| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.9 LAccepted-AOC TAMTA MOHALLA ALMORA | ALMORA | ALMORA | UTTARAKHAND | ₹74.9 L | L1 | Accepted-AOC Overall accepted as L1 bidder |
| 2 | L2₹83.8 LRejected-Finance 288 RANIPUR MORE HARIDWAR 249401 | HARIDWAR | UTTARAKHAND | 249401 | ₹83.8 L | L2 | Rejected-Finance The bidder did not qualifies |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualifies TQR |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-The bidder did not submit tender document in original with tender cost and EMD. |
| 5 | Not Admitted-Fee/PreQual/Technical POLICE LINE ROAD KUMOUR PITHORAGARH | - | - | Not Admitted-Fee/PreQual/Technical Others-The bidder did not submit tender document in original with tender cost and EMD. |
| Sl No | Description | Qty | Unit | United Engineers L2 | HILL CONSTRUCTION COMPANY AND OTHER L1 |
|---|---|---|---|---|---|
| 1.00Part-A (Supply) | |||||
| 2.00 | Supply of 145 KV Current Transformer Single Phase Ratio 200/100/1A. | 3 | Nos. | 2,90,000 ₹8.7 L | 2,76,500 ₹8.3 L |
| 3.00 | Supply 33KV Circuit Breaker VCB 3 Phase along with Support Structure. | 1 | Nos. | 5,00,000 ₹5 L | 4,91,500 ₹4.9 L |
| 4.00 | Supply of 120 KV Lightning Arrester. | 3 | Nos. | 1,20,000 ₹3.6 L | 1,15,000 ₹3.5 L |
| 5.00 | Supply of 30 KV Lightning Arrester. | 3 | Nos. | 24,000 ₹72,000 | 24,000 ₹72,000 |
| 6.00 | Supply of MS Flat 50x6mm. | 0.2 | MT | 1,30,900 ₹26,180 | 1,30,900 ₹26,180 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
12 Jan 2026, 5:00 pmClosed
Chief Engineer
Office of Chief Engineer (OandM), PTCUL, Haldwani
Shifting of 20MVA, 132/33KV transformer from 132KV S/s, Ramnagar to 132KV S/s, Almora at 132KV S/s, Almora including supply and associated works under OandM Division, PTCUL, Almora
2025_PTC21_90219_1
CE/OandM/PTCUL/HLD/56/2025-26
Open Tender
Electrical Works
180 days
132KV S/s, Almora
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
EE, OandM Division, PTCUL, Almora
₹2.7 L
Office of Chief Engineer (OandM), PTCUL, Haldwani
12 Mar 2026
22 Dec 2025
13 Jan 2026
22 Dec 2025
12 Jan 2026
22 Dec 2025
9 Jan 2026
Supply of 145 KV Current Transformer Single Phase Ratio 200/100/1A.
Supply 33KV Circuit Breaker VCB 3 Phase along with Support Structure.
Supply of 120 KV Lightning Arrester.
Supply of 30 KV Lightning Arrester.
Supply of MS Flat 50x6mm.
Item Rate
Description of materail
Part-B (Work)
Carring out following statutory electrical tests and oil tests on 20 MVA Transformer at 132 KV S/s Ramnagar prior to shifting as per OEM's instructions of manual including submission of tests result/reports in 3 sets as per instruction of engineer in charge including cost of all material, consumables, labours and T&P required for the proper completion of work.
Tan Delta, SFRA & Other tests in rest position at 132 KV S/s Ramnagar.
General, DGA & Dew point tests on transformer oil.
Impact recorded fixing for tests.
Collection of empty drums (approximately 80 Nos. of 209 liter capacity each) from 220 KV S/S Pantnagar & 132 KV S/S Bhowali 132 KV S/S Ranikhet and near by sub station as availability of oil drums/15 KL oil storage Tank from near by sub station including the work of safe transportation to 132 KV S/S Ramnagar for filling and storage of drained oil of 20 MVA transformer as per direction of engineer in charge including cost of all material, consumables, labors and T&P required for the proper completion of work.
Safe and proper shifting of departmental oil filtration plant of 12KLPH capacity from 220KV S/s, Pantnagar following substation including the work of loading, unloading, shifting, carriage etc. and making arrangements as welding de-welding, drilling, fabricating flanges etc. required to connect the oil filtration plant with 20 MVA transformer, storage tanks etc. successful filtration and transfer of oil at both ends i.e. at 132 KV S/S Ramanagar and 132 KV S/S Almora as per direction of engineer in charge including cost of all material, consumables, labours and T&P required for the proper completion of work.
220 KV S/S Pantnager to 132 KV S/S Ramnagar
132KV S/S Ramnagar to 132 KV S/S Almora
132 KV S/S Almora to 220 KV S/S Pantnagar
Safe and proper draining of oil from 20 MVA transformer's main tank as per standard procedures and OEM's instructions manual with the help of oil filtration plant and proper storage of drained oil filtration plant and including cost of all material, consumables, labors and T&P required for the proper completion of work.
Filling up of nitrogen gas of adequate pressure in main tank of 20 MVA transformer after closing of all the inspection window and all parts as per the OEM's instruction manual as well as additional arrangement for filling of nitrogen gas and availability of adequate spare nitrogen cylinder for maintaining nitrogen pressure during transportation including making of the separate arrangements for nitrogen pressure gauge monitoring as per direction of engineer in charge including cost of all material, consumables, labors and T&P required for the proper completion of work .
Fixing packaging and sealing of all the opening of transformer parts and accessories i.e bushing turrets, conservator tank, equalizer oil pipe line, all flanges before its transportation with the help of nut & bolts, washers and gaskets complete is all respect as per direction of engineer in charge including cost of all material, consumables, labors and T&P required for the proper completion of work.
Safe and proper loading of complete 20 MVA transformer , its accessories and peripherals such as main tank bushings, turret, CTs, radiators, cooling fans, complete pipe system conservator tank various relays, WTI & OTI, marshalling box, RTCC panel and its accessories and transformer oil filled drums (appx. 80 no) etc onto suitable carrier vehicles such as hydraulic trailers with the help of hydraulic jacks sleepers, hydraulic cranes, ceilings etc. and all respect as per OEM'S standard procedures and instructions of engineer in charge including cost of material, consumables, labors and T&P required for the proper completion of work.
Safe and proper transportation of complete 20 MVA transformer , its accessories and peripherals such as main tank bushings, turret, CTs, radiators, cooling fans , complete pipe system conservator tank various relays, WTI & OTI, marshalling box, RTCC panel and its accessories and transformer oil filled drums (appx. 80 no) etc in hydraulic trailer from 132 KV S/S Ramnagar to 132KV S/S Almora with all safety arrangements complete cost of all packaging , all necessary approvals and expenses as per RTO's statutory norms for shifting of such material including insurance of complete transformer & accessories, complete in all respect as per direction of engineer in charge including cost of all material, consumables, labors and T&P required for the proper completion of work.
Safe and proper unloading of complete transformer, its accessories and peripherals such as main tank bushing turret CT's radiators, cooling fans, complete pipe system, conservator tank, various relays, WTI & OTI, marshalling box, RTCC panel, and its accessories and transformer oil filled drums (appx. 80 nos) switchyard at 132 KV S/S Almora with the help of hydraulic jacks, sleepers, hydraulic cranes, ceilings etc. and all additional arrangements required for safe unloading & shifting of material complete in all respect as per OEM'S standard procedures and instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Safe and proper dragging and shifting of 20 MVA transformer inside switchyard from unloading place onto transformer plinth with the help of hydraulic jack, sleepers, ceilings etc. with all the additional arrangements required for safe dragging & shifting including shifting of other transformer accessories & peripherals such as bushing current CT'S radiators cooling fans, complete pipe system, conservator tank various relays and its accessories and transformer oil filled drums (appx . 80 no ) etc . Complete in all respect as per OEM'S standard procedures and instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Carrying out following statutory pre-erection tests on 20 MVA transformer at 132 KV S/S Almora prior to erection & commissioning of transformer as per OEM's instructions manual including submission of tests result/reports in 3 sets as per instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
SFRA test in test position on plinth at 132 KV S/S Almora
Impact Recorder Test
Safe and proper erection of 20 MVA transformer, its accessories & peripherals such as main tank, bushing turret, CT's, radiators, cooling fans, complete pipe system, conservator tank, various relays, WTI & OTI, marshalling box, RTCC panel etc. including earthing of the system complete in all respect as per OEM's instructions manual including submission of tests result / reports in 3 sets as per instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Leakage testing of 20 MVA transformer after putting on vacuum of adequate pressure and for adequate time period as per OEM's instruction manual and then safe and proper de-vacuuming of transformer and applying of nitrogen release process from complete in all respect as per OEM's instructions manual including submission of tests result / reports in 3 sets as per instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Complete replacement of all the gaskets of 20 MVA transformer main tank, inspection plates, bushings, radiators etc. With best quality rubberized cork sheet of specified size after proper removal of old gaskets, complete in all respect as per OEM'S standard procedures and instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Centrifuging of transformer oil (quantity approx 16 KL) till satisfactory BDV result are achieved and filling up of oil in main tank, radiators etc . And topping conservator tank complete in all respect as per OEM’S standard procedures and instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work .
Development of cable schedule and termination scheme (if required) and carrying out work of cable laying termination of all connections and interconnection both outdoor and indoor end in marshalling boxes , cooling fans circuit, RTCC panel, HV & LV C&R panel etc for 20MVA Transformer as per standard practices, complete in all respect as per OEM'S standard procedures and instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Complete pre-commissioning testing of 20MVA transformer such as open circuit test shot circuit test, vector group test, stability test, insulation test, winding resistance test, tan delta tests, SFRA test and other including testing of of HV and LV side bay equipments i.e 132 KV & 33 KV CB's, 132 KV & 33 KV CT's, 132 KV & 33 KV PT's RTCC & C&R Panels etc. And submission of test reports in 03 copies jointly signed with O&M and T&C wing of PTCUL before charging of transformer, complete in all respects as per instructions of engineer in charge including cost of material, consumables, labor and T&P required for the proper completion of work.
Safe and proper jumpering work of transformer with its HV and LV side bays i.e. all equipments and bus bars etc. Including all HT/LT connection complete in all respect and charging of transformer as per direction of engineer in charge after obtaining statutory clearance from EL including cost of material, consumables, labor and T&P required for the proper completion of work.
Collection of oil samples of transformer and its testing for DGA and other relevant tests from CPRI as per direction of engineer in charge including cost of all material, consumables, labor and T&P required for the proper completion of work and submission of reports in 03 copies at the earliest .
Erection of 30 KV LA at 132KV S/S Almora.
Erection of 120 KV LA at 132KV S/S Almora.
Erection of 145 KV CT at 132KV S/S Almora.
Erection 33KV Circuit Breaker VCB 3 Phase with Structure at 132KV S/S Almora.
Erection Transformer C&R Protection Panel(HV&LV).
Earth work in surface excavation including disposal of excavated earth up to 50 mtr and lift up to 1.5 mtr disposed soil to be leveled and nearly dressed. a) In Ordinary Soil/Earth mixed with boulders
Providing & Laying in position Cement Concrete of specified grade including cost of Centering & shuttering all work up to plinth level 1:2:4 (1 Cement : 2 coarse sand: 4 graded stone aggregate 20mm nominal size.
Providing & laying in position Cement Concrete of specified grade including cost of Centering & shuttering all work up to plinth level. 1:1.5:3 (1 Cement : 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size
Earthing using MS Flat 50x6
Item Rate
Particulars
Total Part-A (Supply ) from BoQ1 sheet WITHOUT GST
Total Part-B (Erection) from BoQ2 sheet WITHOUT GST
Add GST* Amount on (Total of Part-A + Total of Part-B above)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderDocument56.pdf
Tender Documents • 1.19 MB
PQRSheet56.xls
Other Document • 0.14 MB
TechnicalSpecification56.pdf
Additional Documents • 0.85 MB
BOQ_106893.xls
BOQ • 0.35 MB