Executive Engineer (civil)
1 st floor, TE Building, Ganga Nagar 3rd street, Manacaud, Thiruvananthapuram Kerala 695 009
Raising of Cable duct chambers near Kunjalumoodu Railway Bridge location in connection with Railway Doubling track project and NH development works at Trivandrum Recall 2
2026_BSNL_276650_1
04/NIT/EE/CIVIL/TVM/26-27
Open Tender
Civil Works
Item Rate
60 days
Trivandrum
please refer tender document
2 documents required · 2 mandatory
₹590
AO (Cash), O/o PGMT, BSNL, Thiruvananthapuram-1
₹4,657
4 Jun 2026
6 May 2026
15 May 2026
6 May 2026
14 May 2026
6 May 2026
6 May 2026 - 12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 1.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.4 | Cum | 16,00,722 | ₹6,40,288.8 |
| 2Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 2.01 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 2 | Sqm | 16,00,722 | ₹32,01,444 |
| 3Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | |||||
| 3.01 | Thermo-Mechanically Treated bars of grade Fe-500 D or more. | 110 | Kg | 16,00,722 | ₹17,60,79,420 |
| 4Steel work welded in built up section framed work including cutting hoisting fixing in position and applying a priming coat of approved steel primer usisng structural steel etc as required. | |||||
| 4.01 | In stringers, treads,landing etc. of stair cases, including use of chequered plate where evre required all complete. | 174 | Kg | 16,00,722 | ₹27,85,25,628 |
| 5 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.5 | Cum | 16,00,722 | ₹8,00,361 |
| 6Raising / Lowering of manhole RCC cover slab and frame upto 25 cm height to keep in alignment with the new road surface consisting of the following operations.i)Earth work in excavation/ Cutting bituninous surface around chamber side walls including dismantling bituminous road if any required.ii)Removing and stacking within 50 meter lead the RCC rectangular manhole cover [upto 3 Nos each of sizes upto 0.50X1.20m] protected on all edges with frame of galvanized angle sectioniii)Dismantle the chamber wall [made of RCC wall of thickness 300mm upto the required depth for removal of frame and down clamps.iv)Keep the dismantled outer frame with clamps in position and in alignment to the new road level and place the shuttering on side walls.v)Place the concrete of mix 1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size] on side walls for fixing outer frame. | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
recall2cableduct.pdf
Tender Documents • 1.32 MB
BOQ_323129.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .