Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Accepted-AOC AWARDED | |
| 2 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | Rejected-Technical TECHNICALLY NOT OK | |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical TECHNICALLY NOT OK |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00630 KVA, 6.6 KV / 440 Volt | ||||
| 2.00 | Cost of Copper wire/Strip for Primary & Secondary Coil, Size - 9Swg | 390 | Kg | 1,309 ₹5,10,510 Lowest |
| 3.00 | Insulation cost @ 15% of Sl. No. 1 | 1 | job | 76,576.5 ₹76,576.5 Lowest |
| 4.00 | Labour cost @ 15% of Sl. No. 1 | 1 | job | 76,576.5 ₹76,576.5 Lowest |
| 5.00 | Cost of LT Side Bushing Insulator with Studs for 630 KVA Transformer | 2 | Nos. | 10,070 ₹20,140 Lowest |
| 6.00 | Cost of Gasket/Corksheet for Conservator, Radiator, Top Cover and Inspection Cover | 1 | job | 13,780 ₹13,780 Lowest |
| 7.00 | Cost of Complete dismantling and re-assembling after repair with Painting of transformer | 1 | job | 13,780 ₹13,780 Lowest |
| 8.00 | Cost of Insulation Resistance(IR) test, Polarization index(PI) test High pottest & Disolved gas analysis test through NABL | 1 | job | 18,550 ₹18,550 Lowest |
| 9.00 | Contractor Profit | 1 | job | 14,282.65 ₹14,282.65 Lowest |
| 10.00 | Less SCRAP | 1 | no | 3,06,306 ₹-3,06,306 Lowest |
Tender Value
₹11.6 L
EMD Value
₹14,600
Closing Date
7 Aug 2025, 6:00 pmClosed
SO ENM
SO ENM OFFICE RAJRAPPA
Complete re-insulation and HT /LT stud bush replacement, testing through NABL repairing and rewinding with testing from NABL accredited Lab of Transformer of Township under Rajrappa Area.
2025_CCL_340364_1
GM(R)/ SO(ENM)/Rjp/25-26/Et/55dt 28.07.25
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹14,600
2 Dec 2025
28 Jul 2025
8 Aug 2025
29 Jul 2025
7 Aug 2025
29 Jul 2025
29 Jul 2025 - 1 Aug 2025
Amount
630 KVA, 6.6 KV / 440 Volt
Cost of Copper wire/Strip for Primary & Secondary Coil, Size - 9Swg
Insulation cost @ 15% of Sl. No. 1
Labour cost @ 15% of Sl. No. 1
Cost of LT Side Bushing Insulator with Studs for 630 KVA Transformer
Cost of Gasket/Corksheet for Conservator, Radiator, Top Cover and Inspection Cover
Cost of Complete dismantling and re-assembling after repair with Painting of transformer
Cost of Insulation Resistance(IR) test, Polarization index(PI) test High pottest & Disolved gas analysis test through NABL
Contractor Profit
Less SCRAP
63 KVA, 6.6 KV / 440 Volt
Cost of Copper wire/Strip for Primary & Secondary Coil, Size - 9Swg
Insulation cost @ 15% of Sl. No. 1
Labour cost @ 15% of Sl. No. 1
Cost of LT Side Bushing Insulator with Studs for 630 KVA Transformer
Cost of Gasket/Corksheet for Conservator, Radiator, Top Cover and Inspection Cover
Cost of Complete dismantling and re-assembling after repair with Painting of transformer
Cost of Insulation Resistance(IR) test, Polarization index(PI) test High pottest & Disolved gas analysis test through NABL
Contractor Profit
Less SCRAP
Complete re-insulation of TRANSFORMER with old copper wire ,315KVA, 6.6KV/440 V ,Sl.No-1189/04-05 -01 Nos
Cost of Copper wire 17SWG for primary and secondary winding
Insulating material @15% of sl 1
Labour cost @15% of sl 1
Cost of Replacement of HT bushing with Stud
Cost of Replacement of LT bushing with Stud
Cost of CRGO Laminated Core
Cost of corksheet 3'x2'x6 mm
Cost of Repairing Tap Changer
Cost of dismantling and reassembling of transformer
Insulation Resistance (IR) test , polarization index (PI) test ,Highpot test ,Disolved gas analysis test through NABL t
Less SCRAP
Contractor Profit
Onsite oil filtration ,replacement of damaged component , testing of insulating oil and other testing through NABL of 04 Nos of 630 KVA ,6.6 KV/440 V Transformer and 01 Nos of 750 KVA ,630 KVA/440 V Transformer
Cost of corksheet 3'x2'x6 mm
Cost of replacement of LT palm Connector for 750 KVA Transformer
Cost of replacement of LT bushing with stud for 750 KVA Transformer
Cost of repairing and checking of Oil Temperature indicator and winding Temperature Indicator
Online filtration of transformer oil
Cost of Repairing of Tap Changer
Insulation Resistance (IR) test , polarization index (PI) test ,Highpot test ,Disolved gas analysis test through NABL
Color and appearance test of transformer oil through NABL
Dielectric Breakdown Voltage (BDV) test of transformer oil through NABL
Moisture /water content test of transformer oil through NABL
Specific density / resistivity test of transformer oil through NABL
Contractor Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .