Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC CONTR VILLAGE BIHALI PO LARJI TEHSIL SAINJ DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172002 | ₹6.1 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹6.2 L+₹6,543.50 (1.06%)Rejected-Finance | ₹6.2 L+₹6,543.50 (1.06%) | L2 | Rejected-Finance L2 |
| 3 | L3₹6.2 L+₹9,544 (1.55%)Rejected-Finance | ₹6.2 L+₹9,544 (1.55%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Nimat Ram L2 | Hotam Ram L3 | MOHAN LAL L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in cutting in soil using Hydraulic excavator & Tippers with disposal upto 1000 mtr complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts.) | 6.6 | Cum | 280 ₹1,848 | 300 ₹1,980 | 275 ₹1,815 Lowest |
| 2.00 | Earth work in excavation by mechanical means ( Hydraulic excavator ) / Manual means over areas ( exceeding 30 cm in depth 1.5 m in width as well as 10 sqm on plan ) including getting out and disposal of excavatted earth lead upto 50 m and lift up to 1.5 m as directed within all leads/ lifts complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 23.4 | Cum | 560 ₹13,104 | 580 ₹13,572 | 555 ₹12,987 Lowest |
| 3.00 | Providing and laying cement concrete 1:4:8 (1cement : 4 sand : 8 graded stone agg.40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. including all leads and lifts & as per direction and to the entire satisfaction of Engineer in charge | 2.7 | Cum | 10,500 ₹28,350 | 10,600 ₹28,620 | 10,400 ₹28,080 Lowest |
| 4.00 | Providing and laying cement concrete 1:5:10(1cement:5sand:10 graded stone aggregate of 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/breast walls, the size of plums shall usually be 150mm to 300mm as per H.P.P.W.D specification including all leads and lifts | 48.41 | Cum | 9,000 ₹4,35,690 | 9,100 ₹4,40,531 | 8,900 ₹4,30,849 Lowest |
| 5.00Providing form work with steel plates 3.15mm thick welded with angle iron frame 30x30x5mm so as to give a fair finish including centring,shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling in all heights and removal of the same for insitu -reinforced concrete and plain concrete work in : | ||||||
| 5.01 | Vertical surfaces such as wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. | 155.9 | Sqm | 650 ₹1,01,335 | 640 ₹99,776 Lowest | 645 ₹1,00,555.5 |
| 6.00 | Boulder filling behind retaining wall with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 11.03 | Cum | 3,000 ₹33,090 | 2,950 ₹32,538.5 | 2,900 ₹31,987 Lowest |
| 7.00 | Providing and fixing 100 mm dia PVC pipe arrangement in weep hole including PVC mesh with in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 12 | Nos | 650 ₹7,800 | 600 ₹7,200 Lowest | 700 ₹8,400 |
Tender Value
₹4.1 L
EMD Value
₹7,033
Closing Date
5 Jun 2025, 5:00 pmClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
(SH- Repair of retaining wall in CC 1 5 10 with 15 Percent Plums)
2025_HPIPH_106406_3
NIT No. 1836-1935 dt. 27/05/2025
Open Tender
Civil Works
Item Rate
60 days
Banjar
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
EE Larji
₹7,033
13 Nov 2025
28 May 2025
6 Jun 2025
28 May 2025
5 Jun 2025
28 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .