Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance | ₹5.4 L | L1 | Accepted-Finance As per BOQ Chart |
| 2 | L2₹5.6 L+₹15,929.50 (2.93%)Accepted-Finance | ₹5.6 L+₹15,929.50 (2.93%) | L2 | Accepted-Finance As per BOQ Chart |
| 3 | Rejected-Technical | - | - | Rejected-Technical No relevant Experience |
| Sl No | Description | Qty | Unit | HARIS AHMAD RATHER L2 | M.S AIJAZ AHMAD BHAT L1 |
|---|---|---|---|---|---|
| 1.00TOE WALL | |||||
| 1.01 | Slip clearance in ordinary soils disposal lead upto 50 m and lift up to 1.5 m. | 62 | Cum | 110 ₹6,820 | 30 ₹1,860 Lowest |
| 1.02 | Supplying, filling, spreading and levelling stone boulders of size range 5cm to 20 cm, in recharge pit in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge. | 35.14 | Cum | 720 ₹25,300.8 Lowest | 800 ₹28,112 |
| 1.03 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc up to floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 60.5 | Cum | 7,755 ₹4,69,177.5 | 6,500 ₹3,93,250 Lowest |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 152.61 | Sqm | 280 ₹42,730.8 Lowest | 500 ₹76,305 |
| 1.05 | PVC pipes (working pressure 4 kg / cm2 ) 110 mm dia(B-type) for weep holes | 10 | Mtr | 170 ₹1,700 | 150 ₹1,500 Lowest |
| 1.06 | Carriage/Disposal of earth Avg lead 4 km | 62 | Cum | 200 ₹12,400 Lowest | 200 ₹12,400 Lowest |
| 1.07 | Carriage Avg lead 25 km soling | 35.14 | Cum | 10 ₹351.4 Lowest | 300 ₹10,542 |
| 1.08 | Cement avg lead 5 KM | 19 | MT | 10 ₹190 Lowest | 178 ₹3,382 |
| 1.09 | Sand avg lead 5KM | 27 | Cum | 10 ₹270 Lowest | 200 ₹5,400 |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
21 Aug 2026, 2:30 pmClosed
EXECUTIVE ENGINEER, GAS TURBINE DIVISION, PAMPORE
Pampore Pulwama
CONSTRUCTION OF PCC TOE WALL IN PLUM CONCRETE ALONG NORTH WEST SIDE OF GT PAMPORE
2026_SPDC_319204_1
GTD/PDC/TS/16 of 2026-27
Open Tender
Civil Works
Item Rate
45 days
Pampore
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
CP and AO Sgr
₹14,000
Yes
Pampore
9 Sept 2026
3 Aug 2026
22 Aug 2026
4 Aug 2026
21 Aug 2026
10 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1TOE WALL | |||||
| 1.01 | Slip clearance in ordinary soils disposal lead upto 50 m and lift up to 1.5 m. | - | Cum | - | - |
| 1.02 | Supplying, filling, spreading and levelling stone boulders of size range 5cm to 20 cm, in recharge pit in the required thickness for all leads and lifts all complete as per direction of Engineer-in-charge. | - | Cum | - | - |
| 1.03 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc up to floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | - | Sqm | - | - |
| 1.05 | PVC pipes (working pressure 4 kg / cm2 ) 110 mm dia(B-type) for weep holes | - | Mtr | - | - |
| 1.06 | Carriage/Disposal of earth Avg lead 4 km | - | Cum | - | - |
| 1.07 | Carriage Avg lead 25 km soling | - | Cum | - | - |
| 1.08 | Cement avg lead 5 KM | - | MT | - | - |
| 1.09 | Sand avg lead 5KM | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1056399.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .