| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹15.3 L+₹1,770 (0.12%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | G K Guna Bhala Sekar L1 | Bharathi Construction L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of IWSC at Kadampankurichi AD Colony H/O P.Kadampankurichi | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil | 50.47 | M3 | 263.28 ₹13,287.74 Lowest | 264.68 ₹13,358.4 |
| 3.00 | Cement concrete 1:4.8 mix (one cement four sand and eight aggregate)using 40mm gauge hand 2 broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication | 9.35 | M3 | 5,613.33 ₹52,484.64 Lowest | 5,614.73 ₹52,497.73 |
| 4.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 147.63 | M3 | 1,094.5 ₹1,61,581.04 Lowest | 1,095.9 ₹1,61,787.72 |
| 5.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm
size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard 4 broken stone jelly). Dummy columns should be at least 1 metre height) | 30.88 | M3 | 5,919.84 ₹1,82,804.66 Lowest | 5,921.24 ₹1,82,847.89 |
| 6.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard 5 specifiction. | 26.01 | M3 | 6,174.27 ₹1,60,592.76 Lowest | 6,175.67 ₹1,60,629.18 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the 6 supply of steel and binding wire) | 0.63 | M3 | 91,931.6 ₹57,916.91 Lowest | 91,933 ₹57,917.79 |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard
broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 4.26 | M3 | 9,516.77 ₹40,541.44 Lowest | 9,518.17 ₹40,547.4 |
| 9.00 | Plastering with Cement Mortar 1:4 20mm thick in all floors including curing etc. complete 8 complying with standard specification and as directed by the departmental officers. | 37.83 | M3 | 585.05 ₹22,132.44 Lowest | 586.45 ₹22,185.4 |
| 10.00 | Supply and fabrication and delivery of Steel Door and gate Including all labour charges | 24.15 | M3 | 4,927.1 ₹1,18,989.47 Lowest | 4,928.5 ₹1,19,023.28 |
Tender Value
Refer Docs
EMD Value
₹15,550
Closing Date
17 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO(B.Pt), Karur
BDO(B.Pt), Karur
Construction of IWSC at Kadampankurichi AD Colony in P.Kadampankurichi
2025_RDTN_602296_1
Construction of IWSC at Kadampankurichi AD Colony in P.Kadampankurichi
Open Tender
Civil Works - Others
Item Wise
90 days
Karur Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,550
Yes
27 Sept 2025
10 Sept 2025
17 Sept 2025
10 Sept 2025
17 Sept 2025
10 Sept 2025
Amount
Name of the Work : Construction of IWSC at Kadampankurichi AD Colony H/O P.Kadampankurichi
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil
Cement concrete 1:4.8 mix (one cement four sand and eight aggregate)using 40mm gauge hand 2 broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard 4 broken stone jelly). Dummy columns should be at least 1 metre height)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard 5 specifiction.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the 6 supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:4 20mm thick in all floors including curing etc. complete 8 complying with standard specification and as directed by the departmental officers.
Supply and fabrication and delivery of Steel Door and gate Including all labour charges
Supplying and mixing in positon indian water Closet (Oriya type) or size 580 x 440mm white glazed earthern ware of approved quality and brand with "P" or "S" trap conforming to BIS with crushed stone M.Sandcushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 (One lime, Two crushed stone M.Sandand Five brick jelly) 100mm thick and finishing the top to the required slope and including giving necessary connection to CI 10 soil pipes (including the cost of 100mm dia CI pipe for a length of 600mm) by dismantling brick
Europeon Water Closet with all fittings and 10lit capacity flusing tank
Plastering with Cement Mortar 1:3 Mix 10mm thick in all floors including curing etc. complete 11 complying with standard specification and as directed by the departmental officers.
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Flooring with following ceramic tiles of size 200 x 200 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and 13 pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc.,
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg./sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the 14 departmental officers.
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg./sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got 16 approved by the Executive Engineer before use of work).
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a 17 priming coat, including through scrapping, clean removel of dirt etc complete., for 10m2
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc.,
Provision for Electrical Arrangements
Light point SD 17
bulk head SD 83
Tuble light SD 87
Street light SD 94
7/20 GI VIR Wire SD64
25 MM GI Service pipe SD69
1000 litre tank
RCC Jolly
25mm PVC Pipe
25mm PVC tap
Cost and supply of 5.0 HP 50*175 borewell motor
Cost and supply of 5.0 Hp panel board
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Bharathi Construction (BID ID -1460691)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .