Tender Value
₹7.4 Cr
EMD Value
₹5.2 L
Closing Date
19 Dec 2025, 3:30 pmClosed
(I) Chakradharpur Division - 35197 Meter of Cess Repair work between TATA-OND and OND-BMPR under the Jurisdiction of Sr.DEN(East)/CKP. (II) Cutting of cess, repairing of cess and construction of side drain between section TATA - ASB under jurisdiction of ADEN/I/TATA. (III)Cutting of Cess, repairing of cess and construction of side drain under jurisdiction of ADEN-II-TATA.
CKP-EAST-25-26-43~SER
CKP-EAST-25-26-43
Open
Works - General
18 Months
Mayurbhanj, Odisha
₹0
₹5.2 L
19 Dec 2025
26 Nov 2025
5 Dec 2025
A-Execution of all works as per (Item Directory -SER-HQ-IR- Above/
B-Execution of all works as per
Item Breakup - A-Execution of all works as per (Item Directory -SER-HQ-IR-USSOR 2021-3-Ver-1)
70394.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 26179019.15 Execution of all works as per (Item Directory -SER-HQ-IR-USSOR 2021-3-Ver-1) (Item Directory -SER- Item- 2 HQ-IR-USSOR 2021-3-Ver-1) (Cess cutting and cess repair work and Construction of side drain between TATA-ASB section) S No. Item Description of Item Unit Qty Rate Amount No CKP-DIVN-ENGG/SOUTH EASTERN RLY Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
35000.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 13824750.00 Execution of all works as per (Item Directory -SER-HQ-IR-USSOR 2021-3-Ver-1) (Item Directory -SER- Item- 3 HQ-IR-USSOR 2021-3-Ver-1) (Cess cutting and cess repair work and Construction of side drain in different patches between TATA-SINI-RKSN KND-CNI section) S No. Item Description of Item Unit Qty Rate Amount No CKP-DIVN-ENGG/SOUTH EASTERN RLY Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
14670.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 13636980.60
Item Breakup - B-Execution of all works as per
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TRACKWORKCONDITIONS1.pdf
ATTACHMENT
ANNEXUREVIAforBIDSECURITY.pdf
ATTACHMENT
ANNEXUREVIBforFINANCIALCRITERIA.pdf
ATTACHMENT
DECLARATIONOFRETDRLYEMPLOYEE.pdf
ATTACHMENT
VendorMandateForm.pdf
ATTACHMENT
ConditionforLCCredit.pdf
ATTACHMENT
Annexure-VANEW.pdf
ATTACHMENT
Tele_Cir_9-2023-New.pdf
ATTACHMENT
SPLCONDITIONFORALLCONTRACT.pdf
ATTACHMENT
Rly.Bdsletterdated17.05.2004.pdf
ATTACHMENT
GCC-2022-ACS10_merged.pdf
ATTACHMENT
ProposedLocation.pdf
ATTACHMENT
ProposedlocaitonII.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .