Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
5 Nov 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (P AND P)
Projects and Planning PD Admin Building FACT Ltd Udyogamandal Complex
Opening and Boxing up of Heat Exchangers in Lactam Plant
2020_FACT_592236_1
05061/2020-2021/E22307
Limited
Miscellaneous Works
Item Rate
180 days
FACT UDYOGAMANDAL
This tender is issued on limited tender basis and offers shall be accepted from the vendors on whom the enquiry is issued. Vendors interested in getting our future enquiries may contact DGM Projects and Planning-UC FACT Udyogamandal.
5 documents required · 5 mandatory
₹0
₹12,000
Yes
6 Nov 2020
21 Oct 2020
6 Nov 2020
21 Oct 2020
5 Nov 2020
21 Oct 2020
90 days
Mechanical work in Petro Plants UC
Opening & boxing up the end cups of Heat Exchanger, E-7102 Ammonium Sulphate cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7201 RA-cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7106 Anone stripper after condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7202 Neutralisation cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7303 Benzene distillation cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7302 Benzene distillation condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7317 Stripper after condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7401 IE feed cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7605 condenser cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7606 Evaporation 2nd step ejector condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7701 HW cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7103 A.S Preheater in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7301 A.S Preheater in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7604 C7603 condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7706 Surface condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7707 Surface condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7708 Surface condenser in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-9208 Vent cooler in Lactam plant.
Opening & boxing up the end cups of Heat Exchanger, E-7315 Benzene stripper cooler in Lactam plant.
Unbolting, Re-bolting, replacing of gaskets, leak testing of flange joints, dummies, manholes etc. with various pressure ratings in petro plant. Scope includes flange face Cleaning, gasket cutting, boxing up in leak proof manner. (Rate per bolt/stud to be quoted) Bolt/stud size # from M12 up to and including M20.
Unbolting, Re bolting, replacing of gaskets, leak testing of flange joints, dummies, manholes etc. with various pressure ratings in petro plant. Scope includes flange face cleaning, gasket cutting, and boxing up in leak proof manner.(Rate per bolt/stud to be quoted) Bolt/stud size # above M20 up toand including M36.
Unbolting, Re bolting, replacing of gaskets, leak testing of flange joints, dummies, manholes ,Heat Exchanger end cups etc. with various pressure ratings in petro plant. Scope includes flange face cleaning, gasket cutting, and boxing up in leak proof manner.(Rate per bolt/stud to be quoted)Bolt/stud size # above M36 up to and including M56
Patch welding of the corroded/thinned out portions of Tanks, Vessels, ducts etc., with MS plates of thickness ranging from 3mm to 12mm after cutting, removing the damaged portion and edge preparation as per instruction of the Engineer-in-charge
ARJUN CHANDRAN
JOSEPH V J
INFANT JESUS SMITH AND ENNG WORKS
K Thulaseedharan Pillai
FRANCIS VI
Mak engineering enterprises
stage.html
html • 0.03 MB
finance_622103.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .