| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-AOC | ₹7.7 Cr | L1 | Accepted-AOC Reason |
| 2 | L2₹7.8 Cr+₹12.5 L (1.63%)Rejected-Finance | ₹7.8 Cr+₹12.5 L (1.63%) | L2 | Rejected-Finance unReasons |
| 3 | L3₹8.2 Cr+₹49.9 L (6.50%)Rejected-Finance NULL | ₹8.2 Cr+₹49.9 L (6.50%) | L3 | Rejected-Finance unReasons |
| 4 | L4₹8.2 Cr+₹57.0 L (7.43%)Rejected-Finance PLOT NO 54 UDYOG KENDRA II ECOTECH III GREATER NOIDA | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹8.2 Cr+₹57.0 L (7.43%) | L4 | Rejected-Finance unReasons |
| 5 | L5₹9.2 Cr+₹1.6 Cr (20.4%)Rejected-Finance | ₹9.2 Cr+₹1.6 Cr (20.4%) | L5 | Rejected-Finance unReasons |
Tender Value
₹12.3 Cr
EMD Value
₹24.6 L
Closing Date
15 Jan 2025, 12:00 pmClosed
SE BSR Circle PWDBulandshahar
SE BSR Circle PWDBulandshahar
Widening Strengthening of Kheliya Rewara road (ODR) in District Bulandshahar From (Ch. 0.000 to 9.750)
2025_CEMRT_990002_1
8833/ 96M(3)E-Tender BSRCircle/24 Dt.11.12.24
Open Tender
Civil Works - Roads
Lump-sum
365 days
Khurja
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹24.6 L
Yes
11 Feb 2025
4 Jan 2025
15 Jan 2025
4 Jan 2025
15 Jan 2025
4 Jan 2025
Amount
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared of area cleared But excluding GST
Scarifying the exiting bituminous surface to a depth of a depth of 50 mm and disposel of scarified material with in all lifts and lead upto 100 metersAs per derection of Engineer incharge and including all type of tolls , cess and taxes But excluding GST.
Earth work in embankment with Ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M in depth and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to required levels and slops . SI NO - 253(a) ,260& ,261 But excluding GST
Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. MORT&H Specification 301 Sr No 3.3 But excluding GST
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1 But excluding GST
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 Sr No 4.14 But excluding GST
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. But excluding GST
Providing and laying dense graded bituminous macadam Grading 2 with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects. But excluding GST
Providing and applying Tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bitumninous/granular surface cleaned with mechanical broom. But excluding GST
Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects But excluding GST
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 410 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing MORT&H Specification 602Sr No 6.2 But excluding GST
PCC Grade M10 1:4:8 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications as per MORTH specification clause No. 1500,1700 & 2100 S.I. No 279 But excluding GST
PCC Grade M15 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications as per MORTH specification clause No. 1500,1700 & 2100 Sr No 12.8 But excluding GST
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6 But excluding GST
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per MORTH specification clause No. 1300 & 2100 Sr No 13.1 But excluding GST
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per MORTH specification clause No. 1300 & 2200 Sr No 13.3 But excluding GST
Supply and laying of 350mm dia NP-3 Hume pipe including cost of labour T&P etc complete. But excluding GST
Supply and laying of 600mm dia NP-3 Hume pipe including cost of labour T&P etc complete. But excluding GST
Supply and laying of 1000mm dia NP-3 Hume pipe including cost of labour T&P etc complete. But excluding GST
B.P.Construction (BID ID -4853136)
Krishna Infratec (BID ID -4852708)
J S S Infratech (BID ID -4853414)
SHYAMA CONSTRUCTION (BID ID -4855266)
M/S R.K.Gupta Contractor (BID ID -4853251)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1747810.xls
BOQ • 0.31 MB
160113834.pdf
Tender Documents • 0.37 MB
160113836.html
Tender Documents • 0.05 MB
160472517.pdf
Tender Documents • 0.43 MB
SBD.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .