Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC | ₹18.8 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Being higher bidder |
| 3 | Rejected-Technical H NO 368 ZUAREM TUEM PERNEM GOA | - | - | Rejected-Technical Being higher bidder |
| Sl No | Description | Qty | Unit | SAIBINI CONSTRUCTION L3 | jfjconstruction L2 | abdul latheef L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). | 6,060 | Sq.m. | 6.2 ₹37,572 | 5.9 ₹35,754 | 5 ₹30,300 Lowest |
| 2.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : b) All types of Ordinary rock including all types of laterite rock, blasting prohibited. | 65 | Cu.m. | 301 ₹19,565 | 300 ₹19,500 Lowest | 1,140 ₹74,100 |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for: a) Foundations, footings, bases for columns and mass concrete. | 259 | Sq.m. | 410 ₹1,06,190 | 407 ₹1,05,413 | 350 ₹90,650 Lowest |
| 4.00 | Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level. | 91 | Cu.m. | 7,010 ₹6,37,910 | 7,000 ₹6,37,000 | 6,400 ₹5,82,400 Lowest |
| 5.00 | Supplying at site 2.00 m long RCC standard struts. | 810 | Each | 540 ₹4,37,400 Lowest | 550 ₹4,45,500 | 548 ₹4,43,880 |
| 6.00 | 1.5 mt. height fencing with 2.00 mt. R.C.C. posts of standard 30 design placed at 3 mtr. apart embedded in cement concrete blocks, corner, end with 6 horizontal lines & every 10th post to be strutted with 9 horizontal lines & two diagonals of G.I. barbed wire / plain wire having weight of 9.33 kg/100 mtr. minimum between two posts, fitted and fixed with G.I. stapples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately). | 2,020 | Metre | 250 ₹5,05,000 | 230 ₹4,64,600 | 184 ₹3,71,680 Lowest |
Tender Value
₹19.4 L
EMD Value
₹38,780
Closing Date
15 Sept 2025, 10:00 amClosed
Executive Engineer, W.D.VII, W.R.D.
Dhargal, Pernem, Goa.
Fifth Revised Estimate of the Interstate Tillari Irrigation Project - Canal network in Goa. Reg. Providing fencing along the acquired boundary of B-8 Distributory of RBMC of TIP from Ch.2.990 Kms. to Ch.4.000 Kms. in Virnoda village in Pernem Taluka.
2025_WRD_24266_1
WRD/WDVII/PB/F3/25-26/TN-12/4
Open Tender
Civil Works
Item Rate
60 days
Virnoda Village in Pernem Taluka
As per Tender Notice, Form 6 etc.
3 documents required · 3 mandatory
₹3,000
₹38,780
16 Oct 2025
19 Aug 2025
17 Sept 2025
19 Aug 2025
15 Sept 2025
19 Aug 2025
Amount
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : b) All types of Ordinary rock including all types of laterite rock, blasting prohibited.
Centering and shuttering including struttings, propping etc. and removal of formwork for: a) Foundations, footings, bases for columns and mass concrete.
Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level.
Supplying at site 2.00 m long RCC standard struts.
1.5 mt. height fencing with 2.00 mt. R.C.C. posts of standard 30 design placed at 3 mtr. apart embedded in cement concrete blocks, corner, end with 6 horizontal lines & every 10th post to be strutted with 9 horizontal lines & two diagonals of G.I. barbed wire / plain wire having weight of 9.33 kg/100 mtr. minimum between two posts, fitted and fixed with G.I. stapples on wooden plug tied to 6mm bar nib with binding wire (cost of posts, struts, earthwork and concrete to be paid separately).
jfjconstruction (BID ID -52453)
SAIBINI CONSTRUCTION (BID ID -52303)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_24690.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .