Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC | ₹3.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 L+₹33,153.88 (9.39%)Rejected-AOC | ₹3.9 L+₹33,153.88 (9.39%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.0 L+₹45,595.85 (12.9%)Rejected-AOC | ₹4.0 L+₹45,595.85 (12.9%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | B I ABOOBACKER SIDIQ L2 | umanathan L1 | AYISHATH SAFIYA M I L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of Toilet Block | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.2 | cum | 326.57 ₹2,023.43 | 298.55 ₹1,849.82 Lowest | 338.41 ₹2,096.79 |
| 1.00 | OD98489/2024-2025: od1506400/2021_2022 :Laterite masonry with neatly dressed laterite stone of size 35 x 20 x 20 cm or nearest
size in cement mortar 1:6 for foundation and basement in including all cost of materials , labour charges etc. | 7.84 | cum | 6,307.24 ₹49,473.99 | 5,077.94 ₹39,831.36 Lowest | 5,756.65 ₹45,155.16 |
| 1.00 | OD98490/2024-2025: od1506400/2021_2022 :Laterite masonry with neatly dressed laterite stone of size 35 x 20 x 20 cm or nearest
size in cement mortar 1:6 for super structure in including all cost of materials , labour charges etc. | 11.54 | cum | 7,285.75 ₹84,048.41 | 5,810.17 ₹67,026.12 Lowest | 6,511.97 ₹75,122.09 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 5.52 | sqm | 692.56 ₹3,822.93 | 633.14 ₹3,494.93 Lowest | 717.68 ₹3,961.59 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 29.04 | sqm | 872.63 ₹25,341.18 | 797.76 ₹23,166.95 Lowest | 904.28 ₹26,260.29 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 21.4 | metre | 207.1 ₹4,431.94 | 189.33 ₹4,051.66 Lowest | 214.61 ₹4,592.65 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.3 | cum | 12,202.98 ₹40,318.65 | 11,155.92 ₹36,859.16 Lowest | 12,645.57 ₹41,780.96 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 180.04 | kilogram | 102.06 ₹18,374.98 | 93.3 ₹16,797.83 Lowest | 105.76 ₹19,041.14 |
| 1.01 | OD98491/2024-2025:PVC Door shutter | 3.12 | sqm | 1,169.05 ₹3,647.44 Lowest | 1,455.63 ₹4,541.57 | 2,883.28 ₹8,995.83 |
Tender Value
₹4.0 L
EMD Value
₹10,018
Closing Date
6 Jul 2026, 5:00 pmClosed
RASEENA C K
KASARAGOD BLOCK PANCHAYAT
MLA-SDF-2025-26- CONSTRUCTION OF TOILET TO KMAUP SCHOOL IN KUMBALA GP
2026_CRD_849698_2
689430-2026-C
Open Tender
Civil Works - Roads
Item Rate
90 days
KASARAGOD BLOCK PANCHAYAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹885
Yes
₹10,018
Yes
3 Sept 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Toilet Block | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | - | - |
| 1.002 | OD98489/2024-2025: od1506400/2021_2022 :Laterite masonry with neatly dressed laterite stone of size 35 x 20 x 20 cm or nearest
size in cement mortar 1:6 for foundation and basement in including all cost of materials , labour charges etc. | - | cum | - | - |
| 1.003 | OD98490/2024-2025: od1506400/2021_2022 :Laterite masonry with neatly dressed laterite stone of size 35 x 20 x 20 cm or nearest
size in cement mortar 1:6 for super structure in including all cost of materials , labour charges etc. | 1 | cum | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.006 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
| 1.007 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | - | - |
| 1.009 | OD98491/2024-2025:PVC Door shutter | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1450016.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
FORMOFTENDER.pdf
Tender Documents • 0.25 MB
AFFIDAVIT.pdf
Tender Documents • 0.24 MB
PREAGREE.pdf
Tender Documents • 0.26 MB
INTPACT.pdf
Tender Documents • 0.23 MB
EPAY.pdf
Tender Documents • 0.23 MB
BOQ_1450016.xls
BOQ • 0.26 MB
NITRETENDER7WORK.pdf
Tender Documents • 0.26 MB
sbd.pdf
Tender Documents • 1.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .