Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC CHEMPANODA KATIKULAM ROAD PERAMBRA KOZHIKODE DISTRICT KERALA | KOZHIKODE | KERALA | 673525 | ₹14.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.7 L+₹450.58 (0.03%)Rejected-Finance KAVILUMPARA PO KOZHIKODE PIN 673513 | KOZHIKODE | KOZHIKODE | KERALA | 673513 | ₹14.7 L+₹450.58 (0.03%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical KOTTUR KERALA | - | - | Rejected-Technical L3 |
Tender Value
₹17.7 L
EMD Value
₹44,350
Closing Date
19 Jun 2026, 2:00 pmClosed
DIVISIONAL FOREST OFFICE NILAMBUR NORTH
DIVISIONAL FOREST OFFICE NILAMBUR NORTH
GENERAL-Cairns 175 Nos Akampadam FS- Estimate for the cost of Construction of 175 Nos Permanent Cairns at Various Places in Akampadam Forest Station under Edavanna range during 2025-26
2026_FD_855299_1
D-54045/2025
Open Tender
Agricultural or Forestry
Percentage
Nilambur
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,550
Yes
₹44,350
Yes
29 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | M2 | 16.7 | - |
| 2 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | M3 | 330.41 | ₹330.08 |
| 3 | OD102963/2025-2026 Random rubble masonry with locally collected hard stone hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) (Ref Spec 7.1.1) | - | M2 | - | - |
| 4 | 13.33.1 Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled
pointing | - | M2 | 1 | - |
| 5 | 13.7.1 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | - | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1445512.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_1445512.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .