Tender Value
₹9.3 Cr
EMD Value
₹18.6 L
Closing Date
27 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
SIGNAL
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : " Any EI Work OR Any Work of AMC of EI"
39 conditions · 31 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : " Any EI Work OR Any Work of AMC of EI"
"The Tenderer should be OEM/ Authorized dealer of OEM for Supply & installation of M/s. Kyosan make EI System".
Comprehensive Annual maintenance contract of Electronic Interlocking of Kyosan make installed at BNO-JOM (10 stn), RT, KAI, BOM, RKZ (04 Stn), MBT-JSM (09 Stn) stations of Jodhpur Division of NW Railway.
SNT-JU-11-2026-27
SNT-JU-11-2026-27
Open
Works - General
36 Months
Jodhpur, Rajasthan
₹0
₹18.6 L
27 Jul 2026
2 Jul 2026
13 Jul 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,30,22,586.88 | ||
| — | 768.00 | — | — | ||
| Comprehensive Annual maintenance contract of Electronic Interlocking of Kyosan make installed at various stations of Jodhpur Division as per RDSO specification No. RDSO/ SPN/192/ 2005 or latest. This includes maintenance of complete equipment along with all subsystems like CPUs and all the requisite cards of the EI system ,interface equipments with field signalling gears, and relay of electronic field interface equipment for interface with the field signalling gears,maintenance terminal with CPUs,keyboard, UPS & printer, operator panel interface etc. The AMC would be completely comprehensive which means supply and installation of all parts or equipment's whether consumable or otherwise required to put right the system.13 Stn X 36 Months = 468 months, 10 Stn X 30 Months =300 months | — | — | — | 9,30,22,586.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Correction slip 2
ATTACHMENT
AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
SNT-JU-11-2026-27StdTenderDocument.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_11ACS.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
AdvancecorrectionsliptoGCC2022.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .