15 O2, 15 MA4, 22 VAC
4 gas valve box configuration with size 15 O2, 15 N2O, 15 MA4, 22 VAC
5 gas valve boxconfiguration with size 15 O2, 15 N2O, 15 MA4, 15 SA7, 22 VAC
Medical Gas Digital Area Alarm System as per standards
2 service alarm configuration for O2 and VAC
3 service alarm configuration for O2, MA4, VAC
4 service alarm configuration for O2, N2O, MA4, VAC
5 service alarm configuration for O2, N2O, MA4, SA7, VAC
CEILING PENDANTS
Ceiling Anesthetist Pendants for OT : Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with 7 nos. of Gas & Vacuum Outlets (2-Oxygen, 1-N2O, 1-Air 4 bar, 2-Vac & 1 AGSS)
Ceiling Surgeon Pendants for OT : Supply, Installation, Testing and commissioning of Single Arm Ceiling Pendant with 7 nos. of Gas & Vacuum Outlets (2-Oxygen, 1-N2O, 1-Air 4 bar, 1 Air 7 bar & 2-Vac)
Supply, installation and operation of 125 KVA Silent Diesel Generator along with 3 phase AMF panel complete with necessary electrical cabling, exhaust piping etc.
Turnkey - for both Civil & Electrical work wherever necessary
Operation & Comprehensive Maintenance charges
Operation & Comprehensive Maintenance charges for the 1st Year
O&M charges for Year 2
O&M charges for Year 3
O&M charges for Year 4
O&M charges for Year 5
O&M charges for Year 6
O&M charges for Year 7
O&M charges for Year 8
O&M charges for Year 9
O&M charges for Year 10
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .