Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
9 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Krishna Kumar
Senior Project Engineer, Saran
BIHAR RAJYA PUL NIRMAN NIGAM LTD
Krishna Kumar
SENIOR PROJECT ENGINEER, SARAN
Demolition of Old Superstructure & Construction of New Superstructure including Overall Maintenance + Patch Repairing of Abutment, Pier & Pier Cap Demolition of Old Superstructure & Construction of New Superstructure of H.L RCC bridge over Daha river in 27th KM of Chhapra-Manjhi-Darauli-Guthni Road in Saran district. (RE-TENDER- 4th Call)
142704
NIT666
Open Tender
CIVIL
Saran
• Name of Applicant/Bidder
• Address of Applicant/Bidder
• PAN NO
• GST
• MOBILE NO. & E-MAIL
CIVIL
ITEM RATE
L1
1
23 documents required · 23 mandatory
₹10,000
Processing Fee: 11800
₹7.3 L
BRPNNL, HQ, PATNA
2 Nov 2026
2 Nov 2026
11 Nov 2026
2 Nov 2026
9 Nov 2026
2 Nov 2026
3 Nov 2026
180 days
Technical Bid Sheet
Tender No. NIT No 666 Date 26.10.2026
Name of Work Demolition of Old Superstructure & Construction of New Superstructure including Overall Maintenance + Patch Repairing of Abutment, Pier & Pier Cap Demolition of Old Superstructure & Construction of New Superstructure of H.L RCC bridge over Daha river in 27th KM of Chhapra-Manjhi-Darauli-Guthni Road in Saran district. (RE-TENDER- 4th Call)
Name of Circle Deputy Chief Engineer, Work Circle -1, Bihar Rajya Pul Nirman Nigam Ltd., Patna
Name of Division Senior Project Engineer, Saran Division Chhara, Bihar Rajya Pul Nirman Nigam Ltd.
Estimated Cost (in Lacs) Rs. 367.02 lacs
EMD (in Lakh) Rs. 7.34 Lakhs
Cost of Bid Document Rs. 10,000.00
Period of Sale Document 02.10.2026 (10:00 PM) to 09.11.2026 (upto 3:00 PM)
Time of Completion (in Month) 9 (Months)
Period of Bid Validity 180 Days
All Coloured cells to be filled by bidder ( leave no field blank & write N/A if not applicable)
1 Name of the Bidder
(a) Address of the Bidder
(b) Contact nos.of the Bidder
(c) Email of the Bidder
(d) Legal Status of Bidder.
(e) Place of Registration (of Firm/ Company)
2 Name of the Organisation/ Department/ Goverment with whom registered Department
Registration No.
Date of Validity
Requirement of Documents (Mandatory)
3 Bid Security Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement).should be valid for a period 225 days from last date of Bid Validity (Amount To be entered in Rupees) NIT T&C 15
4 Income Tax PAN/TAN NIT T&C 16(i)
5 GST/ Sale Tax Registration Certificate NIT T&C 16(i)
6 Power of attorney of signatory Bid NIT T&C 16(viii)
7 Character Certificte attached or not NIT T&C 13
8 Achieved in any one year (in the last five years i.e. 2021-2022 to 2025-2026) a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (Fifty percent) estimated cost of works for which bid has been invited. The turn over will be indexed at the rate of 8% for a year. Audited profit & Loss Accounts must be attached for proof of A.T.O (Annxure-II) i.e. 183.51 Lakh 2021-22 NIT T&C 16(ii)
9 Details of Key Personal (if any) NIT T&C 18(iii)
10 Similar Nature of work Experience (50%) Satisfactorily completed as a prime contractor of estimated value of contract during the last five years .Work will be awarded to those bidder either who has experience in strengthening/rehabilitation/replacement/repair of H.L RCC Bridge with repair technique, i.e replacement of structure components, pressure injection grouting, Polymer modified cement mortar, concrete overlays, structural upgrades, corrosion mitigation, prestressed carbon laminate wrapping, epoxy grouting and micro concrete etc. NIT T&C 16(vi)
11 Quantitative Experience for Similar Nature of Flyover/ RCC Bridge and Road work as prime contractor issued by government / govt. undertaking in any one of the last Five financial years.(F.Y.2021-22 to 2025-26) Dismantling of Super structure 307.00 CUM NIT T&C 16(ix)
Concreting work (PCC/ RCC/ PQC/PSC) 446.00 Cum NIT T&C 16(ix)
Non-Bituminous Work (GSB/ WMM) 284.00 Cum NIT T&C 16(ix)
Bituminous Work (BM/DBM/BC/SDBC) 71.00 Cum NIT T&C 16(ix)
12 Bid Capacity (AxNx3)-B SBD ITB 4.7
13 Availability of key items of Contractor's Equipment as per S.B.D. Annexure-I (Clause 4.5(B)(a) NIT T&C 18(ii)
14 (a) Existing commitments and ongoing works Amount To be entered (Rs in Lakhs) NIT T&C 16(v) Annexure II
(b) Work for which Bid already submitted Amount To be entered (Rs in Lakhs) NIT T&C 16(v) Annexure II
15 Banker,s Certificate for Financial Resources/ Liquid Assets of 10% of estimated cost. NIT T&C 16(iv) Annexure IV
16 Affidavit for Undertaking that the bidder will be able to invest minimum cash up to 25% of contract value of work, during implementation of work. NIT T&C 16(iii) Annexure III
17 Affidavit for True & Correct for documents submitted in Tender NIT T&C 16(xii) Annexure II/V
18 Affidavit for Debar , Rescind and Blacklisted NIT T&C 16(x) Annexure V
Name of work: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar.
Item No. Exceution Area Description of Item of Work Unit Qty Rate Amount
Cost for Sub-Structure
1 Removal of Damaged concrete Abutment & Bearing Pedestal & Pier Cap Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge Average Thickness =50 mm. Sqm 264.00
2 Removal of Damaged concrete Abutment & Bearing Pedestal & Pier Cap Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint.
2.1 Bars upto 12 mm diameter Rm 1584.00
2.2 Bars above 12 mm diameter Rm 2640.00
3 Apply anticorrosive coating over the reinforcement Providing and applying of anticorrosive treatment to exposed structural reinforcement by two coats of IPNET RB or equivalent application with time interval of minimum 8 -10 hours between each coat after application of two coats of alkaline rust converting primer confirming to ASTM-B-117. The application shall be done by brush or spray after cleaning existing reinforcement with wire/ rotary wire brush to make the surfaces free from loose material, dirt etc. inclusive of all labour, materials, equipment etc. complete as per specifications and instructions of Engineer in Charge. (Surface area of member shall be measured for payment purpose). Sqm 264.00
4 Damaged Surface area of Abutmnet, Bearning Pedestal & Pier Cap Epoxy bonding of new concrete to old concrete. Sqm 264.00
5 Honeycombing/ Damaged Surface area of Abutmnet, Bearning Pedestal & Pier Cap Sealing of crack/porous concrete with epoxy grout by injection thorugh nipples complete as per clause 2803.1 . Kg 516.00
6 Honeycombing/ Damaged Surface area of Abutmnet, Bearning Pedestal & Pier Cap Providing and inserting nipples with approved fixinjg compound after drilling holes for grouting as per technical specifications including subsequent cutting/ removal and sealing of hole as necessary of nipples sfter completion of grouting with cement/epoxy. Each 516.00
7 Damaged Surface area of Abutmnet, Bearning Pedestal & Pier Cap Patching of damaged concrete surface with polymer concrete and curing compounds,initiator and promoter,available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Sqm 264.00
8 New Bearing After Superstructure Replacement Supplying,fiiting and fixing in position true to line and level eleastomeric bearing conforming to IRC:83 (Part-II) sextion-IX and clause 2005 of Mort&H specification complete all accessories as per drawing and technical specifications. Cucm 516096.00
Cost for Super-Structure
9 Dismantle of whole super-structure Dismanting of existing structures like culverts, bridges, retaining walls and other structures comprising of masonary, cement concrete, wood work, steel work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material with all lift & lead of 1000 metres (ii) By mechanical means (B) Prestressed /Reinforced cement concrete grade M-20 & above. Cum 613.00
10 Reinforcement for Super-Structure Supplying, fitting and Placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications. Tonne 84.00 1.0605 #REF! 75035.3 #REF!
11 Concrete for I- Girder, Transverse Girder & Deck Slab Furnishing and placing reinforced/prestressed cement concrete in super-structure as per drawing and technical specification. RCC/PSC Grade M35 - Using batching palnt, transit mixer and Concrete pump. For T-Beam & Slab - Height 5m to 10m. Cum 857.80
12 New Hand Railing Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centr to centre spacing between vertical post not to exceed 2000mm, leaving adequatespace between vertical post for expansion, complete as per approved drawings and technical specifications. Metre 198.00
13 Road Studs Road aluminium stud with micro prismatic lens reflector (with shank) 100X100mm. Each 198.00
14 Road Deleators Deleneators from ISI certified firm as per the standard drawing given in IRC -79. Each 99.00
15 New Road Work Providing and applying tack coat with bitumen emulsion using emulsiuon pressure distribiutor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 743.00
16 Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Drainage spout complete as per drawing and technical specification. No. 32.00
17 New Road Work Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum 37.00
18 New Expansion Joint Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standarad specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation. RM 55.00
19 New Expansion Joint Portion Providing and placing high strength, non shrink, pre- packed, free flow micro concrete having compressive strength of 60 MPa at 28 days (compresssive strength of one day should not be less than 25 MPa) . The micro concrete mix shall be prepared by mixing high strength, non shrink, pre- packed, free flow micro concrete powder with well graded cleaned crushed aggregates of 10mm & down size (Aggregates should be less than 10mm but retained on 3.36mm) in proportion of 2:1 (Two part pre-packed micro concrete powder : one part stone aggregates) by weight for repairing excessively damaged area of structural elements/Jacketing work/expansion joint repair etc. excluding reinforcement but including scaffolding, curing as per manufacturer's specificatons inclusive of all labours, materials, equipments etc. all complete as per directions of Engineer-in-Charge. (Note:-High strength, Non shrink, prepacked, free flow micro concrete powder content considered in this item is 1450 kg/cum). Cum 17.00
Cost for Protective Coating After Repairing
20 Overall Bridge Painting Providing and painting with approved quality two or more coats of anti-carbonation paint, single component, flexible, elastomeric coating based on acrylic co-polymer coating and compatible primer coat as per manufacturer’s specifications and the direction of Engineer-in-Charge over un-plastered concrete surface of piers and superstructures after cleaning and removing dirt, dust, oil, grease, efflorescence to obtain an even surface and applying paint @0.44 kg per sqm and primer @ 0.22 kg per sqm, total dry film thickness (DFT) of the coating shall not be less than 150 microns including all scaffolding, testing of materials etc necessary tools, plants, machinery with all leads, lifts and depths and all related operations as required to complete the work as per drawings, specifications and directions of Engineer- in- Charge. Note:- The work shall be carried out only through approved applicator of manufacturer. The manufacturer/ applicator shall provide a guarantee of satisfactory performance of anti carbonation coating for 5 years through contractor. Sqm 3333.00
Cost for Approach Road
21 Removal of old Flexible Pavement Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately by Manual Means
21.1 Bituminous courses Cum 142.00
21.2 Granular courses Cum 284.00
22 Constrcution of New Granular Sub-Base Granular Sub-Base with Graded Material (Table:- 400-1). Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material Cum 284.00
23 Application of WMM Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Cum 284.00
24 Application of Primer coat over WMM Prime Coat over WMM/WBM: Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Sqm 1421.00
25 Application of Tack Coat Tack Coat in approach complete:
25.1 Tack Coat on Bituminous surfaces: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 1421.00
25.2 Tack Coat on Granular surfaces treated with primer: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 1421.00
26 Application of New Dense graded Bituminous Macadam Dense graded Bituminous Macadam Grading-II: Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. Cum 85.00 0.1039487179 164.7888631
27 Application of New Bituminous concrete Grading Bituminous concrete Grading- II: Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum 57.00
28 Road Marking with Hot Applied Thermoplastic Compound Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 . The finished surface to be level, uniform and free from streaks and holes.) Sqm 60.00
1. Civil Cost (A)
2. Add 4% for Price Escalation on (A)
3.Total B = (1+2)
4. Add 1% for LWC on (B)
5. Seignorae (Lumsum)
6. Total C = (3+4+5)
7. Add 18% GST on (C)
8. Add 7% Centage upto 10cr on (B)
9. Total D = (6+7+8)
Grand Total D - Say
Cost for Super-Structure
9 Dismantle of whole super-structure Dismanting of existing structures like culverts, bridges, retaining walls and other structures comprising of masonary, cement concrete, wood work, steel work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material with all lift & lead of 1000 metres (ii) By mechanical means (B) Prestressed /Reinforced cement concrete grade M-20 & above. Cum 613.00 1125.10 689686.30 Sr.No. 2.04(B) - Page No. 27
10 Reinforcement for Super-Structure Supplying, fitting and Placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications. Tonne 84.00 84540.82 7101428.88 Sr.No. 14.02 - Page No. 266 & Rate Analysis
11 Concrete for I- Girder, Transverse Girder & Deck Slab Furnishing and placing reinforced/prestressed cement concrete in super-structure as per drawing and technical specification. RCC/PSC Grade M35 - Using batching palnt, transit mixer and Concrete pump. For T-Beam & Slab - Height 5m to 10m. Cum 857.80 9276.76 7957605.85 Sr.No. 14.01.D.ii - Page No. 264 & Rate Analysis
12 New Hand Railing Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centr to centre spacing between vertical post not to exceed 2000mm, leaving adequatespace between vertical post for expansion, complete as per approved drawings and technical specifications. Metre 198.00 2098.10 415423.80 Sr.No. 14.06 - Page No. 266
13 Road Studs Road aluminium stud with micro prismatic lens reflector (with shank) 100X100mm. Each 198.00 209.95 41570.10 Schedule-M/Morth-1A - M062 - Page No. xxxvii
14 Road Deleators Deleneators from ISI certified firm as per the standard drawing given in IRC -79. Each 99.00 600.00 59400.00 Schedule-M/Morth-1A - M092 - Page No. xxxviii
15 New Road Work Providing and applying tack coat with bitumen emulsion using emulsiuon pressure distribiutor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 743.00 21.30 15825.90 Sr.No. 5.02(iii) - Page No. 197
16 Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Drainage spout complete as per drawing and technical specification. No. 32.00 6166.20 197318.40 Sr.No. 14.09 - Page No. 267
17 New Road Work Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum 37.00 13298.89 492059.08 Sr.No. 5.05(B) - Page No. 199 & Rate Analysis
18 New Expansion Joint Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standarad specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation. RM 55.00 14165.60 779108.00 Sr.No. 14.21 - Page No. 269
19 New Expansion Joint Portion Providing and placing high strength, non shrink, pre- packed, free flow micro concrete having compressive strength of 60 MPa at 28 days (compresssive strength of one day should not be less than 25 MPa) . The micro concrete mix shall be prepared by mixing high strength, non shrink, pre- packed, free flow micro concrete powder with well graded cleaned crushed aggregates of 10mm & down size (Aggregates should be less than 10mm but retained on 3.36mm) in proportion of 2:1 (Two part pre-packed micro concrete powder : one part stone aggregates) by weight for repairing excessively damaged area of structural elements/Jacketing work/expansion joint repair etc. excluding reinforcement but including scaffolding, curing as per manufacturer's specificatons inclusive of all labours, materials, equipments etc. all complete as per directions of Engineer-in-Charge. (Note:-High strength, Non shrink, prepacked, free flow micro concrete powder content considered in this item is 1450 kg/cum). Cum 17.00 50820.00 863940.00 Market Rate Analysis
Cost for Protective Coating After Repairing
20 Overall Bridge Painting Providing and painting with approved quality two or more coats of anti-carbonation paint, single component, flexible, elastomeric coating based on acrylic co-polymer coating and compatible primer coat as per manufacturer’s specifications and the direction of Engineer-in-Charge over un-plastered concrete surface of piers and superstructures after cleaning and removing dirt, dust, oil, grease, efflorescence to obtain an even surface and applying paint @0.44 kg per sqm and primer @ 0.22 kg per sqm, total dry film thickness (DFT) of the coating shall not be less than 150 microns including all scaffolding, testing of materials etc necessary tools, plants, machinery with all leads, lifts and depths and all related operations as required to complete the work as per drawings, specifications and directions of Engineer- in- Charge. Note:- The work shall be carried out only through approved applicator of manufacturer. The manufacturer/ applicator shall provide a guarantee of satisfactory performance of anti carbonation coating for 5 years through contractor. Sqm 3333.00 263.70 878912.10 Market Rate Analysis
Cost for Approach Road
21 Removal of old Flexible Pavement Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately by Manual Means
21.1 Bituminous courses Cum 142.00 857.70 121793.40 Sr.No. 2.05(i)A - Page No. 28
21.2 Granular courses Cum 284.00 618.20 175568.80 Sr.No. 2.05(i)B - Page No. 28
22 Constrcution of New Granular Sub-Base Granular Sub-Base with Graded Material (Table:- 400-1). Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material Cum 284.00 1457.60 413958.40 Sr.No. 4.01A(i) - Page No. 120
23 Application of WMM Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Cum 284.00 1503.70 427050.80 Sr.No. 4.14(A)- Page No. 125
24 Application of Primer coat over WMM Prime Coat over WMM/WBM: Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Sqm 1421.00 48.70 69202.70 Sr.No. 5.01(i)- Page No. 197
25 Application of Tack Coat Tack Coat in approach complete:
25.1 Tack Coat on Bituminous surfaces: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 1421.00 14.60 20746.60 Sr.No. 5.02(i)- Page No. 197
25.2 Tack Coat on Granular surfaces treated with primer: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm 1421.00 17.90 25435.90 Sr.No. 5.02(ii)- Page No. 197
26 Application of New Dense graded Bituminous Macadam Dense graded Bituminous Macadam Grading-II: Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects. Cum 85.00 11560.10 982608.62 Sr.No. 5.04(B) - Page No. 198 & Rate Analysis
27 Application of New Bituminous concrete Grading Bituminous concrete Grading- II: Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum 57.00 13298.89 758036.96 Sr.No. 5.05(B) - Page No. 199 & Rate Analysis
28 Road Marking with Hot Applied Thermoplastic Compound Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 . The finished surface to be level, uniform and free from streaks and holes.) Sqm 60.00 712.20 42732.00 Sr.No. 8.13 - Page No. 388
1. Civil Cost (A) 26222713.55
2. Add 4% for Price Escalation on (A) 1048908.54
4. Add 1% for LWC on (B) 272716.22
5. Seignorae (Lumsum) 272716.22
8. Add 7% Centage upto 10cr on (B) 1909013.55
Grand Total D - Say 34733138.00
Computation of Quantities
Name of work: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar.
Item No. Description of items Unit Nos Length (M) Width (M) Height (M) K Qty
1 Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer- In-Charge Average Thickness =50 mm Sqm
Abutment A1 1 6.00 6.00 36.00
Pier & Pier Cap P1 1 8.00 8.00 64.00
Pier & Pier Cap P2 1 8.00 8.00 64.00
Pier & Pier Cap P3 1 8.00 8.00 64.00
Abutment A2 1 6.00 6.00 36.00
2 Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint RM
Total spalling with exposed reinforcement (sqm) 264.00
2.1 Bars upto 12 mm diameter
For qty refer item no. 1
Assuming 6m bars per sqm of area 1 6.00 264.00 1584.00
2.2 Bars above 12 mm diameter
For qty refer item no. 1
Assuming 10m bars per sqm of area 1 10.00 264.00 2640.00
3 Providing and applying of anticorrosive treatment to exposed structural reinforcement by two coats of IPNET RB or equivalent application with time interval of minimum 8 -10 hours between each coat after application of two coats of alkaline rust converting primer confirming to ASTM-B-117. The application shall be done by brush or spray after cleaning existing reinforcement with wire/ rotary wire brush to make the surfaces free from loose material, dirt etc. inclusive of all labour, materials, equipment etc. complete as per specifications and instructions of Engineer in Charge. (Surface area of member shall be measured for payment purpose). Sqm
For qty refer item no. 1 264.00 264.00
4 Epoxy bonding of new concrete to old concrete. Sqm
Same as item No-1 264.00 264.00
5 Sealing of crack/porous concrete with epoxy grout by injection thorugh nipples complete as per clause 2803.1 . Kg
For qty refer item no. 6
Assuming 1kg epoxy grout per number of nozzle 1.00 516.00 516.00
6 Providing and inserting nipples with approved fixinjg compound after drilling holes for grouting as per technical specifications including subsequent cutting/ removal and sealing of hole as necessary of nipples sfter completion of grouting with cement/epoxy. Each
Abutment, Pier & Pier Cap
Abutment A1 1 12.00 2.00 24.00
Abutment A2 1 12.00 2.00 24.00
Assuming 2 nos. Nozzles per sqm area 2 258.00 516.00
7 Applying pre-packed cement based polymer mortar of strength 45 Mpa at 28 days for replacement of spalled concrete. Sqm
Same as item No-1 264.00 264.00
8 Supplying,fiiting and fixing in position true to line and level eleastomeric bearing conforming to IRC:83 (Part-II) sextion-IX and clause 2005 of Mort&H specification complete all accessories as per drawing and technical specifications. Cucm
Total 516096.00
9 Dismanting of existing structures like culverts, bridges, retaining walls and other structures comprising of masonary, cement concrete, wood work, steel work including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material with all lift & lead of 1000 metres (ii) By mechanical means (B) Prestressed /Reinforced cement concrete grade M-20 & above. Cum
As per Standard Plans For Highway Bridges - Vol. III (Concrete T-Beam Bridges) - Effective Span length - 24.75m
Hand Railing - Column 144 1 0.2 0.2 5.76
Hand Railing - Beam 408 1.5 0.2 0.2 24.48
Wearing Course 1 99 7.5 0.05 37.13
10 Supplying, fitting and Placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications. Tonne
As per Standard Plans For Highway Bridges - Vol. III (Concrete T-Beam Bridges) - Effective Span length - 24.75m
11 Furnishing and placing reinforced/prestressed cement concrete in super-structure as per drawing and technic al specification. Cum
RCC/PSC Grade M35 - Using batching palnt, transit mixer and Concrete pump. For T-Beam & Slab - Height 5m to 10m
As per Standard Plans For Highway Bridges - Vol. III (Concrete T-Beam Bridges) - Effective Span length - 24.75m
12 Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centr to centre spacing between vertical post not to exceed 2000mm, leaving adequatespace between vertical post for expansion, complete as per approved drawings and technical specifications. Metre
Length of Bridge Towards Cheful Side 1 24.75 4.00 99.00
Length of Bridge Towards Phulwara Side 1 24.75 4.00 99.00
13 Road aluminium stud with micro prismatic lens reflector (with shank) 100X100mm. Each
Total Bridge Both Side - 100mm C/C 2 99.00 198.00
14 Deleneators from ISI certified firm as per the standard drawing given in IRC -79. Each
Total Bridge Center - 100mm C/C 1 99.00 99.00
15 Providing and applying tack coat with bitumen emulsion using emulsiuon pressure distribiutor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm
16 Drainage spout complete as per drawing and technical specification. No.
As per Standard Plans For Highway Bridges - Vol. III (Concrete T-Beam Bridges) - Effective Span length - 24.75m
Per Span 4 nos - both side - total 8 nos 8 4.00 32.00
17 Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum
18 Providing and laying of strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standarad specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation. RM
A1 Expansion joint 1 11.00 11.00
P1 Expansion joint 1 11.00 11.00
P2 Expansion joint 1 11.00 11.00
P3 Expansion joint 1 11.00 11.00
A2 Expansion joint 1 11.00 11.00
19 Providing and placing high strength, non shrink, pre-packed, free flow Cum
A1 Expansion joint 1 11.00 1.00 0.30 3.30
P1 Expansion joint 1 11.00 1.00 0.30 3.30
P2 Expansion joint 1 11.00 1.00 0.30 3.30
P3 Expansion joint 1 11.00 1.00 0.30 3.30
A2 Expansion joint 1 11.00 1.00 0.30 3.30
20 Providing and painting with approved quality two or more coats of anti- carbonation paint, single component, flexible, elastomeric coating based on acrylic co-polymer coating and compatible primer coat as per manufacturer’s specifications and the direction of Engineer-in-Charge over un-plastered concrete surface of piers and superstructures after cleaning and removing dirt, dust, oil, grease, efflorescence to obtain an even surface and applying paint @0.44 kg per sqm and primer @ 0.22 kg per sqm, total dry film thickness (DFT) of the coating shall not be less than 150 microns including all scaffolding, testing of materials etc necessary tools, plants, machinery with all leads, lifts and depths and all related operations as required to complete the work as per drawings, specifications and directions of Engineer- in-Charge. Note:- The work shall be carried out only through approved applicator of manufacturer. The manufacturer/ applicator shall provide a guarantee of satisfactory performance of anti carbonation coating for 5 years through contractor. Sqm
Abutment A1 1 11.00 3.00 33.00
Pier & Pier Cap P1 1 14.00 5.00 70.00
Pier & Pier Cap P2 1 14.00 5.00 70.00
Pier & Pier Cap P3 1 14.00 5.00 70.00
Abutment A2 1 11.00 3.00 33.00
I-Girder - All Spans 12 5.60 24.75 1663.20
Transverse Girder - All Spans 32 2.85 3.00 273.60
Deck Slab - All Spans 4 24.75 11.00 1089.00
Bearing Pedestal - Abutment 6 2.80 0.20 3.36
Bearing Pedestal - Pier 9 4.20 0.20 7.56
Seismic Arrester 10 2.50 0.80 20.00
21 Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Cum
21.1 Bituminous courses - Approach Both ends
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.10 26.85
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.10 84.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.10 31.25
21.2 Granular courses - Approach Both ends
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.20 53.70
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.20 168.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.20 62.50
22 Granular Sub-Base with Graded Material (Table:- 400-1). Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material Cum
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.20 53.70
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.20 168.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.20 62.50
23 Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Cum
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.20 53.70
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.20 168.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.20 62.50
24 Prime Coat over WMM/WBM: Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Sqm
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 1.00 268.50
After Straight portion (Width = 7.0m) 2 60.00 7.00 1.00 840.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 1.00 312.50
25 Tack Coat in approach complete:
25.1 Tack Coat on Bituminous surfaces: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 1.00 268.50
After Straight portion (Width = 7.0m) 2 60.00 7.00 1.00 840.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 1.00 312.50
25.2 Tack Coat on Granular surfaces treated with primer: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Sqm
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 1.00 268.50
After Straight portion (Width = 7.0m) 2 60.00 7.00 1.00 840.00
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 1.00 312.50
26 Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Cum
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.06 16.11
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.06 50.40
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.06 18.75
27 Bituminous concrete Grading- II: Prividing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alighnment, rolling with smooth wheeled, vibratory and tendom rollers to achieve the desired compaction as per MORT&H specification clause npo. 507 complete in all respects. Cum
Straight portion upto 15m (Width = 10.90m to 7.0m) 2 15.00 8.95 0.04 10.74
After Straight portion (Width = 7.0m) 2 60.00 7.00 0.04 33.60
End portion (Width = 7.0m to 5.5m) 2 25.00 6.25 0.04 12.50
28 Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 . The finished surface to be level, uniform and free from streaks and holes.) Sqm
Market Rate List
S. Nos. Item Unit M/R Rate
(A) Labour As per Bihar SOR Revised Labour Rates - 30.09.2022
1 Mate Day 403.00
2 Mazdoor Day 373.00
3 Mazdoor Skilled Day 472.00
4 Highly skilled labour Day 577.00
5 Mason 1st class skilled Day 503.00
6 Mason 2nd class Day 449.00
7 Painter Grade 1 Day 476.00
(B) Material As per Present Market Rates - April 23 Onwards
1 Micro concrete Kg 15.00
2 Coarse Sand Cum 1800.00
3 10mm down aggregate Cum 1800.00
4 Anticarbonation paint [ BASF] Ltr. 195.00
5 Primer under anticarbonation paint [BASF] Ltr. 90.00
6 Alkaine rust converted primer Kg 155.00
7 Epoxy based anti corrosive Kg 275.00
8 16mm Drill bit Cost (10.nos drill per drill bit) No 180.00
9 14mmX150 mm size Hilti Anchor Bolt with chemical Grout (HIT-RE 500 GS Bolt) Each 155.00
(C) Machinery As per Bihar SOR Machine Rental Rates - 25.02.2021
1 Concrete Mixer - 1 cum Hour 344.00
2 Hire charges of Drill Machine Hour 50.00
The rates are prevailing market rates
Analysis of Rates
It. No. Description Unit Quantity Rate Rs Cost Rs
3 Providing and applying of anticorrosive treatment to exposed structural reinforcement by two coats of IPNET RB or equivalent application with time interval of minimum 8 -10 hours between each coat after application of two coats of alkaline rust converting primer confirming to ASTM-B-117. The application shall be done by brush or spray after cleaning existing reinforcement with wire/ rotary wire brush to make the surfaces free from loose material, dirt etc. inclusive of all labour, materials, equipment etc. complete as per specifications and instructions of Engineer in Charge. (Surface area of member shall be measured for payment purpose).
Talking output = 10 Sqm
Mazdoor Day 1.00 373.00 373.00
Mazdoor Skilled Day 1.00 472.00 472.00
b) Materials (As per manufacturers specifications)
Alkine rust converter primer conforming to ASTM-B- 117 Kg 1.25 195.00 243.75
Epoxy based anti corrosive treatment (IPNET) Kg 2.50 275.00 687.50
Total (a+b) 1977.75
Add 18% GST on work contract by reversible method (multiplied by 0.2790) 551.79
30% Overhead charges 758.86
10% Contractor' profit 328.84
Cost for10 sqm 3617.25
Rate per Sqm 361.72
Add 1% for Labour Welfare Cess 3.62
Assuming area of steel equivalent to 30% of surface area of member i.e chipped concrete surface beam,column,girder,pier or slab shall be measured for payment purpose 0.30 365.34 109.60
Cost per sqm Total 109.60
19 Providing and placing high strength, non shrink, pre-packed, free flow micro concrete having compressive strength of 60 MPa at 28 days (compresssive strength of one day should not be less than 25 MPa). The micro concrete mix shall be prepared by mixing high strength, non shrink, pre- packed, free flow micro concrete powder with well graded cleaned crushed aggregates of 10mm & down size (Aggregates should be less than 10mm but retained on 3.36mm) in proportion of 2:1 (Two part pre-packed micro concrete powder : one part stone aggregates) by weight for repairing excessively damaged area of structural elements/Jacketing work/expansion joint repair etc. excluding reinforcement but including scaffolding, curing as per manufacturer's specificatons inclusive of all labours, materials, equipments etc. all complete as per directions of Engineer-in- Charge. (Note:-High strength, Non shrink, prepacked, free flow micro concrete powder content considered in this item is 1450 kg/cum).
Taking density of fresh micro concrete with powder only 2250 kg/cum
pre-packed high strength, free flow micro concrete of strength 60 Mpa or more at 28 days (1450/2.79x1000=0.52 cum) taken 2.79 SG for powder. Kg 1450.00 15.00 21750.00
Water 1450 x 0.15 =220 Ltr. =0.22 cum
Cleaned well graded crushed aggregate (712.40 x 2.74 x 1000 = 0.26 cum) taken 2.74 SG for powder (0.52+0.22+0.26=1.00 cum) Cum 0.45 1800.00 810.00
Mason 1st Class Day 0.50 503.00 251.50
Mazdoor Day 1.00 373.00 373.00
c) Concrete mixture Hour 0.5 344.00 172.00
Total (a)+(b)+(c) 23558.00
Add 18% GST on work contract by reversible method (multiplied by 0.2790) 6572.68
Add for 30% Overheads 9039.20
Add for 10% CP 4574.26
Cost per cum 50316.83
Add 1% LWC 503.17
20 Providing and painting with approved quality two or more coats of anti-carbonation paint, single component, flexible, elastomeric coating based on acrylic co-polymer coating and compatible primer coat as per manufacturer’s specifications and the direction of Engineer-in-Charge over un- plastered concrete surface of piers and superstructures after cleaning and removing dirt, dust, oil, grease, efflorescence to obtain an even surface and applying paint @0.44 kg per sqm and primer @ 0.22 kg per sqm, total dry film thickness (DFT) of the coating shall not be less than 150 microns including all scaffolding, testing of materials etc necessary tools, plants, machinery with all leads, lifts and depths and all related operations as required to complete the work as per drawings, specifications and directions of Engineer- in-Charge. Note:- The work shall be carried out only through approved applicator of manufacturer. The manufacturer/ applicator shall provide a guarantee of satisfactory performance of anti carbonation coating for 5 years through contractor.
Taking output = 10 sqm
a) Labour (1/4 labour)
Mazdoor Day 0.25 373.00 93.25
Painter Grade 1 Day 0.50 476.00 238.00
Anti carbonation paint (BASF) Kg 4.40 195.00 858.00
Primer under Anti carbonation paint [BASF] Kg 2.20 90.00 198.00
Total (a+b) 1427.55
Add 18% GST on work contract by reversible method (multiplied by 0.2790) 398.29
OH charges @ 30% 547.75
Contractor's profit @10% 237.36
Cost for 10 sqm 2610.95
Rate per sqm (a+b+c+d)/10 261.09
Add 1% for Labour Welfare Cess 2.60
Sr no Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Description unit Quantity as per project category Rate Amount input Ref.
14.02 Sec. 1600 Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Taking output = 8MT
HYSD Bars including 5 percent overlaps and wastage tonne 8.40 58030.00 487452.00 M-083
Binding Wires kg 48.00 46.00 2208.00 M-072
b) Labour for straightening, cutting, bending, shifting to site, tying and placing in position
Blacksmith day 1.00 449.00 449.00 L-01
Mazdoor day 3.00 373.00 1119.00 L13
Cutting Machine hour 8.000 358.00 2864.00 PM43001
Bending Machine hour 8.000 358.00 2864.00 PM43001
Electric generator 15KVA hour 8.000 292.00 2336.00 PM22009
Tipper for Transportation
(i) 18 cum capacity t.km 4.95 PM72001
(ii) 14 cum capacity t.km 5.67 PM72001
(iii) 10 cum capacity t.km 8.00 7.04 56.32 PM72001
Loading & Unloading Time
(i) 18 cum capacity hour 2310.00 PM63001
(ii) 14 cum capacity hour 2065.00 PM63002
(iii) 10 cum capacity hour 1.778 1847.00 3283.97 PM63003
Light weight Crane
At cutting bending yard hour 2.000 794.00 1588.00 PM63001
d) carriage way 8.00 812.10 6496.80
Total 512368.61
e) Overhead charges @ on (a+b+c+d) (@20%) 102473.72
Total 614842.33
f) Contractor's profit @ on (a+b+c+d+e) (@10%) 61484.23
Cost for 8 MT = (a+b+c+d+e+f) 676326.56
Rate for per MT = (a+b+c+d+e+f)/8 84540.82
Ref. to M. Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. unit Quantity as per project category Rate with CP Amount input Ref.
14.01D(ii) RCC/PSC Grade M35
Using Batching Plant, Transit Mixer and Concrete Pump
Taking output = 120cum
Per cum basic cost (rate taken from sub analysis 21.11) cum 120.000 4042.20 485064.00 21.12
water for curing KL 63.000 60.30 3798.90 M-191
for pouring and placing
Mazdoor day 3.300 373.00 1230.90 L13
Transit truck agitator
for transportation (6 cum capacity), L1- lead in kilometer tonne-km 300.000 10.75 3225.00 PM76001
for unloading hour 2.600 1935.00 5031.00 PM34001
Hydraulic boom placer pump hour 2.600 3769.00 9799.40 PM36001
Water tanker ( speed @20km/hr and return speed @30 km/hr and @ 30mins for uploading)
(i) 16 KL capacity hour 1171.00 PM11001
(ii) 12 KLcapacity hour 997.00 PM11002
(iii) 6 KL capacity hour 1.167 X L1 + 7 752.00 6141.58 PM11003
For formwork and staging add the following
For Form work and staging add the following
Height 5m to 10m
Basic cost of labour, material & machinery (a+b+c) for 120 cum 515040.504
d) Form work & staging 28 percent of (a+b+c) 144211.34
e) carriage way of cement 50.640 812.80 41160.19
f) carriage way of sand 54.000 919.99 49679.46
g) carriage way of stone chips 108.000 863.43 93250.44
Total 843341.937
h) Overhead charges @ on (a+b+c+d+e+f+g) (@20%) 168668.39
Total 1012010.32
i) Contractor's profit @ on (a+b+c+d+e+f+g+h) (@10%) 101201.03
Cost for 120 cum = (a+b+c+d+e+f+g+h+i) 1113211.36
Rate for per cum = (a+b+c+d+e+f+g+h+i)/120 9276.76
Sr no Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Description Quantity as per project category Rate Amount input Ref. Input Ref
Bituminous Macadam Grading- II
5.04 5.05 B Dense graded Bituminous Macadam Grading- II: Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @4.5 percent by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 505 complete in all respects.
Taking output= 195 cum
Mazdoor skilled day 5.000 472.00 2360.00 L-15
(i) HMP 200 TPH hour
(ii) HMP 160 TPH hour
Mechanical broom (2.1m sweeping width) hour 0.663 794.00 526.42 PM23001
Air compressor 250 cfm hour 0.663 440.00 291.72 PM15001
Paver finisher hydrostatic with sensor control compatible with hot mix plant
(i) Paver (240 HP) hour PM29001
(ii) Paver (240 HP) hour PM29001
Electric generator
(i) 500 KVA hour PM22003
(ii) 400 KVA hour PM22003
Front end loader for feeding the plant
(i) 3.1 cum Capacity hour PM5001
(ii) 2.1 cum Capacity hour PM5002
(iii) 1 Cum Capacity hour 15.799 1419.00 22418.78 PM5003
Tipper for transportation
(i) 18 cum Capacity t.km PM72001
(ii) 14 cum Capacity t.km PM72001
(iii) 10 Cum Capacity t.km 450.45xL1 7.04 3171.17 PM74001
For loading & Unloading time
(i) 18 cum Capacity hour PM6001
(ii) 14 cum Capacity hour PM6002
(iii) 10 Cum Capacity hour 10.010 1847.00 18488.47 PM6003
Smooth steel wheeled tandem roller for static and vibratory passages hour 9.663 2053.00 19838.14 PM9001
i) Bitumen @ 4.5 percent of mix tonne 20.270 60218.00 1220618.86 M-074
Total weight of mix = 450.45 tonnes
Weight of bitumen= 20.27 tonnes
Weight of aggregate = 430.18 tonnes
Taking density of aggregate= 1.5 tonne/ cum
*Grading II 26.5 mm (Nominal size)
5mm and below 40 percent cum 114.715 429.97 49324.01 M-029
Filler @ 2percent of weight of aggregates tonne 8.604 3000.00 25812.00 M-190
* Any one of the alternative may be adopted asper approved design
Total cost( Without O.H&C.P.) 1795115.81
d) Carriage way with CP 24.341 1421.80 34608.0338
Total 1829723.84
e) Overhead charges on (a+b+c+d) (@12%) 219566.86
Total 2049290.71
f) Contractor's profit on (a+b+c+e) (@10%) 204929.07
Cost for 195 cum = a+b+c+d+e+f 2254219.78
Rate per cum = (a+b+c+d+e+f)/195 11560.10
Sr no Project Name: Repair and Major Rehabilitation of Tajpur Pul, Chapra, Bihar. Description Quantity as per project category Rate Amount input Ref. Input Ref
Bituminous concrete Grading- II
5.05 5.07 B Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 percent of mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment , rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause no. 507 complete in all respects.
Taking output= 191 cum
Mazdoor day 6.000 373.00 2238 L-13
Mazdoor skilled day 5.000 472.00 2360 L-15
(i) HMP 200 TPH hour
(ii) HMP 160 TPH hour
Mechanical broom (2.1m sweeping width) hour 1.624 794.00 1289.46 PM23001
Air compressor 250 cfm hour 1.624 440.00 714.56 PM15001
Paver finisher hydrostatic with sensor control compatible with hot mix plant
(i) Paver (240 HP) hour PM29001
(ii) Paver (240 HP) hour PM29001
Electric generator
(i) 500 KVA hour PM22003
(ii) 400 KVA hour PM22003
Front end loader for feeding the plant
(i) 3.1 cum Capacity hour PM5001
(ii) 2.1 cum Capacity hour PM5002
(iii) 1 Cum Capacity hour 15.553 1419.00 22069.71 PM5003
Tipper for transportation
(i) 18 cum Capacity t.km PM72001
(ii) 14 cum Capacity t.km PM72001
(iii) 10 Cum Capacity t.km 450.76xL1 7.04 3173.35 PM72001
For loading & Unloading time
(i) 18 cum Capacity hour PM6001
(ii) 14 cum Capacity hour PM6002
(iii) 10 Cum Capacity hour 10.017 1847.00 18501.40 PM6003
Smooth steel wheeled tandem roller for static and vibratory passages hour 16.902 2053.00 34699.806 PM9001
Pneumatic tyre roller hour 4.007 2062.00 8262.43 PM10001
i) Bitumen @ 5.4 percent of mix tonne 24.341 60218.00 1465766.34 M-074
Total weight of mix = 450.76 tonnes
Weight of bitumen= 24.34 tonnes
Weight of aggregate = 426.42 tonnes
Taking density of aggregate= 1.5 tonne/ cum
*Grading II 13mm (Nominal size)
5mm and below 60 percent cum 170.568 429.97 73339.12 M-029
Filler @ 2percent of weight of aggregates tonne 8.528 3000.00 25584.00 M-190
* Any one of the alternative may be adopted asper approved design
Total cost( Without O.H&C.P.) 2027152.327
d) Carriage way with CP 24.341 1421.80 34608.0338
e) Overhead charges on (a+b+c+d) (@12%) 247411.24
Total 2309171.60
f) Contractor's profit on (a+b+c+d+e) (@10%) 230917.16
Cost for 191 cum = a+b+c+d+e+f 2540088.76
Rate per cum = (a+b+c+d+e+f)/191 13298.89
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NITTc.pdf
NIT • 2.32 MB
Annex.pdf
NIT • 0.86 MB
Technical Bid 4th call.xls
NIT • 0.03 MB
BOQ 4th tender.xlsx
NIT • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .