| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC H NO M 224 1 DHOTAR BHAT CORLIM MOLLAR OLD GOA | NORTH GOA | GOA | 403001 | ₹23.1 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹23.4 LRejected-Finance | ₹23.4 L | L2 | Rejected-Finance Second Lowest bidder |
| Sl No | Description | Qty | Unit | Bianca E Dias L2 | Hajimalang Hasansab Attar L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical /manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel moorum of all varities shingles, pebbles, all types of conglomerates, laterite rock, soft rock ordinary or disintegrated rock, weathered, fissured /shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc in all conditions such as dry, moist, saturated submerged, foul conditions etc including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom & back filling the excavated earth to the extent required and disposing of the surplus excavated rock as directed by the Engineer in charge etc for all lead and lifts etc as specified and directed etc all complete. | 354.38 | Cum | 484 ₹1.7 L | 250 ₹88,595 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12.5 | Cum | 2,310 ₹28,875 | 2,310 ₹28,875 |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 255 | Sqm | 425 ₹1.1 L | 200 ₹51,000 |
| 4.00 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level | 193.5 | Cum | 8,580 ₹16.6 L | 9,175 ₹17.8 L |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge a) 110 mm dia | 35.1 | R.M | 380 ₹13,338 | 380 ₹13,338 |
Tender Value
₹22.0 L
EMD Value
₹44,060
Closing Date
9 Oct 2024, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Stabilization of Hill Slope by construction retaining wall in Sy. No. 206/10 in Oitiyant in Taliegao Constituency.
2024_WRD_17420_1
6-9/WDI/WRD/ASW/2024-25/e-09/1
Open Tender
Miscellaneous Works
60 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹44,060
25 May 2026
24 Sept 2024
11 Oct 2024
24 Sept 2024
9 Oct 2024
24 Sept 2024
Amount
Earthwork in excavation by mechanical /manual means in all types of strata comprising any of the materials such as soil, sand, clay, silt, gravel moorum of all varities shingles, pebbles, all types of conglomerates, laterite rock, soft rock ordinary or disintegrated rock, weathered, fissured /shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc in all conditions such as dry, moist, saturated submerged, foul conditions etc including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom & back filling the excavated earth to the extent required and disposing of the surplus excavated rock as directed by the Engineer in charge etc for all lead and lifts etc as specified and directed etc all complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) a) All works upto plinth level
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retaining structure complete as directed by the Engineer in charge a) 110 mm dia
Bianca E Dias (BID ID -38695)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid