Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-AOC 121004 | 1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical KOTTATHARA SOCIETY | IDUKKI | KERALA | 685501 | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | C KMUHAMMED NISAR L1 | Kottathara Labour Contract Co-operative Society L2 | ASHIN LAL L4 | ABDUL MUNEER N K L3 |
|---|---|---|---|---|---|---|---|
| 1.00Side protection | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 59.5 | cum | 230 ₹13,685 Lowest | 327.01 ₹19,457.1 | 335.74 ₹19,976.53 | 290 ₹17,255 |
| 1.00 | OD264493/2025-2026:DRY rubble masonry with hard stone in foundation and plinth up to plinth level Without Hard stone , including all cost ,conveyance and all labour charges etc | 138 | cum | 3,600 ₹4,96,800 Lowest | 3,614.14 ₹4,98,751.32 | 3,710.62 ₹5,12,065.56 | 3,750 ₹5,17,500 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.5 | cum | 6,700 ₹56,950 Lowest | 8,396.11 ₹71,366.94 | 8,620.24 ₹73,272.04 | 7,000 ₹59,500 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 412.5 | kilogram | 95 ₹39,187.5 Lowest | 102.2 ₹42,157.5 | 104.93 ₹43,283.63 | 98 ₹40,425 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 34 | sqm | 320 ₹10,880 Lowest | 351.03 ₹11,935.02 | 360.4 ₹12,253.6 | 360 ₹12,240 |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 67.94 | cum | 550 ₹37,367 | 405.18 ₹27,527.93 Lowest | 416 ₹28,263.04 | 500 ₹33,970 |
Tender Value
₹6.9 L
EMD Value
₹17,228
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst Engineer
OFFICE OF THE ASST.EXE ENGINEER ,KALPETTA BLOCK PANCHAYATH,P.O KALPETTA
Annual Plan-KPTA BP-P.No-224/25- Makkottukunnu SC Unnathi Side protectionPadinjarethara Kottathara Division- General Civil Work
2025_LSGD_795171_16
AEE/LID(EW)KPTA/3/2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
Kalpetta
P.Refer tender Documents
6 documents required · 6 mandatory
₹1,520
Yes
₹17,228
Yes
8 Jan 2026
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Amount
Side protection
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD264493/2025-2026:DRY rubble masonry with hard stone in foundation and plinth up to plinth level Without Hard stone , including all cost ,conveyance and all labour charges etc
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
Kottathara Labour Contract Co-operative Society (BID ID -2415576)
ABDUL MUNEER N K (BID ID -2415204)
ASHIN LAL (BID ID -2416122)
Bidder Name
C KMUHAMMED NISAR
Kottathara Labour Contract Co-operative Society
ABDUL MUNEER N K
ASHIN LAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1355253.xls
BOQ • 0.30 MB
viewsbd.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .