| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17,544Accepted-Finance | ₹17,544 | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | Ponnappn L1 |
|---|---|---|---|---|
| 1.00Maintenance of Newcut foot bridge Hand rail | ||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.14 | cum | 3,372.7 ₹485.67 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 55.82 | kg | 171.81 ₹9,590.09 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 4.8 | sqm | 771.19 ₹3,701.71 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.14 | cum | 9,634.13 ₹1,387.31 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7.49 | kilogram | 103.26 ₹773.21 |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 4.94 | sqm | 324.8 ₹1,605.81 |
Tender Value
₹17,544
Closing Date
14 Jan 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,O/o AEE,Irrigation subdivision,Parappananagad
GENERAL-Temporary maintenance work for hand rails of existing Newcut Regulator -in Parappanangadi Municipality in Malappuram District.-General Civil Work
2025_Irrig_783732_7
IRR/IA/TR/5181/2025_5_1_1/1
Open Tender
Civil Works - Others
120 days
Keeranellur Newcut
Please reffer tender documents
10 documents required · 10 mandatory
₹0
Yes
6 Feb 2026
7 Jan 2026
16 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
Amount
Maintenance of Newcut foot bridge Hand rail
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
Bidder Name
Ponnappn
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1385717.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT.pdf
Tender Documents • 0.02 MB
SBD.pdf
Other Document • 1.86 MB
BOQ_1385717.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid