Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.4 L+₹19,473.03 (4.62%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
₹5.0 L
EMD Value
₹12,490
Closing Date
10 Oct 2018, 6:00 pmClosed
Vikraman Pillai M
Asst. EXECUTIVE ENGINEER LSGD DIVISION AYYANTHOLE THRISSUR 680 003
DPT-2018-19- KUZHUR GOVT HIGH SCHOOL MAINTANACE IN KUZHUR GRAMA PANCHAYATH (MALA BP) (SO266/19)
2018_LSGD_227289_2
TN-6/2018-19/201
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thrissur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,119
Yes
online
₹12,490
Yes
6 Jan 2021
3 Oct 2018
16 Oct 2018
3 Oct 2018
10 Oct 2018
3 Oct 2018
Amount
compoud wall construction
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.6.1.5 : Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
od146100/2018_2019 : Flooring with Interlocking cables 60mm thick (premium) minimum strength 4kg/m2 over a bed of 6mm metal filling in 50mm thick and compacting using earth hammer compacting machine hand operated including cost and conveyance of all materials labour charges pointing edges etc complete
M P XAVIER
Bidder Name
M P XAVIER
AKHILPAUL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_317027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .